| Plan Review Notes For Permit 09080430 |
| Permit Number |
09080430 |
|
| Review Stop |
M |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2009-08-24 10:01:42 | 2007 FBC W/2009 REVISIONS | | | ADDITION | | | | | | 1) THE MECHANICAL PLANS SPECIFY A PACKAGE UNIT ON SHEET | | | 6.1. THE MANUFACTURER'S SPECS. THAT WERE SUBMITTED ARE | | | FOR A RHEEM SPLIT SYSTEM. PLEASE CORRECT. | | | | | | 2) PROVIDE THE UNIT SPECIFICATIONS ON THE MECHANICAL | | | PLANS. | | | | | | 3) SUBMIT HEATING AND COOLING LOAD SIZING CALCULATIONS | | | AS REQUIRED BY FBCR M1401.3 | | | | | | 4) THE PLANS SPECIFY A TOTAL AIR SUPPLY OF 350 CFM AND | | | A 2 TON SYSTEM. THE SYSTEM APPEARS TO BE OVER-SIZED. | | | PLEASE REVISE. | | | | | | 5) SPECIFY THE CAPACITY OF THE NEW BATH EXHAUST. ALSO | | | NOTE THAT THE BATHROOM EXHAUST SHALL DISCHARGE DIRECTLY | | | TO THE EXTERIOR OF THE BUILDING. SEE FBCR M1507.2 AND | | | M1507.3. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|