| Plan Review Notes For Permit 09080073 |
| Permit Number |
09080073 |
|
| Review Stop |
ENG |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2009-08-10 14:59:47 | PASSED WITH (3) PROVISOS: | | | | | | 1. PROVIDE DOCUMENTATION TO CONFIRM ADEQUATE PRESSURE | | | EXISTS FROM RECENT FLOW TEST IN EXISTING 4 INCH WATER | | | MAIN IN THE ALLEY TO THE SYSTEM. | | | | | | 2. PROVIDE DRAWING OF PROPOSED CROSS CONNECTIONS | | | THROUGH THE ALLEY BETWEEN THE 4 INCH WATER MAIN AND THE | | | BUILDING, INCLUDING BY-PASS OF EXISTING UTILITIES IN | | | THE ALLEY. | | | | | | 3. PROVIDE THE LOCATION OF THE D.D.C.V. IS BEHIND THE | | | BUILDING AND ACCESSIBLE. | | | | | | | | | PLEASE CONTACT THE REVIEWER WITH ANY QUESTIONS OR | | | COMMENTS: | | | | | | EMERY P. FABIAN, PROJECT COORDINATOR | | | CITY OF WEST PALM BEACH | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH FL 33401 | | | (561)-494-1048 OFFICE | | | |
|