Plan Review Notes
Plan Review Notes For Permit 09070711
Permit Number 09070711
Review Stop M
Sequence Number 1
Notes
Date Text
2009-09-23 08:59:35REVIEW #: 1ST REVISION
 ACTION: DENIED
  
 FBC 2004 CODE FAMILY W/ 2005 AND 2006 SUPPLEMENTS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 NOTE: THIS REVISION CONSTITUTES A COMPLETE REDESIGN OF
 THE HVAC SYSTEM FROM THE ORIGINAL PERMITTED SET FO
 PLANS. PLANS HAVE BEEN REVIEWED ACCORDINGLY.
  
 1. ARCHITECTURAL FLOOR PLAN SHOWS CORRIDOR WALLS AS
 FIRE RESISTANCE RATED. DUCT PENETRATIONS AND AIR
 TRANSFER OPENINGS AT CORRIDOR WALLS SHALL BE PROTECTED
 WITH FIRE AND SMOKE DAMPERS IN ACCORDANCE WITH FBC-M
 607.5.3 AND FBC-M 607.5.4. SEVERAL PENETRATIONS OR
 OPENINGS SHOW FIRE DAMPERS WITH NO SMOKE DAMPERS WHILE
 OTHERS SHOW NO PROTECTION AT ALL. PLEASE CHECK ALL
 OPENINGS AND PENETRATIONS OF CORRIDOR WALLS AND SHOW
 COMPLIANCE WITH THESE SECTIONS.
  
 2. PAGE M-1, FLOOR PLAN SHOWS A FIRE DAMPER IN THE WALL
 ABOVE THE DOOR INTO ROOM STUDIO 1. THERE IS NO DUCT OR
 TRANSFER OPENING SHOWN AT THIS LOCATION. PLEASE
 CLARIFY. IF A TRANSFER OPENING EXISTS AT THIS LOCATION,
 PROVIDE A SIZE IN ACCORDANCE WITH FBC-M 601.4 AND
 603.1.
  
 3. PLEASE ADD THE SYMBOL USED FOR A MOTORIZED VOLUME
 DAMPER TO THE SYMBOL LEGEND. THIS WILL ALLOW A THOROUGH
 REVIEW TO DETERMINE WHETHER MOTORIZED DAMPERS ARE BEING
 PROVIDED AT ALL REQUIRED LOCATIONS IN ACCORDANCE WITH
 FBC-B 13-409.AB.3.3 FOR SHUTOFF DAMPER CONTROLS. ALSO,
 PLEASE CHECK THE ENTIRE SYMBOL LEGEND TO ENSURE ALL
 SYMBOLS AND ABBREVIATIONS USED ON PLANS ARE REPRESENTED
 IN THE LEGEND AND CORRESPOND WITH PLANS.
  
 4. THE SYMBOL LEGEND ON PAGE M-1 INDICATES A ???SD???
 SYMBOL FOR DUCT MOUNTED SMOKE DETECTORS WHILE THE FLOOR
 PLAN APPEARS TO USE A DIFFERENT SYMBOL. PLEASE
 COORDINATE SYMBOLS USED ON FLOOR PLAN WITH THOSE SHOWN
 IN THE SCHEDULE IN ORDER TO FACILITATE A REVIEW FOR
 COMPLIANCE WITH THE SMOKE DETECTOR REQUIREMENTS OF
 FBC-M 606.2.
  
 5. AHU-1 AND AHU-2 SERVE A COMBINED SUPPLY DUCT. DUCT
 SMOKE DETECTORS ARE REQUIRED ON THE SUPPLY AND RETURN
 OF EACH UNIT IN ACCORDANCE WITH FBC-M 606.2.2. FLOOR
 PLAN APPEARS TO BE MISSING THE RETURN SMOKE DETECTOR ON
 AHU-2.
  
 6. PAGE M-1, ALL OUTSIDE AIR DUCTS ON FLOOR PLAN ARE
 MISSING SIZE. PROVIDE MISSING INFORMATION BY SHOWING
 ALL DUCT SIZES ON PLANS IN ACCORDANCE WITH FBC-M 603.1
 AND FBC-B 13-410.AB.1.2.
  
 7. SUPPLY BRANCH DUCT SERVING ROOM 105 IS MISSING SIZE.
 PROVIDE MISSING INFORMATION BY SHOWING ALL DUCT SIZES
 ON PLANS IN ACCORDANCE WITH FBC-M 603.1 AND FBC-B
 13-410.AB.1.2.
  
 8. THE SUPPLY REGISTERS IN MEN???S H/C RESTROOM,
 WOMEN???S H/C RESTROOM AND ADJACENT JANITOR???S CLOSET
 ARE MISSING CFM AND GRILL DESIGNATIONS. PROVIDE MISSING
 DATA ON PLANS TO SHOW MINIMUM AIRFLOW REQUIREMENTS PER
 FBC-M 603.1 AND FBC-B 13-410.AB.4.1.
  
 9. EXHAUST FANS 6, 7 AND 8 APPEAR TO BE LOCATED IN A
 PLENUM CEILING. EXHAUST DUCTS UNDER POSITIVE PRESSURE
 SHALL NOT PASS THROUGH A PLENUM IN ACCORDANCE WITH
 FBC-M 601.3.
  
 10. IT IS NOT CLEAR ON PLANS WHETHER THE WOOD RAFTERS
 AND ROOF DECKING ABOVE THE PLENUM CEILING AREAS ARE
 EXPOSED TO THE PLENUM. THESE ITEMS AND ANY OTHER
 COMBUSTIBLE MATERIALS SHALL NOT BE EXPOSED TO THE
 PLENUM IN ACCORDANCE WITH FBC-M 602.2.1.
  
 11. ENERGY CODE COMPLIANCE FORM INDICATES ROOF IS
 INSULATED TO R-11.53. CAVITIES BENEATH A ROOF DECK
 WHICH WILL BE USED AS SUPPLY OR RETURN PLENUMS SHALL
 HAVE AN INSULATED ROOF. THE INSULATION SHALL HAVE AN
 R-VALUE OF AT LEAST R-19 IN ACCORDANCE WITH FBC-B
 13-404.AB.2.
  
 12. GRAVITY RELIEF VENTILATOR SCHEDULE SHOWS GRF-5 AS
 SERVING AHU-10. HOWEVER, FLOOR PLAN SHOWS AHU-10 AS
 SERVED BY GRF-4. PLEASE CORRELATE FLOOR PLANS AND
 EQUIPMENT SCHEDULES TO VERIFY MINIMUM REQUIRED
 VENTILATION RATES CAN BE PROVIDED IN ACCORDANCE WITH
 FBC-M 403.3.
  
 13. FLOOR PLAN SHOWS A FABRIC DUCT USED IN SEVERAL
 LOCATIONS. PROVIDE SUBMITTAL DATA FOR THE FABRIC DUCT
 TO SHOW COMPLIANCE WITH FBC-M 603.4.
  
 14. FLOOR PLAN SHOWS AHU-1 AND AHU-2 PROVIDING 4000 CFM
 EACH WHILE THE AHU SCHEDULE AND COOLING LOAD
 CALCULATIONS SHOW EACH UNIT PROVIDING 2900 CFM.
 COORDINATE FLOOR PLANS WITH EQUIPMENT SCHEDULE TO SHOW
 REQUIRED AIRFLOWS IN ACCORDANCE WITH FBC-M 603.1, FBC-M
 403.3 AND FBC-B 13-410.AB.4.1.
  
 15. OUTDOOR AIR SCHEDULE CALLS FOR AHU-1 AND AHU-2 TO
 PROVIDE 4500 COMBINED CFM OF OUTDOOR AIR WHILE THE
 FLOOR PLAN SHOWS THE SYSTEM WITH A TOTAL OF 5800 CFM OF
 RETURN, WHICH EQUALS THE TOTAL OF THE SUPPLY. HOW WILL
 THIS ALLOW FOR INTRODUCTION OF OUTDOOR AIR? THE FLOOR
 PLAN SHOWS THAT CO2 SENSORS WILL CONTROL THE MOTORIZED
 ODA DAMPERS, PRESUMABLY BASED ON DEMAND. HOW WILL THE
 REQUIRED VENTILATION RATE BE PROVIDED WITHOUT MOTORIZED
 DAMPERS TO REDUCE RETURN AIRFLOW IN CONJUNCTION WITH
 MODULATION OF THE ODA DAMPERS? PLEASE SHOW ON PLANS HOW
 THE REQUIRED VENTILATION RATE IS TO BE ACHIEVED IN THIS
 LOCATION IN ACCORDANCE WITH FBC-M 403.3.
 NOTE: IS ANY RELIEF AIR TO BE PROVIDED IN THIS AREA TO
 ALLOW FOR THIS INTRODUCTION OF OUTDOOR AIR?
  
 16. AHU-3 SERVING THE WORK/AREA SHOWS TWO 16X16 R/A
 TRANSFER OPENINGS, WITH ONE OF THESE LOCATED IN A
 CLOSET. THE CLOSET APPEARS TO BE SEPARATED FROM THE
 CONDITIONED SPACE BEING SERVED BY AHU-3. SHOW HOW
 BALANCED RETURN IS TO BE ACHIEVED IN THIS AREA IN
 ACCORDANCE WITH FBC-M 601.4.
  
 17. IN ROOM 103, WHAT IS THE PURPOSE OF THE 30X18 SOUND
 TRAP SHOWN BETWEEN ROOM 103 AND ROOM 100? PLEASE
 CLARIFY PER FBC-M 603.1.
  
 18. PAGE M-1, SEVERAL ???SOUND TRAP??? RETURN AIR
 TRANSFER OPENINGS ARE SHOWN ON THE PLANS WITH NO SIZE.
 PLEASE SHOW THE SIZE OF EACH SOUND TRAP FOR BALANCED
 RETURN IN ACCORDANCE WITH FBC-M 601.4.
  
 19. WHAT IS THE HEIGHT OF THE ROOFTOP CHILLER PAD ABOVE
 GRADE? PROVIDE A MEANS OF PERMANENT ACCESS TO THE
 SERVICE PLATFORM IN ACCORDANCE WITH FBC-M 306.5.
 PROVIDE WIND RESISTANCE DATA FOR ALL PROPOSED OUTDOOR
 APPLIANCES AND EQUIPMENT, SUCH AS GRF???S CONDENSING
 UNITS AND CHILLER. PROVIDE DETAILS FOR WIND RESISTANT
 INSTALLATION OF CHILLER, GRF???S AND ANY ASSOCIATED
 ROOF CURBS IN ACCORDANCE WITH FBC-M 301.13. ALSO,
 PROVIDE PRODUCT APPROVAL FOR PRE-ENGINEERED A/C STANDS
 USED FOR ROOFTOP CONDENSERS IN ACCORDANCE WITH FAC RULE
 9B-72 AND FBC-B 106.3.3.
  
 NOTE: PLEASE RESPOND TO EACH COMMENT IN WRITING,
 DESCRIBING HOW EACH COMMENT WAS ADDRESSED AS WELL AS
 WHERE THE RELEVANT INFORMATION CAN BE LOCATED WITHIN
 THE SUBMITTED DOCUMENTS.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved