| 2009-09-10 12:03:32 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL, BUILDING PLANS EXAMINER |
| | 561-805-6724 [email protected] |
| | |
| | FBC FLORIDA BUILDING CODE 2007 WITH 2009 SUPPLEMENTS |
| | FBC EB FLORIDA BUILDING CODE 2007 EXISTING BUILDING |
| | CODE |
| | FBC R FLORIDA BUILDING CODE 2007 RESIDENTIAL |
| | FBC* CITY OF WEST PALM BEACH AMENDMENTS TO THE FBC2004 |
| | FAC FLORIDA ADMINISTRATIVE CODE |
| | FS FLORIDA STATUTE |
| | |
| | 1. A DETAIL WAS PROVIDED FOR THE INFILL, BUT NOT FOR |
| | THE DOOR AND WINDOW. PLEASE PROVIDE A DETAIL OF |
| | PROPOSED CONSTRUCTION. FBC R301 |
| | |
| | 2. FLORIDA STATE OR LOCAL PRODUCT APPROVAL REQUIRED FOR |
| | THE DOOR AND WINDOW, FAC9B72. THEY MAY BE AVAILABLE AT |
| | WWW.FLORIDABUILDING.ORG. THE RESPONSE LETTER STATES |
| | THAT THIS IS INCLUDED IN ANOTHER PERMIT. THAT PERMIT |
| | HAS PRODUCT APPROVALS FROM 2007; THE CODE IN EFFECT AT |
| | THAT TIME IS NO LONGER IN EFFECT AND THE PRODUCT |
| | APPROVALS PROVIDED AT THAT TIME MAY OR MAY NOT BE CODE |
| | COMPLIANT AND MUST BE REVIEWED AT THIS TIME. FOR |
| | INSTALLATION OF A DOOR AND A WINDOW TO BE INCLUDED IN |
| | THE SCOPE OF WORK FOR THIS PERMIT, PLEASE PROVIDE THE |
| | DOCUMENTS REQUESTED. A FLORIDA STATE PRODUCT APPROVAL, |
| | MIAMIDADE NOA, OR LOCAL PRODUCT APPROVAL CAN BE |
| | SUBMITTED. PLEASE PROVIDE TWO COMPLETE COLLATED SETS OF |
| | PERMIT DOCUMENTS. |
| | |
| | 3. N/A. |
| | |
| | 4. IT APPEARS THAT, BASED ON THE PLAN PROVIDED, YOU ARE |
| | CUTTING A HOLE IN WHAT WAS ORIGINALLY A BEARING |
| | EXTERIOR WALL (NEW CLOSET). PROVIDE A STRUCTURAL |
| | DETAIL. |
| | |
| | 5. DECLARE WIND DESIGN CRITERIA; WIND ZONE (140MPH |
| | MIN), AND EXPOSURE CLASSIFICATION. |
| | THE WIND DESIGN CRITERIA SHOULD BE INCORPORATED INTO |
| | THE PLAN. ALSO INCLUDE EXPOSURE CLASSIFICATION. |
| | |
| | 6. PROVIDE A DETAIL FOR THE WALL INFILL. |
| | A STRUCTURAL DETAIL WAS PROVIDED FOR THE WALL INFILL; |
| | HOWEVER, IT IS NOT CLEAR HOW THE DETAIL PROPOSED WILL |
| | MEET DESIGN AND UPLIFT AND OTHER REQUIREMENTS OF FBC |
| | R301. SOME CONNECTORS DO NOT HAVE F1/F2 RATINGS, OTHERS |
| | DO NOT HAVE ANY UPLIFT RESISTANCE. PROVIDE CALCULATIONS |
| | TO SHOW THAT EACH CONNECTOR MEETS THE REQUIREMENTS |
| | SPECIFIC TO YOUR JOB, AND/OR REVISE CONNECTOR SELECTION |
| | AS NEEDED. THE DETAIL DOES NOT ALL INFORMATION; IT IS |
| | RECOMMENDED THAT YOU INCLUDE A SECTION WHICH SHOWS |
| | INSULATION, VAPOR BARRIER, SHEATHING, SIDING, ETC. OR |
| | OTHERWISE INCORPORATE THAT INFORMATION INTO THE DETAIL. |
| | |