| 2009-05-28 17:44:49 | 1. SHEET M-3. KEY NOTE #4 CALLS FOR SCREEN AT DRYER |
| | EXHAUST OUTLET. SCREEN SHALL NOT BE INSTALLED AT DRYER |
| | EXHAUST DUCT TERMINATION IN ACCORDANCE WITH FBC-M |
| | 504.4. |
| | 2. SHEET M-5. OUTSIDE AIR CALCULATIONS REFERENCE ASHRAE |
| | 62.1-2007. THIS IS NOT THE CORRECT REFERENCE STANDARD. |
| | PLEASE CONFIRM VENTILATION DESIGN IS IN COMPLIANCE WITH |
| | ASHRAE 62.1-2004 IN ACCORDANCE WITH FBC-M 403.4 AND |
| | FBC-M CHAPTER 15. |
| | 3. SHEET M-7. PROVIDE AUXILIARY DRAIN PROTECTION. ON |
| | DOWN-FLOW UNITS AND ALL OTHER COILS THAT DO NOT HAVE A |
| | SECONDARY DRAIN AND DO NOT HAVE A MEANS TO INSTALL AN |
| | AUXILIARY DRAIN PAN, A WATER-LEVEL MONITORING DEVICE |
| | SHALL BE INSTALLED INSIDE THE PRIMARY DRAIN PAN IN |
| | ACCORDANCE WITH FBC-M 307.2.3.1. |
| | 4. CONDENSING UNIT IS SHOWN ON A PRE-ENGINEERED A/C |
| | STAND. THIS IS DEFINED AS A STRUCTURAL COMPONENT IN |
| | ACCORDANCE WIT FAC RULE 9B-72. PROVIDE PRODUCT APPROVAL |
| | FOR THE STAND TO BE USED WITH INSTALLATION |
| | INSTRUCTIONS. |
| | 5. SHEET M-7. RTU NOTE #7 CALLS FOR CONDENSATE DRAINS |
| | TO BE ROUTED TO THE NEAREST FLOOR DRAIN. CONDENSATE |
| | SHALL NOT DISCHARGE INTO THE SANITARY SEWER SYSTEM IN |
| | ACCORDANCE WITH CITY ORDINANCE. CONDENSATE PIPING SHALL |
| | BE DISCHARGED AS SHOWN ON SHEET P-4 IN ACCORDANCE WITH |
| | FBC-M 307.2.1. |
| | 6. SHEET M-7. EQUIPMENT AND APPLIANCES THAT ARE EXPOSED |
| | TO WIND SHALL BE DESIGNED AND INSTALLED TO RESIST WIND |
| | PRESSURES AS DETERMINED IN ACCORDANCE WITH THE FLORIDA |
| | BUILDING CODE, BUILDING. PROVIDE MANUFACTURER???S DATA |
| | OR OTHER SUCH SUPPORTING DOCUMENTATION SHOWING RTUS, |
| | CONDENSERS AND ROOF CAPS ARE DESIGNED FOR WIND |
| | RESISTANCE IN ACCORDANCE WITH FBC-M 301.12. |
| | |
| | PLEASE FEEL FREE TO CONTACT ME DURING NORMAL BUSINESS |
| | HOURS IF YOU HAVE ANY QUESTIONS ABOUT THIS REVIEW. I |
| | MAY BE REACHED AT 561-805-6650 OR BY EMAIL AT |
| | [email protected] |
| | |