| 2009-08-28 08:47:52 | NEEDS RE-STAMPS FOR MECH AND PLUMBING AS SHEETS WERE |
| | CHANGED OUT AND THESE ARE ON THE SAME NEW SHEETS WITH |
| | ELECTRICAL. |
| 2009-08-28 08:46:44 | |
| | ** PROVISO/REDLINED PLANS** |
| | |
| | *** THE FOLLOWING ARE SET FORTH AS A PROVISO. MAKE |
| | ADJUSTMENTS BEFORE INSPECTIONS |
| | |
| | 1) NOTE: THE CONDENSING UNIT LOAD OVER CURRENT |
| | PROTECTION/BREAKER ON LOAD CALCULATIONS IS SHOWN AT |
| | 2-25AMP HOWEVER PANEL SCHEDULE FOR THE SAME CU IS SHOWN |
| | AS 30AMP. |
| | THE AHU ON THE LOAD CALCULATIONS INDICATES A 30AMP |
| | BREAKER WHICH IS THE MINIMUM REQUIRED PER 424.3B. |
| | HOWEVER THE PANEL SCHEDULE FOR THE NEW AHU INDICATES A |
| | 2-25AMP BREAKER. THESE SEEM TO HAVE BEEN REVERSED. |
| | LOADS ARE TO BE SHOWN PER 220.83B. NO DE-RATING IS |
| | PERMITTING WHEN ADDING TO AN EXISTING SERVICE. |
| | |
| | 2) NOTE: THE RISER STILL INDICATES AN *EQUIPMENT |
| | GROUNDING CONDUCTOR* AHEAD OF 150AMP MAIN. THIS IS TO |
| | BE VIF AS IT SHOULD NOT BE INSTALLED. THIS CREATES |
| | OBJECTIONABLE CURRENTS PER 250.6, 250.24. |
| | THE RISER IS MISSING AN *EQUIPMENT GROUNDING CONDUCTOR |
| | FROM NEW 100AMP MAIN TO SUB PANEL *B*. AS REQUIRED PER |
| | 250.24,250.110,250.122. |
| | |
| | 3) NOTE: PLEASE SEE 422.13 AS THE WATER HEATER LOAD |
| | NEEDS TO BE SHOWN AT 125%. ( SEE HANDBOOK AS THIS IS A |
| | CONTINUOUS LOAD FOR FEEDERS AND SERVICES UNDER THE 2005 |
| | NEC. |
| | |
| | **** IMPORTANT: |
| | IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT |
| | TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO |
| | CONTACT THIS REVIEWER. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW II |
| | CONSTRUCTION SERVICES DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |