Plan Review Notes
Plan Review Notes For Permit 09030472
Permit Number 09030472
Review Stop E
Sequence Number 1
Notes
Date Text
2009-03-26 19:57:22** DENIED REVIEW **
  
  
 1) NOTE: THE SEAL ON THE ARCHITECTURAL PLANS DOES NOT
 MEET FLORIDA ADMINISTRATIVE CODE 61G1-16.002 FOR
 CORRECT TYPE OF SEAL. THE INITIAL RULING OF A 2INCH
 SEAL WAS ADOPTED IN 1989. THIS HAS SINCE BEEN UPDATED
 HOWEVER HAS BEEN A REQUIREMENT SINCE THAT DATE. AS THIS
 REVIEWER MAY BE THE LAST TO ISSUE PLANS FOR PERMIT THIS
 IS REQUIRED WHETHER OR NOT COMMENT IS MADE BY OTHER
 TRADES.
 THE ARCHITECT MAY COME INTO OFFICE AND RE-SEAL PLANS
 WITH CORRECT SEAL.
  
 2) NOTE: PLEASE SEE FAC 69A-60.003 AND .004 AS THE 2006
 NFPA-101 LIFE SAFETY CODE AND 2006 NFPA-1 HAS BEEN
 ADOPTED SINCE DECEMBER 31ST 2008. THE 2007 FBC HAS ALSO
 SINCE ADOPTED THESE AS OF MARCH 1ST, 2009.
  
 3) NOTE: PLEASE PROVIDE NOTES FOR ACCESS CONTROL
 DEVICES/CLARIFY THE EGRESS WHICH SHALL NOT BE IMPEDED
 UNDER NORMAL OR EMERGENCY CONDITIONS. PLEASE SEE
 NFPA-101 CHAPTER 7.2.1.5, 7.2.1.6.2
 PLEASE PROVIDE INFORMATION ON DEVICES.
 PLEASE KNOW SEPARATE PERMITS ARE REQUIRED FOR LOW
 VOLTAGE SYSTEMS. THIS MAY BE REMOVED FROM SETS OF PLANS
 AND BROUGHT BACK IN UNDER SEPARATE PERMIT.
 IF ALL LOW VOLTAGE SYSTEMS ARE LEFT IN SETS ONCE OK
 WITH REVIEWS, THEN THE SUB CONTRACTORS FOR LOW VOLTAGE
 WORK WILL BE ONLY REQUIRED TO REFERENCE PLANS FOR MAIN
 BUILDING PERMIT. AT THAT TIME A TURN AROUND PERMIT WILL
 BE ISSUED.
  
 4) NOTE: PLANS INDICATE THE CU ON ROOF HOWEVER PLEASE
 INDICATE IF THERE IS GOING TO BE A NEW OR EXISTING GFI
 AS REQUIRED PER 210.8B3, 210.63
  
 5) NOTE: AS THE IDF ROOM DOES NOT THE MINIMUM
 REQUIREMENTS OF NEC 645.4 PLEASE PLACE NOTE ON PLANS
 WHICH STATES
 * NO WIRING METHODS PERMITTED IN NEC 645 IS PERMITTED*.
 BASED ON PLANS THIS IS NOT AN IT AND THE CODE DOES NOT
 PERMIT ANY OF THE LESS STRINGENT WIRING METHODS IN 645.
 FOR INFORMATION; IT PERSONNEL MAY WANT TO BE CONSULTED
 ON WIRING METHODS INTENDED. IF RATING THE ROOM AND
 OTHER ITEMS LISTED IN 645.4 IS DONE AT THIS TIME THEN
 WIRING METHODS IN 645 WOULD BE PERMITTED.
  
 6) NOTE: PLEASE PROVIDE MANUFACTURES SPECS/CUT SHEETS
 FOR THE PROPOSED UPS. PLEASE BE SURE PAPERWORK CONTAINS
 THE REQUIRED LISTING FROM A NRTL. (NATIONALLY
 RECOGNIZED TESTING LABORATORY).
 110.3. 90.7
 FBC 106.1.1, .1.2 FOR ADDITIONAL INFORMATION NEEDED.
  
 7) NOTE: PLEASE PLACE NOT ON PLANS FOR REQUIRED SIGNAGE
 AT ROOM/AREA 1418 FOR PANELS 2H AND 3L. NO STORAGE
 PERMITTED* ELECTRICAL CLOSET* OR WORDS TO THAT AFFECT.
 110.26, 240.24,
  
 8) NOTE: PLEASE RE-FIGURE LIGHTING PERFORMANCE
 CALCULATIONS AND COORDINATE WITH THE LIGHTING CONTROL
 PANEL LOADS. AN EXAMPLE IS CORRIDOR 1418. 465, ON PANEL
 485 ON CALCULATIONS.
  
 9) NOTE: PLEASE SEE 450.3 AS THE MAXIMUM OCP ON THE
 45KVA TRANSFORMER IS 70AMPS UNLESS MEETING NOTE #3. IF
 TRANSFORMER MEETS NOTE #3, PLEASE PROVIDE INFORMATION
 OF THAT UNIT ON PLANS.
 IF NOT THE MAXIMUM OCP IS 125%. PLEASE ADJUST.
  
 10) NOTE: PLEASE SEE PANEL 2H, THIS IS LISTED AS A
 125AMP PANEL AND 42 CIRCUITS HOWEVER PANEL SCHEDULE
 ALSO LIST THIS PANEL AS 30POLES.
 PLEASE COORDINATE. THIS IS THE SAME TYPE OF COMMENT FOR
 2UPS AND 1H.
 110.3
  
 11) NOTE: PLEASE SEE PANEL 2L AS THIS IS SHOWN AS
 150AMP MCB ON RISER AND 225AMP MLO ON SCHEDULE.
 THE OTHER PANELS SUCH AS 1L AND 3L LISTS BOTH MCB AND
 MLO ON PANELS PLEASE CLARIFY. MCB IS REQUIRED PER
 240.21, 408.36
  
 12) NOTE: PLEASE SEE PANEL 2UPS, WHICH IS SHOWN AS
 60AMP MCB AS REQUIRED ON RISER HOWEVER PANEL SCHEDULE
 LIST THIS AS MAIN LUG ONLY IN TWO LOCATIONS.
 THIS IS THE SAME FOR PANEL 1UPS ALSO.
 PLEASE COORDINATE AS REQUIRED. 106.1.1, 106.1.2
 NEC 240.21
  
 ** IMPORTANT **
 ONCE AUDIT/REVIEWS ARE COMPLETE AND PLANS ARE PICKED UP
 FOR CORRECTIONS, PLEASE BE SURE TO COMPLETELY REMOVE
 ALL OLD/VOIDED SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO TWO COMPLETE SETS FOR REVIEW AND STAMPING.
 DO NOT LEAVE ANY OLD/VOIDED SHEETS IN SETS.
 PLEASE DO NOT ATTACH SUPPORTING DOCUMENTS TO PLANS. ANY
 ADDITIONAL DOCUMENTATION SUCH AS PRODUCT APPROVALS,
 SPEC/CUT SHEETS, CALCULATIONS ETC. SHOULD BE PLACED
 INTO TWO SETS/FOLDERS/BINDERS ETC.
 PLEASE KNOW ONLY ONE SET OF THE OLD/VOIDED SHEETS
 SHOULD BE SUBMITTED FOR REFERENCE.
 THIS WILL HELP IN THE AUDIT/REVIEW PROCESS AND AVOID
 ANY DELAYS.
  
  
 IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT
 TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO
 CONTACT THIS REVIEWER.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved