| Plan Review Notes For Permit 09020107 |
| Permit Number |
09020107 |
|
| Review Stop |
B |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2009-05-20 19:34:42 | APPROVED WITH PROVISOS AS NOTED BY JULIO GOMEZ IN PRIOR | | | REVIEW, EXCEPT: | | | 1. MUST PROVIDE ELEVATION CERTIFICATES A. PRIOR TO THE | | | CONSTRUCTION OF THE LOWEST FLOOR LEVEL. B.AFTER THE | | | FIRST FLOOR LEVEL IS CONSTRUCTED, AND C. AT THE TIME OF | | | THE FINAL INSPECTION. ALL ELEVATION CERTIFICATES ARE TO | | | SIGNED AND SEALED AS APPROPRIATE BY A PROFESSIONAL LAND | | | SURVEYOR AND ARE TO BE PROVIDED TO THE FIELD INSPECTOR | | | FOR RETURN TO THE CITY FILE. |
|