| Date |
Text |
| 2009-09-03 08:25:55 | 09/03/09 PASSED WITH PROVISOS |
| | |
| | REVIEW FOR STORMWATER ELEMENTS AT 233 WENNONAH PLACE |
| | |
| | #1 STORM CALCULATIONS DATED 09/02/09 HAVE BEEN RECEIVED |
| | AND APPROVED. |
| | CONTRACTOR SHALL BUILD THE PARKING AREA BASED ON THE |
| | CALCULATIONS SUPPLIED AND REVISE |
| | THE AS-BUILT PLAN ACCORDINGLY. (CALCS ARE ATTACHED TO |
| | THE PLAN) |
| | |
| | #2 SHEET ONE DOES NOT AGREE WITH THE PLAN SHOWN ON SHT |
| | 2 A (NO HANDICAP PARKING SHOWN) |
| | ( CONTRACTOR NEEDS TO BUILD AS PER CITY APPROVED SITE |
| | PLAN.) |
| | |
| | CONTRACTOR SHALL BE RESPONSIBLE FOR THIS CORRECTION |
| | DURING CONSTRUCTION: |
| | |
| | #1 SHEET 2B PAVING AND DRAINAGE DETAILS: |
| | PRECAST INLET TYPE "C" (OPTION) DETAIL NEEDS TO SHOW OR |
| | STATE THAT ROCK UNDER STRUCTURE MUST BE WRAPPED IN |
| | FILTER FABRIC |
| | #2 SHEET 2B PAVING AND DRAINAGE DETAILS: |
| | EXFILTRATION TRENCH DETAIL (OPTION) |
| | REVISE NOTE #2 TO INCLUDE "BOTTOM" ALSO. |
| | #3 SHEET 2B PAVING AND DRAINAGE DETAILS: |
| | ADD TO 12"X12" SUMP A NOTE ADDING SS HARDWARE CLOTH |
| | (MESH) AT SUMP ENTRY POINT. |
| | #4 SHEET 2B PAVING AND DRAINAGE DETAILS: |
| | REVISE NOTE #2 TO INCLUDE "BOTTOM" ALSO. |
| | |
| | PLEASE FEEL FREE TO CONTACT ME IF ANY FURTHER QUESTIONS |
| | OR CONCERN. |
| | |
| | MANUEL JULIAN GONZALEZ |
| | ENGINEERING PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 494-1085 |
| | FAX: (561) 494-1116 |
| | MOBILE: (561) 644-7301 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |