| Date |
Text |
| 2009-01-15 09:09:01 | ZONING REVIEW: FAILED |
| | |
| | ** PLAN REVIEW** |
| | |
| | 1) UNITY OF TITLE WILL REQUIRED WITH BUILDING PERMIT |
| | SUBMISSION. |
| | 2) THE PROJECT WILL BE REQUIRED TO BE REPLATTED PRIOR |
| | TO CERTIFICATE OF OCCUPANCY; PLEASE CONTACT VINCE NOEL |
| | AT 561 494-1040. |
| | 3) TDR CERTIFCATE FOR INCENTIVE DEVELOPMENT AREA SHALL |
| | BE REQUIRED. |
| | 3) TREE REMOVAL PERMIT APPROVAL SHALL BE REQUIRED FOR |
| | RELOCATION OF EXISTING TREES WHICH OCCUR ON THE SITE. |
| | PLEASE COORDINATE WITH ROBERT KUSSNER, LANDSCAPE |
| | PLANNER, AT (561) 822-1435. |
| | 4) LP-1 - THE HIBISCUS STREET LANDSCAPE PLAN SHALL BE |
| | MODIFIED IN COORDINATION WITH CITY LANDSCAPE PLANNER TO |
| | ACCOMMODATE DATE PALMS AND ADJUST PLANT MATERIALS AT |
| | DRIVEWAY BULB-OUTS. |
| | 5) C-4 - LIGHT POLES ARE INDICATED TO BE |
| | RELOCATED.STREET LIGHT POST AND FIXTURE SHALL BE CITY |
| | STANDARD - ?LUMEC? CAT. |
| | #175MH-L50-PCFC-SE3-OTA/240V-SFO-1-BKTX (BLACK): MOGUL |
| | BASE; POST TOP MOUNTING; LAMP CENTER IS 17?-0? ABOVE |
| | GRADE HEIGHT, OR SIMILAR AS APPROVED BY THE CITY. |
| | 6) C-6 - LIGHT POLES SHALL BE ALIGNED WITH THE CENTER |
| | POINT OF STREET TREES (NORTH TO SOUTH). |
| | 7) A1.01 - PROVIDE DIMENSIONS FROM BUILDING TO PROPERTY |
| | LINE ON ALL SIDES, AND BUILDING FACE TO BACK OF CURB ON |
| | HIBISCUS STREET AT SEVERAL LOCATIONS. |
| | 8) A2.02 (AND OTHERS) - ALL COMPACT SPACES SHALL BE |
| | MARKED AS "COMPACT" ON THE PAVING OR WITH VERTICAL |
| | SIGNAGE. |
| | 9) A2.02 - WILL BOLLARDS BE REQUIRED IN FRONT ON DOOR |
| | 204? PLEASE CONFIRM. NO BOLLARDS SHALL BE PLACED IN ADA |
| | ACCESSIBLE ROUTES OR SIDE AILES IN ANY LOCATION. |
| | 10) A2.02 (AND OTHERS) - PROVIDE A DIMENSION STRING |
| | INDICATING DEPTH OF PARKING SPACES IN A FEW LOCATIONS |
| | AND FOR STANDARD AND COMPACT SPACES. |
| | 11) PLANS SHALL INDICATE TRASH STAGING AND PICK-UP |
| | LOCATIONS SPECIFICALLY. PLEASE PROVIDE A NOTE THAT |
| | DESCRIBES HOWN THE PICK PROCESS WILL OPERATION FOR |
| | REVIEW AND CONFIRMATION BY ENGINEERING SERVICES. |
| | 12) PHOTOMETRICS FOR SIDEWALK AREAS ALONG HIBISCUS |
| | SHALL BE PROVIDED. |
| | 13) C-6- CONFIRM ALL SLOPES AND TRANSITIONS FROM |
| | BUILDING TO SIDEWALK. NO RAILINGS OR ACCESS RAMPS ARE |
| | PERMITTED IN PUBLIC SIDEWALK. |
| | 14) CONFIRM COMPLIANCE WITH DAC CASE APPROVAL FOR ALL |
| | VARIANCES. |
| | 15) LP-1- ON EAST SIDE OF BUILDING AT STREET, WILL A |
| | FENCE OR GATE BE PROVIDED TO PREVENT PEOPLE FROM |
| | WALKING BACK TO THE BREAKFAST AREA? UNCLEAR IN THESE |
| | DRAWINGS, THOUGH HEDGING IS INDICATED. |
| | 16) CONFIRM THAT ADA VAN ACCESSIBLE HEIGHTS ARE |
| | PROVIDED. INDICATE IN BUILDING SECTIONS. |
| | 17) ANY CANOPIES OR OTHER ARCHITECTURAL FEATURES WHICH |
| | IMPINGE UPON THE RIGHT-OF-WAY WILL REQUIRE AIR RIGHTS |
| | EASEMENTS. |
| | 18) BUILDING SIGNAGE SHALL COMPLY WITH CITY |
| | REQUIREMENTS AND SHALL REQUIRE A SEPARATE BUILDING |
| | PERMIT SUBMITTAL. |
| | |
| | MATT FLIS - 822-1445 |
| | |
| | |