Plan Review Notes
Plan Review Notes For Permit 08120552
Permit Number 08120552
Review Stop M
Sequence Number 1
Notes
Date Text
2009-01-13 20:02:16REVIEW #: 1ST **PLAN CHECK ONLY**
 ACTION: DENIED
  
 FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 1. PLEASE COORDINATE THE ARCHITECTURAL AND LIFE SAFETY
 PLANS REGARDING THE LOCATION OF ALL FIRE RESISTANCE
 RATED WALL ASSEMBLIES. THIS IS NEEDED IN ORDER TO
 DETERMINE THE LOCATION OF REQUIRED PROTECTION AT DUCT
 PENETRATIONS AND AIR TRANSFER OPENINGS IN ACCORDANCE
 WITH FBCM 607.5. EXAMPLES: SEE LAUNDRY ROOM 132 AREA
 AND FIRE PUMP ROOM 145. THIS IS NOT INTENDED TO BE AN
 EXHAUSTIVE LIST OF ALL DISCREPANCIES. PLEASE CHECK ALL
 SIMILAR PLANS FOR COORDINATION.
  
 2. M1: THE FLOOR PLAN SHOWS MULTIPLE DUCT PENETRATIONS
 OF FIRE RESISTANCE RATED WALL ASSEMBLIES WITH NO
 PROTECTION. THERE ARE TOO MANY LOCATIONS ON THIS PAGE
 TO LIST. SHOW HOW THESE PENETRATIONS ARE TO BE
 PROTECTED IN ACCORDANCE WITH FBCM 607.5. ALSO, THE
 SPECIFIC LOCATION AND INSTALLATION DETAILS OF EACH FIRE
 DAMPER AND SMOKE DAMPER SHALL BE SHOWN AND PROPERLY
 IDENTIFIED ON THE BUILDING PLANS BY THE DESIGNER IN
 ACCORDANCE WITH FBCM 607.8.
  
 3. M1: PLAN NOTE #9 APPEARS TWICE ON FLOOR PLAN: ONCE
 FOR IT ROOM AND FIRE COMMAND CENTER. THE CONDENSER FOR
 THE FIRE COMMAND CENTER IS LOCATED ON THE SECOND FLOOR
 OF THE GARAGE AND NOT ON THE ROOF OF THE EMPLOYEE BREAK
 ROOM AS INDICATED BY THE NOTE. PLEASE CLARIFY AND
 CORRECT. FBCB 106.1.1.
  
 4. M1: WHILE IT APPEARS THAT ALL FAN-COIL UNITS (FCU)
 ON THE EQUIPMENT SCHEDULE HAVE UNIQUE DESIGNATIONS, THE
 MARKINGS WHICH IDENTIFY INDIVIDUAL FCUS ON THE FLOOR
 PLANS ARE UNCLEAR. EXAMPLE: FCU 1-19 APPEARS IN
 EMPLOYEE BREAK ROOM 129 AND PREFUNCTION 122. EXAMPLE:
 THE FCU IN WORKROOM 113 HAS NO DESIGNATION AND DOES NOT
 APPEAR ON THE FIRST FLOOR FCU SCHEDULE. THIS IS NOT
 INTENDED TO BE AN EXHAUSTIVE LIST. PLEASE CHECK ALL FCU
 DESIGNATIONS ON FLOOR PLANS AND COORDINATE WITH
 EQUIPMENT SCHEDULE AND PIPING PLANS. FBCM 304.1 AND
 FBCB 106.1.1
  
 5. M1: THE EXHAUST FAN ABOVE GM OFFICE 110 HAS NO
 DESIGNATION ON FLOOR PLAN AND CANNOT BE CORRELATED WITH
 EQUIPMENT SCHEDULE. PLEASE IDENTIFY THIS AND ALL
 APPLIANCES ON FLOOR PLANS TO FACILITATE A THOROUGH
 REVIEW AND CONFIRM SUITABILITY OF THE APPLIANCE FOR THE
 INTENDED USE. FBCM 501.1 AND FBCB 106.1.1
  
 6. M1: THE KITCHEN GREASE EXHAUST DUCT IS SHOWN ON
 FLOOR PLAN PENETRATING AT LEAST ONE FIRE RESISTANCE
 RATED WALL ASSEMBLY. A GREASE DUCT SERVING A TYPE I
 HOOD THAT PENETRATES A FIRE RATED CEILING, FIRE RATED
 WALL OR FLOOR SHALL BE ENCLOSED FROM THE POINT OF
 PENETRATION TO THE OUTLET TERMINAL IN ACCORDANCE WITH
 FBCM 506.3.10. THE DUCT SHALL BE ENCLOSED IN ACCORDANCE
 WITH THE BUILDING CODE REQUIREMENTS FOR SHAFT
 CONSTRUCTION PER THIS SECTION. SEE FBCM 506.3.10 FOR
 ADDITIONAL REQUIREMENTS RELATED TO THIS SHAFT
 ENCLOSURE.
  
 7. M1: KITCHEN EXHAUST DUCT SHALL SLOPE AT A MINIMUM OF
 1/4 INCH PER FOOT IN THE DIRECTION OF THE HOOD IN
 ACCORDANCE WITH FBCM 506.3.7. GIVEN THE LENGTH OF THE
 HORIZONTAL DUCT, PLEASE VERIFY THAT THIS SLOPE IS
 POSSIBLE WHILE MAINTAINING REQUIRED CEILING HEIGHTS.
 ALSO, ANY PORTION OF SUCH SYSTEM HAVING SECTIONS NOT
 PROVIDED WITH ACCESS FROM THE DUCT ENTRY OR DISCHARGE
 SHALL BE PROVIDED WITH CLEANOUT OPENINGS IN ACCORDANCE
 WITH FBCM 506.3.8. CLEANOUTS LOCATED ON HORIZONTAL
 SECTIONS OF DUCTS SHALL BE SPACED NOT MORE THAN 20 FEET
 APART IN ACCORDANCE WITH FBCM 506.3.9.
  
 8. M1: THE 50X30 DUCT ATTACHED TO THE 100% FRESH AIR
 UNIT FOR MAKEUP AIR, DOES IT ONLY GO UP TO THE SECOND
 FLOOR OR DOES IT ALSO GO TO CEILING GRILLS ON THE FIRST
 FLOOR? THE DESIGN INTENT IS UNCLEAR SINCE PAGE M2 SHOWS
 A 40X22 DUCT FROM THE FIRST FLOOR AT THIS LOCATION, NOT
 50X30. PLEASE COORDINATE PAGES, ENSURING DUCT IS
 PROPERLY SIZED FOR THE REQUIRED AIRFLOW. FBCM 304.1 AND
 FBCB 106.1.1
  
 9. M1: PLAN NOTE #4 APPEARS IN CENTER OF SERVICE
 CORRIDOR 127 BUT ITS INTENT AT THIS LOCATION IS
 UNCLEAR. IT STATES ?DOUBLE WALL INSTALLED D ROOF CAP.?
 PLEASE CLARIFY THE NOTE AND ITS INTENT AT THIS
 LOCATION. FBCB 106.1.1.
  
 10. M1: THE FIRST FLOOR APPEARS TO BE SEPARATED INTO
 MULTIPLE SMOKE ZONES. THESE ZONES ARE NOT IDENTIFIED
 ANYWHERE ON PLANS. ARE THESE SMOKE ZONES SEPARATED BY
 SMOKE BARRIERS? THERE IS NOT ENOUGH INFORMATION
 PROVIDED TO PERFORM A THOROUGH REVIEW OF THE SMOKE
 CONTROL SYSTEMS IN THIS BUILDING. THE CONSTRUCTION
 DOCUMENTS SHALL INCLUDE SUFFICIENT INFORMATION AND
 DETAIL TO ADEQUATELY DESCRIBE THE ELEMENTS OF THE
 DESIGN NECESSARY FOR THE PROPER IMPLEMENTATION OF THE
 SMOKE CONTROL SYSTEMS. THESE DOCUMENTS SHALL BE
 ACCOMPANIED BY SUFFICIENT INFORMATION AND ANALYSIS TO
 DEMONSTRATE COMPLIANCE WITH THESE PROVISIONS IN
 ACCORDANCE WITH FBCB 909.2. A RATIONAL ANALYSIS
 SUPPORTING THE TYPES OF SMOKE CONTROL SYSTEMS TO BE
 EMPLOYED, THEIR METHODS OF OPERATION, THE SYSTEMS
 SUPPORTING THEM AND THE METHODS OF CONSTRUCTION TO BE
 UTILIZED SHALL ACCOMPANY THE SUBMITTED CONSTRUCTION
 DOCUMENTS AND SHALL INCLUDE, BUT NOT BE LIMITED TO, THE
 ITEMS INDICATED IN SECTIONS 909.4.1 THROUGH 909.4.6 IN
 ACCORDANCE WITH FBCB 909.4. THIS APPLIES TO THE
 COMPLETE SYSTEM THROUGHOUT THE BUILDING. THERE WILL BE
 ADDITIONAL COMMENTS RELATED TO THIS ITEM LATER IN THIS
 REVIEW.
  
 11. M1 THROUGH M7: PLEASE CLARIFY THE HVAC SYMBOL
 LEGENDS ON EACH PAGE. THERE ARE MULTIPLE SYMBOLS AND
 ABBREVIATIONS USED ON FLOOR PLANS WHICH ARE NOT
 REPRESENTED IN THE SYMBOL LEGEND. EXAMPLE: THE SYMBOL
 WHICH INDICATES ON THE LEGEND THAT IT REPRESENTS A FIRE
 DAMPER IS IDENTICAL TO THE SYMBOL WHICH REPRESENTS
 EXISTING R/A. NEITHER ONE APPEARS TO BE REPRESENTATIVE
 OF AN ACTUAL SYMBOL ON THE FLOOR PLANS. ALSO, WHY ARE
 THERE INDICATIONS IN THE LEGEND FOR ?EXISTING?
 MATERIALS? THIS PROJECT IS 100% NEW CONSTRUCTION WITH
 NO EXISTING CONDITIONS. PLEASE CLARIFY AND CORRECT.
 FBCB 106.1.1
  
 12. M1: THE LAUNDRY ROOM COMBUSTION AIR CALCULATIONS
 INDICATE OPENING SIZE OF COMBUSTION AIR DUCTS IS BASED
 ON 1 SQ.IN PER 4000 BTU/H. THIS FORMULA IS ONLY
 APPLICABLE WHEN COMMUNICATING WITH THE OUTDOORS THROUGH
 VERTICAL DUCTS. WHEN HORIZONTAL DUCTS ARE USED, AS
 SHOWN ON THIS FLOOR PLAN, EACH OPENING SHALL HAVE A
 MINIMUM SIZE OF 1 SQ.IN PER 2000 BTU/H IN ACCORDANCE
 WITH FBCFG 304.6.1. THIS REQUIRES EACH OPENING TO BE
 THE MINIMUM SIZE, NOT THE SIZE OF THE TWO DUCTS
 COMBINED. SHOW HOW ADEQUATE COMBUSTION AIR SHALL BE
 PROVIDED FOR THESE APPLIANCES IN ACCORDANCE WITH FBCFG
 304.6. ALSO, THE PLANS REFERENCE THE FBC, MECHANICAL,
 WHILE THE GOVERNING CODE IS THE FBC, FUEL GAS. PLEASE
 CORRECT.
  
 13. M1: GARAGE AREA FLOOR PLAN SHOWS A PLENUM CEILING
 IN THIS AREA BUT THERE ARE DUCTS SHOWN. PLEASE CLARIFY
 WHETHER THIS IS A DUCTED OR PLENUM SYSTEM. FBCM 603.1,
 FBCB 106.1.1. ALSO, IS THE PARKING VENT FAN SHOWN IN
 THIS AREA A SUPPLY OR EXHAUST FAN? AIRFLOW DIRECTIONAL
 ARROWS AND INTAKE LOUVER INDICATE EXHAUST BUT THE
 EMERGENCY MODE NOTE INDICATES IT IS A SUPPLY FAN. NOTE:
 IF THIS IS A SUPPLY FAN, IT EXCEEDS 2000 CFM AND WOULD
 REQUIRE A DUCT SMOKE DETECTOR IN ACCORDANCE WITH FBCM
 606.2.1.
  
 14. M1 GENERATOR ROOM: NO INFORMATION WAS PROVIDED
 REGARDING THE GENERATOR, FUEL SOURCE, FUEL STORAGE,
 PIPING, REFUELING OR LOCATION OF GENERATOR EXHAUST.
 PROVIDE ALL MISSING INFORMATION REQUIRED TO DEMONSTRATE
 COMPLIANCE WITH FBCM 401.5, 915.1 AND 915.2. LIQUID
 FUELED GENERATOR INSTALLATIONS SHALL ALSO COMPLY WITH
 NFPA 37, NFPA 30 AND IF PROVIDING EMERGENCY POWER FOR
 LIFE SAFETY SYSTEMS, NFPA 110.
  
 15. M1: IN BREAKFAST ROOM 103, FLOOR PLAN SHOWS TWO
 SMOKE EXHAUST GRILLS BUT ONLY ONE HAS A CFM AND GRILL
 DESIGNATION. PLEASE CORRECT.
  
 16. M1 THRU M3: THE ZONE FANS DO NOT CORRESPOND WITH
 FLOOR PLANS AND EQUIPMENT SCHEDULE. EXAMPLE: THE ZONE
 #2 FAN ON PAGE M3 SHOWS 6000 CFM BUT THE FLOOR PLAN ON
 M1 CALLS FOR 5600 CFM WHILE THE EQUIPMENT SCHEDULE ON
 M12 ONLY CALLS FOR 1040 CFM. WHICH IS CORRECT? PLEASE
 CLARIFY THE DESIGN INTENT AS WELL AS THE SPECIFIC
 LOCATION OF EACH APPLIANCE BY COORDINATING THE FLOOR
 PLANS, SCHEDULES AND DESIGN REQUIREMENTS TO DEMONSTRATE
 COMPLIANCE WITH FBCM 513.2 AND FBCB 106.1.1.
  
 17. M1, M3, M12: THE EXHAUST FANS SHOWN ON FLOOR PLANS
 AT FIRE COMMAND ROOM 126 AND MECHANICAL ROOM 302 ARE
 BOTH MARKED AS ZONE 3. THE SCHEDULE ON M12 SHOWS ZONE 3
 AT THE FIRE COMMAND ROOM 126. WHICH IS CORRECT? THE
 ZONE 3 FAN ON PAGE M3 CALLS FOR 10,440 CFM WHILE THE
 ZONE 3 FAN ON M1 CALLS FOR 3600 CFM. THERE IS NO FAN ON
 THE EQUIPMENT SCHEDULE WHICH CORRESPONDS WITH THE 10400
 CFM WHICH IS CALLED FOR ON THE FLOOR PLAN. PLEASE
 CLARIFY THE DESIGN INTENT AS WELL AS THE SPECIFIC
 LOCATION OF EACH APPLIANCE BY COORDINATING THE FLOOR
 PLANS, SCHEDULES AND DESIGN REQUIREMENTS TO DEMONSTRATE
 COMPLIANCE WITH FBCM 513.2 AND FBCB 106.1.1.
  
 18. M1: THERE IS AN UNDESIGNATED EXHAUST FAN ABOVE GM
 OFFICE 110. PLEASE GIVE THIS FAN A DESIGNATION ON THE
 FLOOR PLAN AND IDENTIFY THE SMOKE ZONE ASSOCIATED WITH
 THIS FAN PER FBCM 513.2.
  
 19. M2: THERE ARE MULTIPLE DUCT PENETRATIONS AND AIR
 TRANSFER OPENINGS SHOWN ON FLOOR PLAN AT FIRE
 RESISTANCE RATED WALL AND FLOOR/CEILING ASSEMBLIES
 WITHOUT PROTECTION. EXAMPLES: THE 24X24 DUCT
 PENETRATIONS FROM THE 1ST FLOOR AND UP TO THE 3RD
 FLOOR, THE 8X8 SUPPLY FROM THE 3RD FLOOR, THE TOILET
 EXHAUST FROM THE 1ST FLOOR, THE LOUVER PENETRATION FROM
 THE WOMEN?S RESTROOM INTO THE PARKING GARAGE AREA.
 THESE ARE ONLY EXAMPLES AND NOT INTENDED TO BE AN
 EXHAUSTIVE LIST. PLEASE CHECK THE ENTIRE FLOOR PLAN TO
 ENSURE ALL OPENINGS AND PENETRATIONS IN RATED
 ASSEMBLIES ARE PROTECTED IN ACCORDANCE WITH FBCM
 SECTION 607.
  
 20. M2: THE TWO 24X24 SMOKE EXHAUST DUCTS IN THE
 PARKING GARAGE ADJACENT TO THE PREFUNCTION AND LOBBY
 AREAS ARE EXPOSED TO VEHICLE TRAFFIC. DUCTS INSTALLED
 IN LOCATIONS WHERE THEY ARE EXPOSED TO MECHANICAL
 DAMAGE BY VEHICLES OR FROM OTHER CAUSES SHALL BE
 PROTECTED BY APPROVED BARRIERS IN ACCORDANCE WITH FBCM
 603.13.
  
 21. M2: EF 2-1, WHICH APPEARS ADJACENT TO A STAIR
 ENCLOSURE, IS NOT SHOWN ON THE EQUIPMENT SCHEDULE ON
 PAGE M12. PLEASE CLARIFY. ALSO, IS THIS A SUPPLY OR
 EXHAUST FAN? BASED ON THE STAIR ENCLOSURE RISER DIAGRAM
 IT APPEARS TO BE A SUPPLY FAN FOR STAIR PRESSURIZATION.
 IF THIS IS THE CASE, THIS FAN IS SHOWN TO BE WITHIN THE
 BUILDING. THIS FAN IS REQUIRED TO BRING ALL AIR
 DIRECTLY FROM THE OUTDOORS AND BE SEPARATED FROM THE
 REST OF THE BUILDING BY MIN. 2 HOUR FIRE RESISTANCE
 RATED CONSTRUCTION IN ACCORDANCE WITH FBCM 401.4. THE
 LOCATION OF THE INTAKE FOR THIS SYSTEM IS ALSO SUBJECT
 TO THE REQUIREMENTS OF FBCM 401.5.1.
  
 22. M2: FLOOR PLAN SHOWS FCU 2-1 IN VESTIBULE 204 AND
 ELEV. MACHINE ROOM 205. WHICH IS THE CORRECT LOCATION
 FOR THIS FCU? PLEASE COORDINATE FLOOR PLAN WITH
 EQUIPMENT SCHEDULE ON M12 AND C.U. PIPING DIAGRAM ON
 M13.
  
 23. M2: PROVIDE THE MISSING SIZE OF THE RECTANGULAR
 SUPPLY DUCT IN MEETING ROOM 201 IN ACCORDANCE WITH FBCM
 603.1 AND FBCB 106.1.1.
  
 24. M2: THE KITCHEN EXHAUST FAN IS SHOWN ON THE PLANS
 DIRECTLY ADJACENT TO THE BUILDING EXTERIOR AND THE
 PARAPET WALL. EXHAUST OUTLETS SHALL BE LOCATED NOT LESS
 THAN 10 FEET HORIZONTALLY FROM PARTS OF THE SAME OR
 CONTIGUOUS BUILDINGS IN ACCORDANCE WITH FBCM
 506.3.12.3. PLEASE SHOW THE EXHAUST TERMINATION IN A
 LOCATION WHICH COMPLIES WITH THIS SECTION.
  
 25. M2: IT IS NOT CLEAR ON PLANS HOW THE LOW ROOF ABOVE
 THE EMPLOYEE BREAK ROOM WILL BE ACCESSED FOR SERVICE,
 MAINTENANCE OR REPLACEMENT OF THE APPLIANCES INSTALLED
 AT THIS LOCATION. WHERE EQUIPMENT AND APPLIANCES
 REQUIRING ACCESS ARE INSTALLED ON ROOFS OR ELEVATED
 STRUCTURES AT A HEIGHT EXCEEDING 16 FEET, SUCH ACCESS
 SHALL BE PROVIDED BY A PERMANENT APPROVED MEANS OF
 ACCESS IN ACCORDANCE WITH FBCM 306.5. PLEASE SHOW A
 PERMANENT MEANS OF ACCESS TO THIS SPACE.
  
 26. M2: FLOOR PLAN SHOWS A 3 INCH VTR NEXT TO THE
 KITCHEN MAKEUP AIR FAN INTAKE. FRESH AIR INTAKES SHALL
 NOT BE LOCATED CLOSER THAN 10 FEET FROM ANY VENT OUTLET
 OR SANITARY SEWER VENT OUTLET IN ACCORDANCE WITH FBCM
 401.5.1. PLEASE SHOW THE DISTANCE BETWEEN THIS VENT AND
 THE INTAKE OF THE MAKEUP AIR UNIT TO BE IN COMPLIANCE
 WITH THIS SECTION.
 27. M2: THE EQUIPMENT SCHEDULE ON M12 CALLS FOR FCU 2-3
 AT THE MENS/WOMENS RESTROOMS. NO SUCH FCU COULD BE
 FOUND ON THE FLOOR PLANS. PLEASE COORDINATE THIS FLOOR
 PLAN WITH EQUIPMENT SCHEDULE ON M12 AND C.U. PIPING
 DIAGRAM ON M13 IN ACCORDANCE WITH FBCM 603.1 AND FBCB
 106.1.1.
  
 28. M3: THE EVACUATION FAN INTAKE THROUGH THE WALL FROM
 MECHANICAL ROOM 302 INTO THE STAIR/PREFUNCTION ROOM IS
 MISSING A CFM DESIGNATION. PLEASE PROVIDE THE MISSING
 INFORMATION IN ACCORDANCE WITH FBCM 513.2 AND FBCB
 106.1.1.
  
 29. M3: FLOOR PLAN SHOWS FCU 3-6 IN VESTIBULE 301 AND
 ELEVATOR MACHINE ROOM 304. WHICH LOCATION IS CORRECT
 FOR THIS FCU? WHAT IS THE CORRECT DESIGNATION FOR THE
 FCU WHICH IS INCORRECTLY IDENTIFIED ON THE FLOOR PLAN?
 PLEASE COORDINATE THIS FLOOR PLAN WITH EQUIPMENT
 SCHEDULE ON M12 AND C.U. PIPING DIAGRAM ON M13 IN
 ACCORDANCE WITH FBCM 603.1 AND FBCB 106.1.1.
  
 30. M3: IN CONJUNCTION WITH THE ABOVE COMMENT, CFU 3-5
 AND FCU 3-6 DO NOT APPEAR ON THE FCU SCHEDULE ON PAGE
 M12. PLEASE COORDINATE THIS FLOOR PLAN WITH EQUIPMENT
 SCHEDULE ON M12 AND C.U. PIPING DIAGRAM ON M13 IN
 ACCORDANCE WITH FBCM 603.1 AND FBCB 106.1.1.
  
 31. MECHANICAL ROOM 303 IS SERVING AS A RETURN AIR
 PLENUM. THIS ROOM APPEARS TO BE CONSTRUCTED OF
 UNFINISHED CONCRETE BLOCK ACCORDING TO ARCHITECTURAL
 PLANS. BUILDING CAVITIES WHICH WILL BE USED AS RETURN
 AIR PLENUMS SHALL BE LINED WITH A CONTINUOUS AIR
 BARRIER MADE OF DURABLE NON-POROUS MATERIALS IN
 ACCORDANCE WITH FBCM 603.8. ALSO, CAVITIES DESIGNED FOR
 AIR TRANSPORT SUCH AS MECHANICAL CLOSETS, CHASES, AIR
 SHAFTS, ETC. SHALL BE LINED WITH AN AIR BARRIER AND
 SEALED IN ACCORDANCE WITH SECTION 603.9 AND SHALL BE
 INSULATED IN ACCORDANCE WITH TABLE 13-410.1.ABC.2.2 OF
 CHAPTER 13 OF THE FLORIDA BUILDING CODE, BUILDING. OF
 PRIMARY CONCERN ARE THE MECHANICAL ROOM WALLS ADJACENT
 TO THE PARKING GARAGE AND THE ELEVATOR MACHINE ROOM.
 THE OTHER TWO WALLS WILL COMPLY WITH THIS 603.8
 EXCEPTION: SURFACES BETWEEN THE PLENUM AND CONDITIONED
 SPACES FROM WHICH THE RETURN/MIXED AIR IS DRAWN. PLEASE
 SHOW HOW THESE WALLS ARE TO BE INSULATED AND FINISHED
 IN ACCORDANCE WITH THESE SECTIONS.
  
 32. M3: THERE ARE MULTIPLE DUCT PENETRATIONS AND AIR
 TRANSFER OPENINGS SHOWN ON FLOOR PLAN AT FIRE
 RESISTANCE RATED WALL AND FLOOR/CEILING ASSEMBLIES
 WITHOUT PROTECTION. EXAMPLE: THE SUPPLY DUCT
 PENETRATIONS AND AIR TRANSFER OPENINGS AT MECHANICAL
 ROOM 303. THESE ARE ONLY EXAMPLES AND NOT INTENDED TO
 BE AN EXHAUSTIVE LIST. PLEASE CHECK THE ENTIRE FLOOR
 PLAN TO ENSURE ALL OPENINGS AND PENETRATIONS IN RATED
 ASSEMBLIES ARE PROTECTED IN ACCORDANCE WITH FBCM
 SECTION 607.
  
 33. M3: MECHANICAL ROOM 302 FLOOR PLAN SHOWS TWO
 FIRE/SMOKE DAMPERS INLINE IN THE SMOKE EXHAUST
 DUCTWORK. THERE IS NO FIRE OR SMOKE BARRIER OR
 PARTITION SHOWN AT THESE LOCATIONS. WHAT IS THE PURPOSE
 OF THESE OPENING PROTECTIVES AT THESE LOCATIONS? FIRE
 DAMPERS, SMOKE DAMPERS AND COMBINATION FIRE/SMOKE
 DAMPERS LOCATED WITHIN AIR DISTRIBUTION AND SMOKE
 CONTROL SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH
 THE REQUIREMENTS OF THIS SECTION, AND THE
 MANUFACTURER?S INSTALLATION INSTRUCTIONS AND LISTING
 PER FBCM 607.
  
 34. M4: EF 4-1 IS IDENTIFIED ON THE EQUIPMENT SCHEDULE
 AS A STAIR PRESSURIZATION FAN. IS THIS A SUPPLY FAN?
 BASED ON THE STAIR ENCLOSURE RISER DIAGRAM IT APPEARS
 TO BE A SUPPLY FAN FOR STAIR PRESSURIZATION. IF THIS IS
 THE CASE, THIS FAN IS SHOWN TO BE WITHIN THE BUILDING.
 THIS FAN IS REQUIRED TO BRING ALL AIR DIRECTLY FROM THE
 OUTDOORS AND BE SEPARATED FROM THE REST OF THE BUILDING
 BY MIN. 2 HOUR FIRE RESISTANCE RATED CONSTRUCTION IN
 ACCORDANCE WITH FBCM 401.4. THE LOCATION OF THE INTAKE
 FOR THIS SYSTEM IS ALSO SUBJECT TO THE REQUIREMENTS OF
 FBCM 401.5.1.
  
 35. M5: THE DUCT SYSTEM FOR FCU 5-19 IN ROOM 508 IS
 MISSING SIZE AND CFM DESIGNATION. PLEASE PROVIDE THE
 MISSING INFORMATION IN ACCORDANCE WITH FBCM 603.1 AND
 FBCB 106.1.1.
  
 36. M5: ON FLOOR PLAN, EF 5-4 AND EF 5-6 ARE BOTH SHOWN
 IN MENS ROOM 527. ALSO, EF 5-4 IS SHOWN IN ROOMS 527
 AND 528. PLEASE CLARIFY THE LOCATION OF THIS EQUIPMENT
 IN ACCORDANCE WITH FBCM 50101 AND FBCB 106.1.1.
  
 37. M5: NOTE #5 ON PLANS CALLS FOR A MAKEUP AIR SUPPLY
 FAN FOR THE DRYERS IN THE LAUNDRY ROOM. NO SUCH SUPPLY
 FAN IS SHOWN ON THE FLOOR PLAN OR THE EQUIPMENT
 SCHEDULE. PLEASE CLARIFY IN ACCORDANCE WITH FBCM 504.5
 AND FBCB 106.1.1. IF THERE IS TO BE SUCH A FAN, NOTE #5
 CALLS FOR A SUPPLY FAN IN EXCESS OF 2000 CFM. A SMOKE
 DETECTOR MAY BE REQUIRED AT THIS LOCATION IN ACCORDANCE
 WITH FBCM 606.2.1.
  
 38. M5: NOTE #5 PART 3 CALLS FOR AN EXHAUST FAN WITH
 BAROMETRIC DAMPER TO BE INSTALLED IN THE LAUNDRY ROOM.
 NO SUCH FAN IS SHOWN ON PLANS OR THE EQUIPMENT
 SCHEDULE. PLEASE CLARIFY IN ACCORDANCE WITH FBCM 501.1
 AND FBCB 106.1.1.
  
 39. M5: FLOOR PLAN SHOWS 3 FAN-COIL UNITS IN THE
 LAUNDRY ROOM CEILING. THESE UNITS HAVE NO TAG OR
 DESIGNATION. PLEASE IDENTIFY THESE UNITS AND COORDINATE
 WITH THE EQUIPMENT SCHEDULE ON M12 AND THE PIPING
 SCHEDULE ON M13.
  
 40. M5: THE FLOOR PLAN SHOWS A FRESH AIR SUPPLY FLEX
 DUCT ROUTED TO CLOSET 516 WITH NO SIZE, GRILL OR CFM
 DESIGNATION. PLEASE PROVIDE MISSING INFORMATION IN
 ACCORDANCE WITH FBCM 603.1 AND FBCM 106.1.1.
  
 41. M5: THE FLOOR PLAN SHOWS A D2 DAMPER AT ONE OF THE
 EXHAUST DUCT PENETRATIONS OF THE SHAFT. WHAT IS THE
 PURPOSE OF THIS DAMPER? THE LOCATION AND POSSIBLE
 FUNCTION DO NOT CORRESPOND WITH THE DAMPER SCHEDULE
 SHOWN ON PAGE M9. PLEASE CLARIFY OR CORRECT PER FBCM
 513.1 AND FBCB 106.1.1.
  
 42. M5 THROUGH M7: THERE ARE MULTIPLE DUCT PENETRATIONS
 OF RATED SHAFT ENCLOSURES SHOWN ON FLOOR PLANS. DUCT
 PENETRATIONS OF SHAFT ENCLOSURES SHALL BE PROTECTED
 WITH FIRE AND SMOKE DAMPERS IN ACCORDANCE WITH FBCM
 607.5.5.1.
  
 43. M5 THROUGH M7: A NOTE ON THE FLOOR PLAN POINTS TO
 WHAT APPEARS TO BE AN EXHAUST RISER AND IDENTIFIES IT
 AS A FRESH AIR RISER. PLEASE CLARIFY IN ACCORDANCE WITH
 FBCM 603.1.
  
 44. M5 THROUGH M7: THERE ARE MULTIPLE DUCT PENETRATIONS
 ON SUPPLY AND EXHAUST AIR SYSTEMS PENETRATING THE RATED
 CORRIDOR WALLS. NOTE #1 ON FLOOR PLAN CLAIMS AN
 EXCEPTION FOR FIRE DAMPERS AS ALLOWED UNDER FBCM
 607.5.3(2). HOWEVER, THESE DUCT PENETRATIONS DO NOT
 QUALIFY FOR THIS EXCEPTION BECAUSE THEY DO NOT MEET ALL
 6 PARTS OF EXCEPTION #2. THESE DUCTS HAVE OPENINGS
 WHICH COMMUNICATE WITH THE CORRIDOR AND THEREFORE FIRE
 DAMPERS ARE REQUIRED. ALSO, MANY OF THESE DUCT
 PENETRATIONS AS SHOWN ON PLAN ARE FLEX DUCT. FLEXIBLE
 DUCTS AND AIR CONNECTORS SHALL NOT PASS THROUGH ANY
 FIRE-RESISTANCE-RATED ASSEMBLY IN ACCORDANCE WITH FBCM
 607.7.
 IN ADDITION, DUCT PENETRATIONS OF FIRE RESISTANCE RATED
 CORRIDOR WALLS SHALL BE PROTECTED WITH SMOKE DAMPERS IN
 ACCORDANCE WITH FBCM 607.5.4.
 NOTE: DUCTS AND AIR TRANSFER OPENINGS THAT PENETRATE
 FIRE-RESISTANCE-RATED ASSEMBLIES AND ARE NOT REQUIRED
 TO HAVE DAMPERS BY FBCM 607 SHALL COMPLY WITH THE
 REQUIREMENTS OF SECTION 712 OF THE FLORIDA BUILDING
 CODE, BUILDING. PROVIDE A THROUGH-PENETRATION FIRESTOP
 SYSTEM DETAIL FOR DUCT PENETRATIONS WHICH WILL NOT BE
 PROTECTED BY FIRE DAMPERS.
  
 45. M5 THROUGH M7: MANY FLEX DUCTS FOR O.A. INTO GUEST
 ROOMS AND FCU SUPPLY DIFFUSERS ARE MISSING SIZES AND
 SOME ARE MISSING CFM AND GRILL DESIGNATIONS. PLEASE
 PROVIDE ALL MISSING INFORMATION ON AIR DISTRIBUTION
 SYSTEM COMPONENTS IN ACCORDANCE WITH FBCM 603.1.
  
 46. M5 THROUGH M7: THE SEQUENCE OF OPERATIONS FOR THE
 SMOKE CONTROL SYSTEM IN THESE AREAS IN UNCLEAR. WHAT IS
 THE LOCATION OF SMOKE BARRIERS? WHAT ROLE (IF ANY) DO
 THE EXHAUST RISERS PLAY IN THE SMOKE CONTROL SYSTEM?
 WHY ARE THE SUPPLY FANS AT THE ENDS OF THE CORRIDORS
 MARKED AS EXHAUST FANS (EF)? PLEASE PROVIDE A COMPLETE
 RATIONAL ANALYSIS FOR THE BUILDING SMOKE CONTROL SYSTEM
 WITH A DETAILED SEQUENCE OF OPERATION. THE ANALYSIS
 SHALL INCLUDE ALL PERMUTATIONS OF SYSTEMS? STATUS IN
 ACCORDANCE WITH FBCM 513.4 THROUGH 513.4.6. SEE
 FOLLOWING COMMENT FOR ADDITIONAL INFORMATION.
 NOTE: A COMPLETE REVIEW OF THE BUILDING SMOKE CONTROL
 SYSTEM IS NOT POSSIBLE AT THIS TIME. ADDITIONAL
 COMMENTS RELATED TO THIS SYSTEM IN A FUTURE REVIEW ARE
 LIKELY.
  
 47. SMOKE CONTROL: EQUIPMENT SUCH AS, BUT NOT LIMITED
 TO, FANS, DUCTS, AUTOMATIC DAMPERS AND BALANCE DAMPERS
 SHALL BE SUITABLE FOR THEIR INTENDED USE, SUITABLE FOR
 THE PROBABLE EXPOSURE TEMPERATURES THAT THE RATIONAL
 ANALYSIS INDICATES, AND AS APPROVED BY THE CODE
 OFFICIAL IN ACCORDANCE WITH FBCM 513.10. FLEXIBLE AND
 RIGID FIBERGLASS DUCTS WILL NOT BE ACCEPTED AS PART OF
 THE SMOKE CONTROL SYSTEM. IN ADDITION TO OTHER
 REQUIREMENTS, BELT-DRIVEN FANS SHALL HAVE 1.5 TIMES THE
 NUMBER OF BELTS REQUIRED FOR THE DESIGN DUTY WITH THE
 MINIMUM NUMBER OF BELTS BEING TWO. FANS SHALL BE
 SELECTED FOR STABLE PERFORMANCE BASED ON NORMAL
 TEMPERATURE AND, WHERE APPLICABLE, ELEVATED TEMPERATURE
 IN ACCORDANCE WITH FBCM 513.10.5. PROVIDE DOCUMENTATION
 SHOWING ALL COMPONENTS OF THE SMOKE CONTROL SYSTEM ARE
 SUITABLE FOR THEIR INTENDED USE IN ACCORDANCE WITH
 THESE SECTIONS.
  
 48. M5: NOTE #6 ON THIS PAGE CALLS FOR A PRESSURE
 SENSOR TO ENSURE ELEVATOR SHAFT IS EQUALLY PRESSURIZED
 WITH CORRIDOR. NO INFORMATION COULD BE FOUND ON PLANS
 OR EQUIPMENT SHOWN ON THE PLANS FOR ELEVATOR SHAFT
 PRESSURIZATION. HOW IS THIS TO BE ACCOMPLISHED? IS THIS
 TO BE INTEGRATED WITH THE SMOKE CONTROL SYSTEM? IS THIS
 CONDITION WITH THE PRESSURE SENSOR TO BE ONLY ON THIS
 FLOOR OR ON ALL GUEST ROOM FLOORS? IF IT IS ONLY ON
 THIS FLOOR IT DOES NOT APPEAR POSSIBLE TO SERVE ITS
 STATED PURPOSE. PLEASE CLARIFY AND INCLUDE THIS
 CONDITION IN THE RATIONAL ANALYSIS FOR THE SMOKE
 CONTROL SYSTEM IN ACCORDANCE WITH FBCM 513.1.
  
  
 49. M5 THROUGH M7: IN THE GUEST ROOMS, SOME BATHROOM
 EXHAUST LOCATIONS ARE MARKED WITH AN EF DESIGNATION
 WHILE OTHERS ARE NOT, BUT ALL ARE CONNECTED TO THE SAME
 COMMON DUCTS. ARE THERE EXHAUST FANS AT THE LOCATIONS
 WITH THE EF DESIGNATION? PLEASE CLARIFY IN ACCORDANCE
 WITH FBCM 501.1 AND FBCB 106.1.1.
  
 50. M5 THROUGH M7: IT IS NOT CLEAR HOW RETURN AIR WILL
 GET BACK TO FAN-COIL UNITS IN THE GUEST ROOMS. PLEASE
 CLARIFY BY PROVIDING THE SIZE AND LOCATION OF RETURN
 AIR OPENINGS, TRANSFER AIR OPENINGS AND THE LOCATION OF
 RETURN AIR PLENUM CEILINGS IN THE ROOMS. SHOW
 COMPLIANCE WITH FBCM 601.4 AND 603.8.
  
 51. M5 THROUGH M7: FLOOR PLAN SHOWS A DESIGNATION FOR
 AN FCU IN THE ELEVATOR LOBBIES BUT NO FCU IS SHOWN AT
 THIS LOCATION. PLEASE CLARIFY, COORDINATE WITH
 EQUIPMENT SCHEDULE ON M12 AND PIPING SCHEDULE ON M13 IN
 ACCORDANCE WITH FBCM 603.1 AND FBCB 106.1.1.
  
 52. M6: THE FCU IN ROOM 622 APPEARS TO HAVE 3 SUPPLY
 OUTLETS MISTAKENLY DRAWN IN WHERE ONLY 2 SHOULD BE. IS
 THIS THE CORRECT DESIGN? PLEASE CLARIFY PER FBCM 603.1.
  
 53. M7: THIS PLAN SHOWS EF 6-2 OUT IN SPACE SOMEWHERE
 AWAY FROM THE BUILDING. PLEASE CORRECT OR CLARIFY THE
 INTENT OF THIS FAN AT THIS LOCATION.
  
 54. M8: THE STAIR PRESSURIZATION FANS ON THE ROOF HAVE
 NO EQUIPMENT DESIGNATION ON THE PLANS. PLEASE IDENTIFY
 THESE FANS ON THE FLOOR PLAN TO COORDINATE WITH THE
 EQUIPMENT SCHEDULE ON M12. ALSO, THESE FANS APPEAR TO
 EXCEED 2000 CFM AND THEREFORE DUCT SMOKE DETECTORS ARE
 REQUIRED IN ACCORDANCE WITH FBCM 606.2.1.
  
 55. M8: ARE THE OARTUS ON THE ROOF ATTACHED TO OR
 PROVIDED WITH ERVS? WHILE IT IS UNCLEAR IF THE EXHAUST
 SYSTEMS LOCATED IN GUEST ROOM CORRIDORS ARE AN INTEGRAL
 PART OF THE BUILDING SMOKE CONTROL SYSTEM, PLEASE TAKE
 NOTE THAT ERVS MAY NOT BE USED AS PART OF A SMOKE
 CONTROL SYSTEM IN ACCORDANCE WITH FBCM 514.2(3)
  
 56. M8: DO ELEVATOR SHAFTS HAVE ANY TYPE OF VENTING?
 HOISTWAYS OF ELEVATORS PENETRATING MORE THAN THREE
 STORIES SHALL BE PROVIDED WITH A MEANS FOR VENTING
 SMOKE AND HOT GASES TO THE OUTER AIR IN CASE OF FIRE IN
 ACCORDANCE WITH FBCB 3004.1. VENTS SHALL BE LOCATED IN
 ACCORDANCE WITH FBCB 3004.2 AND SIZED IN ACCORDANCE
 WITH FBCB 3004.3. ALSO, ELEVATOR SHAFT VENTS SHALL BE
 EQUIPPED WITH MOTORIZED DAMPERS THAT ARE CAPABLE OF
 BEING AUTOMATICALLY CLOSED DURING NORMAL BUILDING
 OPERATION AND ARE INTERLOCKED TO OPEN AS REQUIRED BY
 FIRE AND SMOKE DETECTION SYSTEMS IN ACCORDANCE WITH
 FBCB 13-409.1.ABC.3.1.
  
 57. ELEVATORS: WHERE STANDBY POWER IS CONNECTED TO
 ELEVATORS, THE MACHINE ROOM VENTILATION OR AIR
 CONDITIONING SHALL BE CONNECTED TO THE STANDBY POWER
 SOURCE IN ACCORDANCE WITH FBCB 3003.1.4.
  
 58. M9: THE FRESH AIR AND SMOKE EVAC RISER CALLS FOR
 EXHAUST SYSTEM TO BE USED ON AFFECTED FLOOR BUT THE
 EXHAUST SYSTEM TO BE USED AND ANY CONTROLS OR
 ASSOCIATED DAMPERS ARE NOT IDENTIFIED ON PLANS. PLEASE
 COORDINATE THIS RISER DIAGRAM WITH THE RATIONAL
 ANALYSIS AND THE COMPLETE SEQUENCE OF OPERATIONS TO BE
 PROVIDED IN ACCORDANCE WITH FBCM 513.1. SEE ALSO
 COMMENTS 46 AND 47 ABOVE.
  
 59. M9: THE DAMPER CONTROL SEQUENCE SHOWS A D5 DAMPER
 BUT NO SUCH DAMPER IS SHOWN ON FLOOR PLANS OR RISER
 DIAGRAMS. PLEASE CLARIFY AND COORDINATE ALL SMOKE
 CONTROL COMPONENTS AS REQUESTED IN PREVIOUS COMMENTS.
  
 60. M9: THE STAIR PRESSURIZATION RISER SHOWS EACH DUCT
 PENETRATION OF THE STAIR SHAFT PROTECTED WITH FIRE
 DAMPERS EXCEPT FOR THE ONE ON THE 5TH FLOOR. WHY IS
 THIS FLOOR DIFFERENT FROM THE OTHERS? PLEASE SHOW HOW
 THIS PENETRATION IS TO BE PROTECTED IN ACCORDANCE WITH
 FBCM 607.5.
  
 61. M10 AND M11: THERE ARE MULTIPLE APPLIANCES AND
 PIECES OF EQUIPMENT SHOWN ON THESE PLANS WHICH WILL BE
 EXPOSED TO WIND. MECHANICAL EQUIPMENT, APPLIANCES AND
 SUPPORTS THAT ARE EXPOSED TO WIND SHALL BE DESIGNED AND
 INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT
 AND THE SUPPORTS AS DETERMINED IN ACCORDANCE WITH FBCM
 301.13. PLEASE PROVIDE COMPLETE DOCUMENTATION SHOWING
 HOW EACH APPLIANCE EXPOSED TO WIND IS TO BE SECURED TO
 THE STRUCTURE FOR WIND RESISTANCE. THIS INCLUDES ALL
 RTUS, CONDENSING UNITS AND FANS. IN ADDITION TO THE
 ATTACHMENT REQUIREMENTS, PLEASE PROVIDE MANUFACTURER?S
 DOCUMENTATION SHOWING EACH APPLIANCE WHICH IS EXPOSED
 TO WIND THAT IS IT DESIGNED TO RESIST ANTICIPATED WIND
 PRESSURES IN ACCORDANCE WITH THIS SECTION.
  
 62. M10 AND M11: AHU DETAIL SHOWS A SECONDARY DRAIN
 OUTLET FROM THE AUXILIARY DRAIN PAN. HOW WILL THIS
 SERVE AS AUXILIARY DRAIN PROTECTION? SHOW COMPLIANCE
 WITH ONE OF THE ALLOWED METHODS LISTED UNDER FBCM
 307.2.3. ALSO, THIS DETAIL APPEARS SPECIFIC TO AHUS.
 WILL THERE BE A SEPARATE HANGING DETAIL FOR FAN-COILS
 OR IS THIS DETAIL APPLICABLE TO BOTH? PLEASE SHOW HOW
 ALL CONDENSATE DRAINS ARE TO BE TRAPPED IN ACCORDANCE
 WITH FBCM 307.2.4.
 NOTE: PLUMBING PLANS SHOW CONDENSATE RISERS TERMINATING
 IN THE PARKING GARAGE, PLEASE INDICATE HOW GASSES FROM
 THE GARAGE WILL BE PREVENTED FROM MIGRATING TO OCCUPIED
 AREAS VIA THE CONDENSATE DRAIN PIPING.
  
 63. M11: THE DETAIL FOR THE ROOFTOP STAND SHOWS A
 HEIGHT OF 18 INCHES FROM THE BASE OF THE LEG. THIS
 HEIGHT MAY NOT BE SUFFICIENT AS CLEARANCE ABOVE THE
 ROOFING MATERIAL SHALL BE IN ACCORDANCE WITH FBCB TABLE
 1509.7.
  
 64. M12: THE EF SCHEDULE HAS SEVERAL NOTES AT THE
 BOTTOM. ALL OF THESE NOTES DO NOT APPEAR TO BE
 APPLICABLE TO ALL FANS. PLEASE PROVIDE A MEANS WITHIN
 THE SCHEDULE TO DETERMINE WHICH NOTES APPLY TO WHICH
 FANS IN ACCORDANCE WITH FBCM 501.1 AND FBCB 106.1.1.
  
 65. M12: THE STAIR PRESSURIZATION CALCS LIST A STAIR 3
 BUT NO SUCH PRESSURIZED STAIR COULD BE LOCATED ON PANS.
 STAIR 3 IS SHOWN AS AN OPEN STAIR BETWEEN FIRST AND
 SECOND FLOORS. PLEASE CLARIFY IN ACCORDANCE WITH FBCB
 909.20.4.
  
 66. M12: THROUGHOUT THE PLANS AND THE EQUIPMENT
 SCHEDULES THERE ARE DISCREPANCIES. EXAMPLE: THE STAIR
 PRESSURIZATION FANS ON THE SCHEDULE CALL FOR 12,500 CFM
 EACH BUT ON THE RISER DIAGRAM THEY CALL FOR 10,000 CFM
 EACH. EXAMPLE: THE FRESH AIR RTU ON THE ROOF CALLS FOR
 8,600 CFM BUT IT CALLS FOR 86,000 CFM ON THE EQUIPMENT
 SCHEDULE. EF 2-2 IS MISSING FROM THE EF SCHEDULE. MANY
 PREVIOUS COMMENTS ALSO DEALT WITH DISCREPANCIES WITH
 EQUIPMENT SCHEDULE.
 NOTE: THESE ARE JUST SOME EXAMPLES AND ARE NOT INTENDED
 TO SERVE AS AN EXHAUSTIVE LIST. PLEASE COORDINATE ALL
 FLOOR PLANS WITH EQUIPMENT SCHEDULES TO PROVIDE CLEAR
 DIRECTION AS TO THE DESIGN INTENT AND LOCATION AND
 RATING OF ALL APPLIANCES.
  
 67. M13: THE PIPING DIAGRAMS ARE OF POOR QUALITY AND
 SOME ARE ILLEGIBLE. PLEASE PROVIDE THIS INFORMATION IN
 A CLEAR AND LEGIBLE FORMAT IN ACCORDANCE WITH FBCB
 106.1.1. THESE DIAGRAMS CAN NOT BE THOROUGHLY REVIEWED
 AT THIS TIME. HOWEVER, MANY DISCREPANCIES BETWEEN
 PIPING DIAGRAMS AND FLOOR PLANS AS FAR AS FCU
 DESIGNATIONS ARE EVIDENT. PLEASE CORRECT ANY
 DISCREPANCIES AND COORDINATE PLANS AS REQUESTED IN
 PREVIOUS COMMENTS.
  
 68. KITCHEN HOOD PLANS: THERE APPEAR TO BE OVERLAPPING
 LAYERS ON THESE PLANS. ALSO, SOME PARTS OF THE PLAN DID
 NOT FIT ON THE PAGE AND WERE CUT OFF. ALSO, SOME PARTS
 ARE WITHIN THE BINDER FOR THE ROLL OF PLANS AND CAN NOT
 BE VIEWED. PLEASE PROVIDE CLEAR AND LEGIBLE PLANS FOR A
 THOROUGH REVIEW IN ACCORDANCE WITH FBCB 106.1.1.
  
 69. KITCHEN HOOD PLANS: THE SCHEDULE CALLS FOR 12X12
 GREASE EXHAUST DUCT. FLOOR PLANS ON M1 CALL FOR 10X10
 DUCT. IF THE DUCT IS 10X10 AT A QUANTITY OF 1800 CFM
 THE VELOCITY WILL EXCEED THE MAXIMUM ALLOWED VELOCITY
 OF 2500 FPM. GREASE DUCT SYSTEMS SERVING A TYPE I HOOD
 SHALL BE DESIGNED AND INSTALLED SO AS TO PROVIDE AN AIR
 VELOCITY WITHIN THE DUCT SYSTEM OF NOT LESS THAN 1,500
 FEET PER MINUTE AND NOT GREATER THAN 2,500 FEET PER
 MINUTE IN ACCORDANCE WITH FBCM 506.3.4.
  
 70. KITCHEN HOOD PLANS: THE EF SCHEDULE CALLS FOR 850
 CFM WHILE THE HOOD SCHEDULE CALLS FOR 1800 CFM. WHICH
 IS CORRECT? PLEASE PROVIDE A CONSISTENT DESIGN TO
 FACILITATE A THOROUGH REVIEW OF THE KITCHEN GREASE
 EXHAUST SYSTEM PER FBCM 506.1.
  
 71. KITCHEN HOOD PLANS: THE HOOD SCHEDULE SHOWS A 105
 INCH LONG HOOD WITH TWO SUPPLY COLLARS WHILE THE PLAN
 VIEW OF THE HOOD SHOWS A 48 INCH WIDE HOOD WITH ONE
 COLLAR. WHICH IS CORRECT? PLEASE PROVIDE A CONSISTENT
 DESIGN TO FACILITATE A THOROUGH REVIEW OF THE KITCHEN
 GREASE EXHAUST SYSTEM PER FBCM 506.1.
  
 72. PROVIDE ENERGY CALCULATIONS FOR PLAN REVIEW.
 HEATING, VENTILATING AND AIR-CONDITIONING SYSTEMS OF
 ALL STRUCTURES SHALL BE DESIGNED AND INSTALLED FOR
 EFFICIENT UTILIZATION OF ENERGY IN ACCORDANCE WITH
 CHAPTER 13 OF THE FLORIDA BUILDING CODE, BUILDING PER
 FBCM 301.2.
  
 73. PROVIDE COOLING LOAD CALCS FOR ALL SYSTEMS WHICH
 PROVIDE COOLING FOR HUMAN COMFORT IN ACCORDANCE WITH
 FBCB 13-407.1.ABC.1.
  
 74. PROVIDE OUTSIDE AIR CALCULATIONS SHOWING OCCUPANCY
 CLASSIFICATIONS, OCCUPANT LOADS, VENTILATION RATES
 REQUIRED AND VENTILATION PROVIDED FOR ALL HABITABLE
 SPACES IN ACCORDANCE WITH FBCM 403.
  
 PLEASE RESPOND TO EACH COMMENT IN WRITING, WITH A
 DESCRIPTION OF HOW EACH COMMENT HAS BEEN ADDRESSED AND
 WHERE THE REQUIRED INFORMATION CAN BE FOUND. PLEASE
 RETURN ONE SET OF OLD OR VOIDED PLANS FROM THIS REVIEW
 FOR REFERENCE.
  
 NOTE: THERE WAS MUCH INFORMATION NOT PROVIDED FOR THIS
 REVIEW. EVERY EFFORT WAS MADE TO PERFORM A THOROUGH
 REVIEW DURING THIS CYCLE TO PREVENT NEW COMMENTS DURING
 A SUBSEQUENT CYCLE. HOWEVER, ONCE ALL REQUESTED
 INFORMATION IS PROVIDED NEW COMMENTS ARE POSSIBLE DUE
 TO INFORMATION BEING REVIEWED FOR THE FIRST TIME OR DUE
 TO ANY DESIGN CHANGES MADE SUBSEQUENT TO THIS REVIEW.
  
 NOTE: THIS PROJECT HAS BEEN SUBMITTED FOR PLAN REVIEW
 ONLY AND NOT FOR PERMIT. IF THE PERMIT APPLICATION IS
 SUBMITTED BY THE CONTRACTOR ON OR AFTER MARCH 1, 2009,
 THESE PLANS SHALL BE SUBJECT TO RE-REVIEW FOR
 COMPLAINCE WITH THE NEW 2007 FLORIDA BUILDING CODE.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719
 [email protected]
2008-12-29 09:55:42TO "COMM" BD#4/PLANS ON RACK/3 ROLLS


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved