| Date |
Text |
| 2008-12-26 11:28:23 | ZONING REVIEW: FAILED |
| | |
| | 1) MATERIAL AND COLOR SELECTIONS TO BE CONFIRMED BY |
| | J.GOLDBERG. PLANS INDICATED EXPOSED CMU WHICH WAS |
| | DISCUSSED TO BE STUCCO-COVERED. |
| | 2) CONFIRM LOCATIONS OF ALL BACKFLOW PREVENTERS, FIRE |
| | CONNECTIONS SO THEY MAY BE LOCATED AWAY FROM |
| | CIRCULATION OR PRIMARY BUILDING ELEVATIONS (SOUTH |
| | ELEV). |
| | 3) ON LP-1, CONFIRM ALL PLANTS LISTED ARE TO BE USED. |
| | COULD NOT FIND SOT ON PLAN. IS THIS SUPPOSED TO BE SPT? |
| | 4) ON IR-1, CONFIRM IRRIGATION LINES WILL BE INSTALLED. |
| | IT IS NOT CLEAR FROM THIS DRAWING OR THE NOTES WHAT |
| | WILL HAPPEN WITH PRELIM PHASES (LINES SHOULD BE IN |
| | PLACE FOR PLANTERS). |
| | 5) A 1/A-1.0 - ACCESS RAMP SECTION. CABLE RAILING IS |
| | INDICATED ON SOUTHERN SIDE OF RAMP UP. DO WE NEED THIS |
| | AT ALL? PLANTER PROVIDES BARRIER AND HANDRAIL IS |
| | PROVIDED ON NORTH SIDE, SO CABLING SHOULD NOT BE |
| | NECESSARY. CAN WE ELIMINATE THE CABLING AND HANDRAIL? |
| | IF NOT, JUST INSTALL HANDRAIL. |
| | 6) A-1.1 - DURING TEMPORARY ACCESS PHASE, IT DOES NOT |
| | APPEAR THAT THERE WILL BE ENOUGH WHEELCHAIR MANEUVERING |
| | CLEARANCE WHEN BATHROOM DOORS ARE OPEN. ACCESS AREA IS |
| | OVER 5' WIDE, DOORS WILL BLOCK WHEN OPEN. PLEASE |
| | CONFIRM THIS MEETS ADA REQUIREMENTS. |
| | 7) ON A-1.1, SCHEMATIC DRAWINGS SHOWED BATHROOM |
| | ENTRANCES RECESSED SO THAT THEY WOULD NOT BE DIRECTLY |
| | VIEWED FROM EXTERIOR. PLANS SHOW DOORS OPENING DIRECTLY |
| | TO THE OUTSIDE. CAN THE PLANS BE REVISED TO SHOW |
| | ORIGINAL SCHEMATIC DESIGN, WITH SOME MODIFICATION? THIS |
| | CREATES A BETTER SOUTH BUILDING ELEVATION. |
| | 8) ON CABLE RAIL DETAILS, RAIL SYSTEM SHOULD NEVER |
| | TERMINATE INTO BUILDING ELEVATION. IT SHOULD ALWAYS |
| | TERMINATE INTO VERTICAL STEEL SUPPORT WITH TIE-OFF. |
| | DETAILS SEEM TO SHOW THIS, BUT JUST CONFIRM. |
| | 9) A-5.0 - ALUM DOWNSPOUT INDICATED WITH HORIZONTAL |
| | STRUTS CONNECTING TO MAIN BUILDING. WHAT IS THE DETAIL |
| | FOR THE CONNECTION TO THE BUILDING? CONFIRM STRUTS |
| | ALIGN WITH STRUCTURAL GRID. |
| | 10) NOTE FOR ALL PLANTERS THAT ALL CONSTRUCTION DEBRIS |
| | SHALL BE REMOVED PRIOR TO FILLING WITH SOIL. |
| | 11) S-1 -CONNECTION FROM DOWNSPOUT TO BUILDING NOT |
| | SHOW. (SEE NOTE #7). |
| | 12) S-1A - FOUNDATION NOTES ARE INCOMPLETE: ELEVATION |
| | 100'-0" IS X.XX NGVD. WHAT IS X.XX? |
| | 13) TREE ALTERATION PERMIT WILL BE REQUIRED FOR THE |
| | ENTIRE CITY COMMONS SITE. PLANNING STAFF WILL |
| | COORDINATE WITH THE LANDSCAPE ARCHITECT. CONTACT ROBERT |
| | KUSSNER, LANDSCAPE PLANNER, AT 822-1435. |
| | 14) ON SP-1, AT THE NORTHWEST CORNER OF THE VISITOR |
| | CENTER, WHAT IS THE TRANSITION FROM THE LANDSCAPED AREA |
| | TO THE EXISTING PAVERS? THERE DOES NOT APPEAR TO BE ANY |
| | HEADER CURB OR OTHER EDGE. ALSO, THE SHAPE OF THIS |
| | LANDSCAPE AREA CHANGES BETWEEN THE DIFFERENT PLANS. |
| | CONFIRM THE ACTUAL LIMITS. |
| | 15) OTHER LANDCAPE COMMENTS WILL BE PROVIDED THROUGH |
| | SEPARATE LANDSCAPE REVIEWER. |
| | |
| | MATT FLIS - 822-1445 |