| Date |
Text |
| 2009-01-22 10:21:36 | DENIED |
| | REFERENCE: |
| | FBC-2004 PLUMBING |
| | FBC-2004 BUILDING |
| | FBC-2004 CHAPTER 1 |
| | FBC-2004 CHAPTER 11 |
| | NFPA-99C |
| | |
| | 1. SHT A-108 FINISH SCHEDULE INDICATES PAINTED WALLS |
| | FOR THE TOILET ROOM A-105. PER SECTION 1210.2 WALLS |
| | WITHIN 2 FEET OF THE WATER CLOSET SHALL HAVE A SMOOTH, |
| | HARD, NONABSORBENT SURFACE TO A HEIGHT OF 4 FEET ABOVE |
| | THE FLOOR. PAINTED SURFACES DOES NOT MEET THE HARD |
| | REQUIREMENT OF THIS CODE SECTION. PLEASE INDICATE |
| | METHOD OF COMPLIANCE. |
| | |
| | 2. SHT A-108 SHOW COMPLIANCE WITH THE FOLLOWING: |
| | ___LAV: |
| | A. 11-4.19.2 CLEARANCE HEIGHT |
| | B. 11-4.19.5 FAUCETS |
| | |
| | 3. SHT P-1 PLAN KEY NOTES NUMBER 3 & NUMBER 4 INDICATES |
| | EXISTING 4" SANITARY LINE AND NUMBER 5 INDICATES 3/4" |
| | WATER LINE CONNECTING TO EXISTING. PLEASE CLARIFY AS |
| | THIS IS A NEW BUILDING. SECTIONS 106.1.1, 106.1 & |
| | 107.1. |
| | |
| | 4. SHOW THE LOCATION & INDICATE THE SIZE OF THE WATER |
| | SERVICE AND SHOW THE REQUIRED RPZV BACKFLOW AT THE |
| | METER. SECTIONS 603.1 & 608.13.2. |
| | |
| | 5. SHT P-1 PLAN KEY NOTES NUMBER 8 IS NOT APPROVED. |
| | LIQUIDS FROM A LEVEL 3 VACUUM SYSTEM, PER 4-5.2.2, |
| | SHALL BE DIRECTLY CONNECTED TO THE SANITARY DRAINAGE |
| | SYSTEM THROUGH AN APPROPRIATELY TRAPPED AND VENTED |
| | DRAIN. SECTION 405.2.1.3. |
| | |
| | 6. ALL CENTRAL VACUUM (FLUID SUCTION) SYSTEMS. THE |
| | EXHAUSTS FROM A VACUUM PUMP SERVICE A VACUUM (FLUID |
| | SUCTION) SYSTEM SHALL DISCHARGE SEPARATELY TO OPEN AIR |
| | ABOVE THE ROOF. SECTION 713.6. |
| | |
| | 7. SHT P-2 THE SANITARY & DOMESTIC WATER RISER DIAGRAMS |
| | SHOW THE SYSTEMS CONNECTING TO EXISTING SYSTEMS. PLEASE |
| | CLARIFY AS THIS IS A NEW BUILDING. SECTIONS 106.1.1, |
| | 106.1 & 107.1. |
| | |
| | 8. SHT P-2 TANKLESS WATER HEATER DETAIL. FULL OPEN |
| | VALVES ARE REQUIRED ON THE WATER SUPPLY PIPE TO EVERY |
| | WATER HEATER. SECTION 606.1(7). PLEASE INDICATE VALVES |
| | ON DETAIL. |
| | |
| | 9. SHT P-2 DOMESTIC WATER RISER DIAGRAM SHOWS A 1/2" |
| | WATER SUPPLY LINE TO THE VACUUM SYSTEM. THE WATER LINE |
| | SHALL BE PROVIDED WITH PROTECTION AGAINST BACKFLOW & |
| | CONTAMINATION OF THE WATER SUPPLY SYSTEM. SECTION |
| | 608.3. PLEASE INDICATE METHOD. PLEASE SUBMIT MANUF. |
| | SPECIFICATIONS & INSTALLATION INSTRUCTIONS FOR THE |
| | VACUUM SYSTEM. SECTION 106.1.2 (MORE INFORMATION |
| | REQUIRED). |
| | |
| | 10. THE ENERGY CALCULATIONS DO NOT INDICATE WATER |
| | HEATER - 3 NOR DOES IT INCLUDING THE REQUIRED PIPING |
| | INSULATION. CHAPTER 13 ENERGY EFFICIENCY |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| | WITH A DESCRIPTION OF THE REVISION MADE, |
| | IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE |
| | ALL VOID SHEETS FROM ALL PLANS AND PLACE |
| | ONE SET OF THEM LOOSELY ON TOP OF THE |
| | COLLATED PLANS TO BE REVIEWED. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |