| Date |
Text |
| 2008-12-04 15:55:52 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | |
| | 1. SHTS 9 & 10 FLOOR PLAN AND SANITARY RISER DIAGRAM. |
| | EVERY DRY VENT, (RELIEF VENT FOR THE AAV), CONNECTING |
| | TO A HORIZONTAL DRAIN SHALL CONNECT ABOVE THE |
| | CENTERLINE OF THE HORIZONTAL DRAIN PIPE. SECTION 905.3. |
| | EVERY DRY VENT SHALL RISE VERTICALLY TO A MINIMUM OF 6 |
| | INCHES ABOVE THE FLOOD LEVEL RIM OF THE HIGHEST TRAP OR |
| | TRAPPED FIXTURE BEING VENTED. SECTION 905..4. -- THAT |
| | SAID, THE RELIEF VENT IS NOT REQUIRED FOR THE AAV PER |
| | SECTION 917.3.1. |
| | |
| | 2. SHT 10 WATER RISER DIAGRAM. THE WATER SUPPLY PIPES, |
| | (HOT & COLD), REQUIRE WATER HAMMER ARRESTORS. SECTION |
| | 604.9. PLEASE SHOW ON THE RISER DIAGRAM AND ON THE |
| | WASHING MACHINE PIPING DETAIL. |
| | |
| | 3. SHT 10 WATER HEATER DETAIL. THE P&T RELIEF VALVE |
| | DISCHARGE LINE SHALL HAVE NO TRAPPED SECTIONS AND SHALL |
| | HAVE A VISIBLE AIR GAP OR AIR GAP FITTING IN THE SAME |
| | ROOM AS THE WATER HEATER. SECTION 504.6.1. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| | WITH A DESCRIPTION OF THE REVISION MADE, |
| | IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE |
| | ALL VOID SHEETS FROM ALL PLANS AND PLACE |
| | ONE SET OF THEM LOOSELY ON TOP OF THE |
| | COLLATED PLANS TO BE REVIEWED. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | |