| Date |
Text |
| 2008-12-17 12:00:28 | ***** PASSED WITH PROVISOS ***** |
| | |
| | #1 PLANS DATED 11/20/08 REFLECT PIPING IN THE R.O.W., |
| | THIS IS UNACCEPTABLE! |
| | #2 SEE PLANS DATED 11/20/08, I HAVE APPROVED AS |
| | REDLINED. PRIVATE PIPING (ON-SITE PIPING MUST STAY |
| | ON-SITE OR HUG PROPERTY LINE |
| | UNTIL POINT OF CONTACT WITH SEWER LATERAL TIE-IN. ONE |
| | CLEAN-OUT IS REQUIRED. |
| | #3 (PLUMBING PLAN REVIEW HAS BEEN ADVISED OF THE |
| | APPROVAL) |
| | #4 CLEAN-OUT MUST HAVE A RING AND COVER AS PER CITY OF |
| | WPB APPROVED MATERIAL LIST |
| | HTTP://WWW.CITYOFWPB.ORG/ENGINEERING/UPLOADS/2008-10-24 |
| | -16-12-10-APPROVEDMATERIALSLIST10-24-08.PDF |
| | #5 RIGHT OF WAY PERMIT MUST BE UP TO DATE AND |
| | CONTRACTOR MUST CALL FOR INSPECTION PRIOR TO POURING |
| | CONCRETE. |
| | #6 PLUMBING INSPECTION OF PIPING AND ELEMENTS WITHIN |
| | PROXIMITY OF THE ROW MUST ALSO BE CALLED IN AND |
| | CLEARED. |
| | #7 SIDEWALK MUST MEET ADA ACCESABILITY STANDARDS AND |
| | SLOPE. |
| | |
| | MANUEL J GONZALEZ, PROJECT COORDINATOR |
| | LOCATION ADDRESS: |
| | CITY OF WEST PALM BEACH |
| | ENGINEERING SERVICES DEPARTMENT |
| | 1000 - 45TH STREET, SUITE 15 |
| | WEST PALM BEACH FL 33407 |
| | MAILING ADDRESS: |
| | CITY OF WEST PALM BEACH |
| | ENGINEERING SERVICES DEPARTMENT |
| | P.O. BOX 3506 |
| | WEST PALM BEACH FL 33401 |
| | TELEPHONE: |
| | 45TH STREET OFFICE : 561-494-1040 |
| | 45TH DIRECT: 561-494-1085 |
| | FAX: 561-494-1117 |
| | CITY HALL OFFICE: (561) 805-6723 |
| | CITY HALL DIRECT: (561) 805-6327 |
| | CITY HALL FAX: (561) 805-6731 OR 805-6676 |
| | NEXTEL: 561-644-7301 |
| | NEXTEL DIRECT CONNECT: 159*28165*38 |
| | EMERGENCIES: |
| | CENTRAL OPERATIONS CENTER (DISPATCH) 561-822-2210 |
| | E-MAIL: |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |