| Plan Review Notes For Permit 08110376 |
| Permit Number |
08110376 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2008-11-19 10:31:27 | 2004 FBC W/2007 REVISIONS | | | INSTALL ACCORDIONS AND STORM PANELS | | | | | | DENIED BY BUILDING | | | | | | 1) THE NOA # HAS BEEN CORRECTED ON THE ACCORDION | | | SCHEDULE. SEE RED-LINED CHANGES. | | | | | | 2) WALL MOUNTS A AND B ARE FOR POURED CONCRETE ONLY AND | | | THE SUBSTRATE WAS SPECIFIED IN THE SCHEDULE AS CONCRETE | | | BLOCK. PLEASE CORRECT. THE FASTENER SPACING TABLES IN | | | THE NOA SPECIFY IF THE MOUNT TYPES LISTED ARE FOR | | | POURED CONCRETE ONLY OR ARE FOR BOTH POURED CONCRETE | | | AND CONCRETE BLOCK. | | | | | | 3) THE ANCHOR SPACING SPECIFIED IN THE SCHEDULE FOR THE | | | WOOD WALL MOUNT P IS INCORRECT. SHOULD BE 4". PLEASE | | | CORRECT. | | | | | | 4) THE ANCHOR SPACING SPECIFIED IN THE SCHEDULE FOR THE | | | WALL MOUNT E IS INCORRECT. SHOULD BE 7.5". PLEASE | | | CORRECT. | | | | | | 5) THE MOUNT TYPES SPECIFIED IN THE SCHEDULE AS WALL | | | MOUNT B FOR THE BOTTOM IS INCORRECT. SEE THE | | | INSTALLATION DRAWINGS IN THE PRODUCT APPROVAL. THERE | | | ARE HEADER AND SILL INSTALLATIONS SHOWN. A AND B ARE | | | BOTH HEADER OR FOR THE TOP. THE SILL AND FLOOR | | | INSTALLATIONS ARE FOR THE BOTTOMS. PLEASE CORRECT | | | SCHEDULE AND SPECIFY THE CORRECT FASTENER SPACINGS. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|