| 2009-01-26 00:22:16 | REVIEW #:1ST **PLAN CHECK ONLY** |
| | ACTION: DENIED |
| | |
| | FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS |
| | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | THESE PLANS HAVE BEEN REVIEWED FOR CODE COMPLIANCE AND |
| | THE FOLLOWING DEFICIENCIES HAVE BEEN IDENTIFIED: |
| | |
| | 1. PG A101: GENERAL NOTE #8 CALLS FOR CO DETECTORS IN |
| | ALL AREAS WITH GAS POWERED EQUIPMENT. EVERY BUILDING |
| | FOR WHICH A BUILDING PERMIT IS ISSUED FOR NEW |
| | CONSTRUCTION ON OR AFTER JULY 1, 2008, AND HAVING A |
| | FOSSIL-FUEL-BURNING HEATER OR APPLIANCE, A FIREPLACE, |
| | OR AN ATTACHED GARAGE SHALL HAVE AN APPROVED |
| | OPERATIONAL CARBON MONOXIDE ALARM INSTALLED WITHIN 10 |
| | FEET OF EACH ROOM USED FOR SLEEPING PURPOSES IN |
| | ACCORDANCE WITH FS 553.885(1). |
| | |
| | 2. PG M101: THE VENTILATION SCHEDULE REFERENCES ASHRAE |
| | 62.1-2007. THE CORRECT REFERENCE STANDARD FOR THE |
| | FLORIDA BUILDING CODE IS ASHRAE 62.1-2004. PROVIDE THE |
| | CORRECT REFERENCE ON PLANS AND ENSURE CALCULATIONS ARE |
| | BASED ON THE CORRECT EDITION OF THIS STANDARD. |
| | |
| | 3. PG M101: VENTILATION SCHEDULE CALLS FOR A |
| | VENTILATION RATE OF 5 CFM/PERSON IN THE FITNESS ROOM. |
| | THE MINIMUM VENTILATION RATE REQUIRED IS 20 CFM/PERSON |
| | IN ACCORDANCE WITH ASHRAE 62.1-2004 TABLE 6-1. |
| | RECALCULATE THE REQUIRED VENTILATION FOR THIS SPACE |
| | BASED ON THE CORRECT PEOPLE OUTDOOR AIR RATE. |
| | |
| | 4. PG M102: THE 32 INCH ROUND DRYER EXHAUST DUCT IS |
| | SHOWN PENETRATING FIRE RATED WALL ASSEMBLIES. HOW WILL |
| | THESE PENETRATIONS BE PROTECTED? SHOW HOW THESE DUCT |
| | PENETRATIONS SHALL BE PROTECTED IN ACCORDANCE WITH FBCM |
| | 607.5 AND FBCM 504.2. |
| | |
| | 5. PG M102: THE FLOOR PLAN SHOWS THE DRYER EXHAUST |
| | DUCTS BEING MANIFOLDED PRIOR TO CONNECTION TO THE LINT |
| | COLLECTOR. THE MANUFACTURER???S INSTRUCTIONS FOR THE |
| | LINT COLLECTOR CALL FOR EACH DRYER TO BE DUCTED TO THE |
| | LINT COLLECTOR WITHOUT A COMMON DRYER DUCT MANIFOLD. |
| | SEE DRAWING 2008.20 OF MANUFACTURER???S INSTRUCTIONS. |
| | SHOW THESE DUCT INSTALLED PER MANUFACTURER???S |
| | INSTRUCTIONS IN ACCORDANCE WITH FBCM 304.1. |
| | |
| | 6. PG M102: EACH DRYER EXHAUST DUCT SHALL BE PROVIDED |
| | WITH BACKDRAFT DAMPER IN ACCORDANCE WITH FBCM 504.4. |
| | |
| | 7. PG M102: COMPRESSED AIR AND WATER CONNECTIONS ARE |
| | REQUIRED FOR THE LINT COLLECTOR. PROVISIONS FOR THESE |
| | CONNECTIONS COULD NOT BE FOUND ON MECHANICAL OR |
| | PLUMBING PLANS. SHOW HOW THESE REQUIREMENTS ARE TO BE |
| | MET IN ACCORDANCE WITH FBCM 304.1. |
| | |
| | 8. PG M102: ACCORDING TO DRYER SUBMITTAL, EACH OF THE |
| | FOUR DRYERS SHOWN ON PLANS WILL EXHAUST 1600 CFM. EACH |
| | DRYER IS REQUIRED TO HAVE 360 SQ.IN. OF FREE AREA TO |
| | THE OUTDOORS FOR MAKEUP AIR. NO SOURCE FOR MAKEUP AIR |
| | IS SHOWN ON PLANS. PROVIDE MAKEUP AIR PER INSTALLATION |
| | INSTRUCTIONS IN ACCORDANCE WITH FBCM 504.7. |
| | |
| | 9. PG M102: ELEVATOR MACHINE ROOM 024 DOES NOT SHOW ANY |
| | MEANS OF VENTILATION OR AIR CONDITIONING. ELEVATOR |
| | MACHINE ROOMS THAT CONTAIN SOLID-STATE EQUIPMENT FOR |
| | ELEVATOR OPERATION SHALL BE PROVIDED WITH AN |
| | INDEPENDENT VENTILATION OR AIR-CONDITIONING SYSTEM TO |
| | PROTECT AGAINST THE OVERHEATING OF THE ELECTRICAL |
| | EQUIPMENT. THE SYSTEM SHALL BE CAPABLE OF MAINTAINING |
| | TEMPERATURES WITHIN THE RANGE ESTABLISHED FOR THE |
| | ELEVATOR EQUIPMENT IN ACCORDANCE WITH FBCB 3006.2. |
| | |
| | 10. PG M102: FLOOR PLAN SHOWS HP-4 IN MECH ROOM 006 |
| | PROVIDING 1650 CFM OF SUPPLY. ACCORDING TO THE HEAT |
| | PUMP SCHEDULE ON M301, HP-4 WILL PROVIDE 1200 CFM OF |
| | SUPPLY. HOW WILL HP-4 PROVIDE THE QUANTITIES OF SUPPLY |
| | CALLED FOR ON THE FLOOR PLAN? AN AIR DISTRIBUTION |
| | SYSTEM SHALL BE DESIGNED AND INSTALLED TO SUPPLY THE |
| | REQUIRED DISTRIBUTION OF AIR IN ACCORDANCE WITH FBCM |
| | 603.1. |
| | |
| | 11. PG M102: FLOOR PLAN SHOWS HP-4 IN BREAK ROOM 017 |
| | PROVIDING 1000 CFM OF SUPPLY. ACCORDING TO THE HEAT |
| | PUMP SCHEDULE ON M301, HP-4 WILL PROVIDE 1200 CFM OF |
| | SUPPLY. HOW WILL HP-4 PROVIDE THE QUANTITIES OF SUPPLY |
| | CALLED FOR ON THE FLOOR PLAN? AN AIR DISTRIBUTION |
| | SYSTEM SHALL BE DESIGNED AND INSTALLED TO SUPPLY THE |
| | REQUIRED DISTRIBUTION OF AIR IN ACCORDANCE WITH FBCM |
| | 603.1. |
| | |
| | 12. PG M102: FLOOR PLAN SHOWS A 12X6 DUCT FROM HP-6 IN |
| | LAUNDRY ROOM PENETRATING A FIRE RESISTANCE RATED WALL |
| | ASSEMBLY WITH NO PROTECTION. SHOW HOW THIS DUCT |
| | PENETRATION IS TO BE PROTECTED IN ACCORDANCE WITH FBCM |
| | 607.5. |
| | NOTE: IF CLAIMING AN EXCEPTION TO THE REQUIREMENT FOR A |
| | FIRE DAMPER, SHOW COMPLIANCE WITH FBCM 607.1.1. |
| | |
| | 13. PG M102: FLOOR PLAN CALLS FOR THE OUTSIDE AIR DUCT |
| | SERVING HP-6 IN LAUNDRY ROOM TO BE BALANCED AT 125 CFM. |
| | THIS DOES NOT CORRESPOND WITH THE VENTILATION SCHEDULE |
| | ON M101 WHICH CALLS FOR THE LAUNDRY/LINEN AREAS TO BE |
| | PROVIDED WITH 140 CFM OF OUTSIDE AIR. ALSO TAKE INTO |
| | ACCOUNT THAT HP-6 SERVES AREAS OTHER THAN THE |
| | LAUNDRY/LINEN AREAS. AN AIR DISTRIBUTION SYSTEM SHALL |
| | BE DESIGNED AND INSTALLED TO SUPPLY THE REQUIRED |
| | DISTRIBUTION OF AIR IN ACCORDANCE WITH FBCM 603.1. |
| | |
| | 14. PG M104: FLOOR PLAN SHOWS LUGGAGE ROOM 111 IN THE |
| | SAME LOCATION AS THE FIRE COMMAND ROOM SHOWN ON PG |
| | A101. PLEASE COORDINATE FLOOR PLANS. ALSO, A FIRE |
| | COMMEND ROOM IS REQUIRED TO BE PROTECTED BY A MINIMUM |
| | 1-HOUR FIRE BARRIER IN ACCORDANCE WITH FBCB 911.1. |
| | THERE ARE MULTIPLE DUCT PENETRATIONS FROM HP-4 LOCATED |
| | ABOVE THIS ROOM WHICH WOULD BE PENETRATING THE FIRE |
| | BARRIER. SHOW THE FIRE BARRIER AS REQUIRED FOR THE FIRE |
| | COMMAND ROOM AND SHOW THE DUCT PENETRATIONS PROTECTED |
| | IN ACCORDANCE WITH FBCM 607.5.2. |
| | |
| | 15. PG M104: THE 12X10 OA DUCT PENETRATING THE RATED |
| | WALL AT STORAGE ROOM 128 IS UNPROTECTED. SHOW HOW THIS |
| | PENETRATION OF A RATED WALL ASSEMBLY IS TO BE PROTECTED |
| | IN ACCORDANCE WITH FBCM 607.5. |
| | |
| | 16. PG M104: THE 20X12 OA INTAKE DUCT PENETRATING THE |
| | RATED WALL AT STORAGE ROOM 128 IS UNPROTECTED. SHOW HOW |
| | THIS PENETRATION OF A RATED WALL ASSEMBLY IS TO BE |
| | PROTECTED IN ACCORDANCE WITH FBCM 607.5. |
| | |
| | 17. PG M104: THE TWO EXTENDED ROOMS (DOUBLE QUEEN 119 |
| | AND 121) ON THE FLOOR PLAN SHOW 30 CFM OF OA EACH WHILE |
| | THE VENTILATION SCHEDULE ON M101 CALLS FOR THESE ROOMS |
| | TO BE PROVIDED WITH 50 CFM EACH. COORDINATE FLOOR PLAN |
| | DUCT DESIGN WITH VENTILATION SCHEDULE, SHOWING THE |
| | PROPER DISTRIBUTION OF AIR IN ACCORDANCE WITH FBCM |
| | 603.1. |
| | |
| | 18. PG M104 AND M106: HP-OA1 IS SHOWN ON FLOOR PLAN TO |
| | BE WITHIN A FIRE RATED WALL ASSEMBLY BETWEEN STORAGE |
| | 128 AND HALL 127. IT IS NOT POSSIBLE TO MAINTAIN THE |
| | FIRE RESISTANCE RATING OF THIS ASSEMBLY WITH A HEAT |
| | PUMP IN IT. ALSO, CLEARANCES AROUND APPLIANCES TO |
| | ELEMENTS OF PERMANENT CONSTRUCTION SHALL BE SUFFICIENT |
| | TO ALLOW INSPECTIONS, SERVICE, REPAIR OR REPLACEMENT |
| | WITHOUT REMOVING SUCH ELEMENTS OF PERMANENT |
| | CONSTRUCTION OR DISABLING THE FUNCTION OF A REQUIRED |
| | FIRE RESISTANCE-RATED ASSEMBLY IN ACCORDANCE WITH FBCM |
| | 306.1. |
| | |
| | 19.PG M104 AND M106: THIS PAGE CONTAINS A GENERAL NOTE |
| | WHICH CLAIMS ALL DUCT PENETRATIONS INTO GUEST ROOMS DO |
| | NOT REQUIRE FIRE DAMPERS IN ACCORDANCE WITH EXCEPTION |
| | #2 UNDER FBCM 607.5.3. WHILE IT APPEARS THAT THE |
| | EXHAUST DUCTS TO THE GUEST ROOMS QUALIFY FOR THIS |
| | EXCEPTION, THE OUTSIDE AIR DUCT PENETRATIONS DO NOT |
| | QUALIFY. THE DUCT MUST MEET ALL SIX PARTS OF EXCEPTION |
| | #2. PART 2.3 OF THE EXCEPTION REQUIRES THAT THE DUCT |
| | MUST NOT HAVE ANY OPENINGS WHICH COMMUNICATE WITH THE |
| | CORRIDOR. THE OA DUCT HAS OPENINGS INTO THE CORRIDOR |
| | AND THEREFORE DOES NOT QUALIFY FOR THIS EXCEPTION. SHOW |
| | THE OA DUCT PENETRATIONS OF THE GUEST ROOMS FROM THE |
| | CORRIDOR PROTECTED WITH FIRE DAMPERS IN ACCORDANCE WITH |
| | FBCM 607.5.3. |
| | |
| | NOTE: EVEN THOUGH THE EXHAUST DUCTS MAY QUALIFY FOR THE |
| | FIRE DAMPER EXCEPTION, THEY SHALL BE PROTECTED AS A |
| | THROUGH-PENETRATION WITH A THROUGH-PENETRATION FIRESTOP |
| | SYSTEM IN ACCORDANCE WITH FBCM 607.1.1. |
| | |
| | 20. PG M104 AND M106: IN ADDITION TO THE FIRE DAMPER |
| | REQUIREMENTS ABOVE FOR THE GUEST ROOM OA DUCTS, THESE |
| | AND ALL OA DUCT PENETRATIONS OF THE CORRIDOR WALLS |
| | SHALL BE PROTECTED WITH SMOKE DAMPERS IN ACCORDANCE |
| | WITH FBCM 607.5.4. SHOW HOW THESE DAMPERS ARE TO BE |
| | ACTUATED IN ACCORDANCE WITH FBCM 607.5.4.1. |
| | |
| | 21. PG M104 AND M106: FLOOR PLAN SHOWS RELIEF AIR VENT |
| | LOUVERS FOR 3 STAIR SHAFT ENCLOSURES. STAIR AND |
| | ELEVATOR SHAFT VENTS SHALL BE EQUIPPED WITH MOTORIZED |
| | DAMPERS THAT ARE CAPABLE OF BEING AUTOMATICALLY CLOSED |
| | DURING NORMAL BUILDING OPERATION AND ARE INTERLOCKED TO |
| | OPEN AS REQUIRED BY FIRE AND SMOKE DETECTION SYSTEMS IN |
| | ACCORDANCE WITH FBCB 13-409.1.ABC.3.1 |
| | |
| | 22. PG M104 AND M106: EXIT ENCLOSURE VENTILATION |
| | OPENINGS INTO THE FIRE-RESISTANCE-RATED CONSTRUCTION |
| | SHALL BE LIMITED TO THOSE NEEDED FOR MAINTENANCE AND |
| | OPERATION AND SHALL BE PROTECTED BY SELF-CLOSING |
| | FIRE-RESISTANCE-RATED DEVICES IN ACCORDANCE WITH |
| | CHAPTER 7 FOR ENCLOSURE WALL OPENING PROTECTIVES PER |
| | FBCB 1019.1.3. |
| | |
| | 23. PG M106: THE OA INTAKE DUCT FOR HP-OA1 IS |
| | PENETRATING A RATED WALL BETWEEN THE CORRIDOR AND ROOM |
| | 313. SHOW THIS DUCT PENETRATION PROTECTED WITH FIRE AND |
| | SMOKE DAMPER IN ACCORDANCE WITH FBCM 607.5.3 AND |
| | 607.5.4. |
| | |
| | 24. PG M106: SEVERAL OF THE EXHAUST BRANCH DUCTS FOR |
| | EF1 IN GUEST ROOMS ARE MISSING SIZES ON THE PLANS. |
| | PROVIDE THE MISSING INFORMATION ON PLANS. FBCB 106.1.1. |
| | |
| | 25. PG M106: THE RELIEF AIR DUCT FOR STAIR C IS |
| | CROSSING THE CORRIDOR. EXIT ENCLOSURE VENTILATION SHALL |
| | BE DIRECTLY CONNECTED TO THE EXIT ENCLOSURE BY DUCTWORK |
| | ENCLOSED IN CONSTRUCTION AS REQUIRED BY THE FLORIDA |
| | BUILDING CODE, BUILDING FOR SHAFTS IN ACCORDANCE WITH |
| | FBCM 401.4(1) AND FBCB 1019.1.3(1). |
| | |
| | 26. PG M106: THE 6 INCH ROUND DUCT PENETRATING THE WALL |
| | BETWEEN LINEN STORAGE 306 AND THE CORRIDOR SHALL BE |
| | PROTECTED WITH FIRE AND SMOKE DAMPER IN ACCORDANCE WITH |
| | FBCM 607.5.3 AND 607.5.4. |
| | |
| | 27. PG M108: STAIR PRESSURIZATION FANS SF1, SF2 AND SF3 |
| | SHALL BE PROVIDED WITH PERMANENT ACCESS FOR SERVICE AND |
| | MAINTENANCE. SUCH ACCESS SHALL BE PROVIDED BY A |
| | PERMANENT APPROVED MEANS OF ACCESS, THE EXTENT OF WHICH |
| | SHALL BE FROM GRADE OR FLOOR LEVEL TO THE EQUIPMENT AND |
| | APPLIANCES??? LEVEL SERVICE SPACE IN ACCORDANCE WITH |
| | FBCM 306.5. |
| | |
| | 28. PG M108: STAIR PRESSURIZATION FANS SF1, SF2 AND SF3 |
| | ARE SUPPLY FANS AND SHALL PROVIDED WITH SMOKE DETECTORS |
| | IN ACCORDANCE WITH FBCM 606.2.1. THE SMOKE DETECTORS |
| | SHALL SHUT DOWN THE FANS UPON ACTIVATION AND SHALL BE |
| | CONNECTED TO THE FIRE ALARM SYSTEM IN ACCORDANCE WITH |
| | FBCM 606.4. |
| | |
| | 29. PG M108: HOISTWAYS OF ELEVATORS PENETRATING MORE |
| | THAN THREE STORIES SHALL BE PROVIDED WITH A MEANS FOR |
| | VENTING SMOKE AND HOT GASES TO THE OUTER AIR IN CASE OF |
| | FIRE IN ACCORDANCE WITH FBCB 3004.1. HOISTWAY VENTS |
| | SHALL BE LOCATED IN ACCORDANCE WITH 3004.2 AND SIZED IN |
| | ACCORDANCE WITH 3004.3. ELEVATOR SHAFT VENTS SHALL BE |
| | EQUIPPED WITH MOTORIZED DAMPERS THAT ARE CAPABLE OF |
| | BEING AUTOMATICALLY CLOSED DURING NORMAL BUILDING |
| | OPERATION AND ARE INTERLOCKED TO OPEN AS REQUIRED BY |
| | FIRE AND SMOKE DETECTION SYSTEMS IN ACCORDANCE WITH |
| | FBCB 13-409.1.ABC.3.1. |
| | |
| | 30. PG M108: SF1, SF2, SF3 AND CT1 SHALL BE DESIGNED |
| | AND INSTALLED TO RESIST WIND PRESSURES IN ACCORDANCE |
| | WITH FBCM 301.13. |
| | |
| | 31. PG M201: SEE COMMENT ABOVE FOR REQUIREMENTS FOR |
| | PROTECTION OF DUCT PENETRATIONS INTO GUEST ROOMS. |
| | |
| | 32. PG M201: ENLARGED ROOM PLANS SHOW ALL ROOMS WITH 50 |
| | CFM OF OA SUPPLY WHILE FLOOR PLANS ON M104 AND M106 AS |
| | WELL AS VENTILATION SCHEDULE ON M101 CALL FOR MOST |
| | ROOMS TO BE PROVIDED WITH 30 CFM OF OA. COORDINATE |
| | ENLARGED FLOOR PLANS WITH OTHER FLOOR PLANS AND |
| | VENTILATION SCHEDULE. THE VENTILATION RATES AS SHOWN ON |
| | THIS PAGE MAY EXCEED THE CAPACITY OF THE HP OA1 UNITS. |
| | |
| | 33. PG M401: HEAT PUMP PIPING DIAGRAM, EACH WATER |
| | SOURCE HEAT PUMP SHALL HAVE A TWO-POSITION AUTOMATIC |
| | VALVE INTERLOCKED TO SHUT OFF WATER FLOW WHEN THE |
| | COMPRESSOR IS OFF IN ACCORDANCE WITH FBCB |
| | 13-411.1.ABC.1.4. |
| | |
| | 34. PG M401: SHOW HOW EACH HEAT PUMP WILL BE PROVIDED |
| | WITH AUXILIARY DRAIN PROTECTION IN ACCORDANCE WITH FBCM |
| | 307.2.3. |
| | |
| | 35. PG M402: FLEX DUCT RUNOUT DETAIL, FLEX DUCT |
| | SUPPORTS SHALL ME MIN. 1 1/2 INCHES WIDE AND SPACED NO |
| | MORE THAN 5 FEET APART IN ACCORDANCE WITH FBCM |
| | 603.5.6.6. |
| | |
| | 36. PG M402: FIRE DAMPER INSTALLATION DETAIL, THE FIRE |
| | DAMPER MANUFACTURER???S INSTALLATION INSTRUCTIONS SHALL |
| | GOVERN AND SHALL BE AVAILABLE ON THE JOBSITE AT TIME OF |
| | INSPECTION IN ACCORDANCE WITH FBCM 607.2 AND FBCM |
| | 304.1. |
| | |
| | 37. ATRIUM: ARCHITECTURAL PLAN SHOWS AN ATRIUM |
| | CONNECTING FLOORS 2 THROUGH 6 ON PAGE A500. A SMOKE |
| | CONTROL SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH |
| | FBCB 404.4 AND FBCB SECTION 909. THE EXHAUST METHOD MAY |
| | BE USED IN THIS AREA IN ACCORDANCE WITH FBCB 909.8. |
| | |
| | 38. THE ANNEX PORTION OF THIS BUILDING IS AN ADDITION |
| | TO AN EXISTING BUILDING. AN ADDITION TO A BUILDING OR |
| | STRUCTURE SHALL COMPLY WITH THE BUILDING, PLUMBING, |
| | ELECTRICAL, AND MECHANICAL CODES IN ACCORDANCE WITH |
| | FBCEB 901.1. AS THIS ADDITION HAS OCCUPIED FLOORS |
| | LOCATED MORE THAN 75 FEET ABOVE THE LOWEST LEVEL OF |
| | FIRE DEPARTMENT VEHICLE ACCESS, IT IS CLASSIFIED AS A |
| | HIGH-RISE BUILDING IN ACCORDANCE WITH FBCB 403.1. ALSO, |
| | SMOKE CONTROL SHALL BE PROVIDED IN ACCORDANCE WITH FBCB |
| | 403.15 AND FBCB SECTION 909. PROVIDE GENERAL DESIGN |
| | REQUIREMENTS FOR SMOKE CONTROL SYSTEMS AS WELL AS A |
| | RATIONAL ANALYSIS WITH SEQUENCE OF OPERATIONS IN |
| | ACCORDANCE WITH FBCB 909.2 AND 909.4 |
| | |
| | 39. ENERGY CODE: ENERGY CODE COMPLIANCE FORM WAS |
| | PROVIDED, HOWEVER, THE COMPLIANCE FORM WAS NOT |
| | CERTIFIED BY THE DESIGNER OF RECORD AS REQUIRED IN |
| | ACCORDANCE WITH FBCB 13-103.1. |
| | |
| | 40. ENERGY CODE: THIS REVIEW IS FOR THE MECHANICAL |
| | PORTIONS OF THE ENERGY CALCULATIONS ONLY. PLEASE SEE |
| | OTHER TRADE REVIEWS FOR REQUIREMENTS RELATED TO THOSE |
| | TRADES. |
| | |
| | 41. ENERGY CODE: COOLING LOAD CALCULATIONS SHALL BE |
| | PROVIDED AND APPENDED TO THE ENERGY CALCULATIONS IN |
| | ACCORDANCE WITH FBCB 13-407.1.ABC.1. A THOROUGH REVIEW |
| | OF THE ENERGY CALCULATIONS CANNOT BE PERFORMED WITHOUT |
| | THIS INFORMATION. |
| | |
| | 42. ENERGY CODE: THE COOLING SYSTEMS LISTED IN THE |
| | INPUT REPORT DO NOT CORRESPOND WITH THE SYSTEMS SHOWN |
| | ON THE PLANS. EXAMPLE: ALL HEAT PUMPS ON EACH FLOOR |
| | APPEAR TO BE COMBINED INTO ONE SYSTEM WITH AN |
| | EFFICIENCY OF 12.00 LISTED. THERE ARE MULTIPLE, |
| | DIFFERENT SIZED HEAT PUMPS ON EACH FLOOR AND THEY HAVE |
| | DIFFERENT EFFICIENCIES. USE MULTIPLIERS TO LIST EACH |
| | TYPE OF SYSTEM ON EACH FLOOR WITH THE CORRECT |
| | CORRESPONDING EFFICIENCY RATING. ALSO, UNDER PLANT THE |
| | SYSTEM IS LISTED AS A CHILLER PLANT. THERE IS NO |
| | CHILLER PLANT SHOWN ON THE PLANS. THIS IS A WATER |
| | COOLED SYSTEM WITH COOLING TOWERS. THE PLANS AND |
| | SPECIFICATIONS, INCLUDING THE ENERGY CODE CALCULATIONS, |
| | SHALL SHOW, IN SUFFICIENT DETAIL, ALL PERTINENT DATA |
| | AND FEATURES OF THE BUILDING AND THE EQUIPMENT AND |
| | SYSTEMS AS HEREIN GOVERNED IN ACCORDANCE WITH FBCB |
| | 13-103.2. |
| | |
| | NOTE: THESE PLANS HAVE BEEN SUBMITTED FOR PLAN REVIEW |
| | ONLY. A PERMIT APPLICATION HAS NOT BEEN SUBMITTED. IF A |
| | PERMIT APPLICATION IS SUBMITTED AFTER MARCH 1ST, 2009, |
| | THE PLANS WILL NEED TO BE REVIEWED FOR COMPLIANCE WITH |
| | THE NEW 2007 EDITION OF THE FLORIDA BUILDING CODE. |
| | SUBMISSION OF A PERMIT APPLICATION BEFORE THAT DATE |
| | WILL ENSURE THE PLANS WILL REMAIN UNDER THE CODES WHICH |
| | ARE CURRENTLY IN EFFECT. |
| | |
| | WHEN RESUBMITTING PLANS, PLEASE RESPOND TO EACH COMMENT |
| | IN WRITING WITH A DESCRIPTION OF HOW THE COMMENT WAS |
| | ADDRESSED AND WHERE THE RELEVANT INFORMATION CAN BE |
| | LOCATED. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| | RONALD J. REGUEIRO |
| | 561.805.6719 |
| | [email protected] |