2009-01-26 00:22:16REVIEW #:1ST **PLAN CHECK ONLY**
 ACTION: DENIED
  
 FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 THESE PLANS HAVE BEEN REVIEWED FOR CODE COMPLIANCE AND
 THE FOLLOWING DEFICIENCIES HAVE BEEN IDENTIFIED:
  
 1. PG A101: GENERAL NOTE #8 CALLS FOR CO DETECTORS IN
 ALL AREAS WITH GAS POWERED EQUIPMENT. EVERY BUILDING
 FOR WHICH A BUILDING PERMIT IS ISSUED FOR NEW
 CONSTRUCTION ON OR AFTER JULY 1, 2008, AND HAVING A
 FOSSIL-FUEL-BURNING HEATER OR APPLIANCE, A FIREPLACE,
 OR AN ATTACHED GARAGE SHALL HAVE AN APPROVED
 OPERATIONAL CARBON MONOXIDE ALARM INSTALLED WITHIN 10
 FEET OF EACH ROOM USED FOR SLEEPING PURPOSES IN
 ACCORDANCE WITH FS 553.885(1).
  
 2. PG M101: THE VENTILATION SCHEDULE REFERENCES ASHRAE
 62.1-2007. THE CORRECT REFERENCE STANDARD FOR THE
 FLORIDA BUILDING CODE IS ASHRAE 62.1-2004. PROVIDE THE
 CORRECT REFERENCE ON PLANS AND ENSURE CALCULATIONS ARE
 BASED ON THE CORRECT EDITION OF THIS STANDARD.
  
 3. PG M101: VENTILATION SCHEDULE CALLS FOR A
 VENTILATION RATE OF 5 CFM/PERSON IN THE FITNESS ROOM.
 THE MINIMUM VENTILATION RATE REQUIRED IS 20 CFM/PERSON
 IN ACCORDANCE WITH ASHRAE 62.1-2004 TABLE 6-1.
 RECALCULATE THE REQUIRED VENTILATION FOR THIS SPACE
 BASED ON THE CORRECT PEOPLE OUTDOOR AIR RATE.
  
 4. PG M102: THE 32 INCH ROUND DRYER EXHAUST DUCT IS
 SHOWN PENETRATING FIRE RATED WALL ASSEMBLIES. HOW WILL
 THESE PENETRATIONS BE PROTECTED? SHOW HOW THESE DUCT
 PENETRATIONS SHALL BE PROTECTED IN ACCORDANCE WITH FBCM
 607.5 AND FBCM 504.2.
  
 5. PG M102: THE FLOOR PLAN SHOWS THE DRYER EXHAUST
 DUCTS BEING MANIFOLDED PRIOR TO CONNECTION TO THE LINT
 COLLECTOR. THE MANUFACTURER???S INSTRUCTIONS FOR THE
 LINT COLLECTOR CALL FOR EACH DRYER TO BE DUCTED TO THE
 LINT COLLECTOR WITHOUT A COMMON DRYER DUCT MANIFOLD.
 SEE DRAWING 2008.20 OF MANUFACTURER???S INSTRUCTIONS.
 SHOW THESE DUCT INSTALLED PER MANUFACTURER???S
 INSTRUCTIONS IN ACCORDANCE WITH FBCM 304.1.
  
 6. PG M102: EACH DRYER EXHAUST DUCT SHALL BE PROVIDED
 WITH BACKDRAFT DAMPER IN ACCORDANCE WITH FBCM 504.4.
  
 7. PG M102: COMPRESSED AIR AND WATER CONNECTIONS ARE
 REQUIRED FOR THE LINT COLLECTOR. PROVISIONS FOR THESE
 CONNECTIONS COULD NOT BE FOUND ON MECHANICAL OR
 PLUMBING PLANS. SHOW HOW THESE REQUIREMENTS ARE TO BE
 MET IN ACCORDANCE WITH FBCM 304.1.
  
 8. PG M102: ACCORDING TO DRYER SUBMITTAL, EACH OF THE
 FOUR DRYERS SHOWN ON PLANS WILL EXHAUST 1600 CFM. EACH
 DRYER IS REQUIRED TO HAVE 360 SQ.IN. OF FREE AREA TO
 THE OUTDOORS FOR MAKEUP AIR. NO SOURCE FOR MAKEUP AIR
 IS SHOWN ON PLANS. PROVIDE MAKEUP AIR PER INSTALLATION
 INSTRUCTIONS IN ACCORDANCE WITH FBCM 504.7.
  
 9. PG M102: ELEVATOR MACHINE ROOM 024 DOES NOT SHOW ANY
 MEANS OF VENTILATION OR AIR CONDITIONING. ELEVATOR
 MACHINE ROOMS THAT CONTAIN SOLID-STATE EQUIPMENT FOR
 ELEVATOR OPERATION SHALL BE PROVIDED WITH AN
 INDEPENDENT VENTILATION OR AIR-CONDITIONING SYSTEM TO
 PROTECT AGAINST THE OVERHEATING OF THE ELECTRICAL
 EQUIPMENT. THE SYSTEM SHALL BE CAPABLE OF MAINTAINING
 TEMPERATURES WITHIN THE RANGE ESTABLISHED FOR THE
 ELEVATOR EQUIPMENT IN ACCORDANCE WITH FBCB 3006.2.
  
 10. PG M102: FLOOR PLAN SHOWS HP-4 IN MECH ROOM 006
 PROVIDING 1650 CFM OF SUPPLY. ACCORDING TO THE HEAT
 PUMP SCHEDULE ON M301, HP-4 WILL PROVIDE 1200 CFM OF
 SUPPLY. HOW WILL HP-4 PROVIDE THE QUANTITIES OF SUPPLY
 CALLED FOR ON THE FLOOR PLAN? AN AIR DISTRIBUTION
 SYSTEM SHALL BE DESIGNED AND INSTALLED TO SUPPLY THE
 REQUIRED DISTRIBUTION OF AIR IN ACCORDANCE WITH FBCM
 603.1.
  
 11. PG M102: FLOOR PLAN SHOWS HP-4 IN BREAK ROOM 017
 PROVIDING 1000 CFM OF SUPPLY. ACCORDING TO THE HEAT
 PUMP SCHEDULE ON M301, HP-4 WILL PROVIDE 1200 CFM OF
 SUPPLY. HOW WILL HP-4 PROVIDE THE QUANTITIES OF SUPPLY
 CALLED FOR ON THE FLOOR PLAN? AN AIR DISTRIBUTION
 SYSTEM SHALL BE DESIGNED AND INSTALLED TO SUPPLY THE
 REQUIRED DISTRIBUTION OF AIR IN ACCORDANCE WITH FBCM
 603.1.
  
 12. PG M102: FLOOR PLAN SHOWS A 12X6 DUCT FROM HP-6 IN
 LAUNDRY ROOM PENETRATING A FIRE RESISTANCE RATED WALL
 ASSEMBLY WITH NO PROTECTION. SHOW HOW THIS DUCT
 PENETRATION IS TO BE PROTECTED IN ACCORDANCE WITH FBCM
 607.5.
 NOTE: IF CLAIMING AN EXCEPTION TO THE REQUIREMENT FOR A
 FIRE DAMPER, SHOW COMPLIANCE WITH FBCM 607.1.1.
  
 13. PG M102: FLOOR PLAN CALLS FOR THE OUTSIDE AIR DUCT
 SERVING HP-6 IN LAUNDRY ROOM TO BE BALANCED AT 125 CFM.
 THIS DOES NOT CORRESPOND WITH THE VENTILATION SCHEDULE
 ON M101 WHICH CALLS FOR THE LAUNDRY/LINEN AREAS TO BE
 PROVIDED WITH 140 CFM OF OUTSIDE AIR. ALSO TAKE INTO
 ACCOUNT THAT HP-6 SERVES AREAS OTHER THAN THE
 LAUNDRY/LINEN AREAS. AN AIR DISTRIBUTION SYSTEM SHALL
 BE DESIGNED AND INSTALLED TO SUPPLY THE REQUIRED
 DISTRIBUTION OF AIR IN ACCORDANCE WITH FBCM 603.1.
  
 14. PG M104: FLOOR PLAN SHOWS LUGGAGE ROOM 111 IN THE
 SAME LOCATION AS THE FIRE COMMAND ROOM SHOWN ON PG
 A101. PLEASE COORDINATE FLOOR PLANS. ALSO, A FIRE
 COMMEND ROOM IS REQUIRED TO BE PROTECTED BY A MINIMUM
 1-HOUR FIRE BARRIER IN ACCORDANCE WITH FBCB 911.1.
 THERE ARE MULTIPLE DUCT PENETRATIONS FROM HP-4 LOCATED
 ABOVE THIS ROOM WHICH WOULD BE PENETRATING THE FIRE
 BARRIER. SHOW THE FIRE BARRIER AS REQUIRED FOR THE FIRE
 COMMAND ROOM AND SHOW THE DUCT PENETRATIONS PROTECTED
 IN ACCORDANCE WITH FBCM 607.5.2.
  
 15. PG M104: THE 12X10 OA DUCT PENETRATING THE RATED
 WALL AT STORAGE ROOM 128 IS UNPROTECTED. SHOW HOW THIS
 PENETRATION OF A RATED WALL ASSEMBLY IS TO BE PROTECTED
 IN ACCORDANCE WITH FBCM 607.5.
  
 16. PG M104: THE 20X12 OA INTAKE DUCT PENETRATING THE
 RATED WALL AT STORAGE ROOM 128 IS UNPROTECTED. SHOW HOW
 THIS PENETRATION OF A RATED WALL ASSEMBLY IS TO BE
 PROTECTED IN ACCORDANCE WITH FBCM 607.5.
  
 17. PG M104: THE TWO EXTENDED ROOMS (DOUBLE QUEEN 119
 AND 121) ON THE FLOOR PLAN SHOW 30 CFM OF OA EACH WHILE
 THE VENTILATION SCHEDULE ON M101 CALLS FOR THESE ROOMS
 TO BE PROVIDED WITH 50 CFM EACH. COORDINATE FLOOR PLAN
 DUCT DESIGN WITH VENTILATION SCHEDULE, SHOWING THE
 PROPER DISTRIBUTION OF AIR IN ACCORDANCE WITH FBCM
 603.1.
  
 18. PG M104 AND M106: HP-OA1 IS SHOWN ON FLOOR PLAN TO
 BE WITHIN A FIRE RATED WALL ASSEMBLY BETWEEN STORAGE
 128 AND HALL 127. IT IS NOT POSSIBLE TO MAINTAIN THE
 FIRE RESISTANCE RATING OF THIS ASSEMBLY WITH A HEAT
 PUMP IN IT. ALSO, CLEARANCES AROUND APPLIANCES TO
 ELEMENTS OF PERMANENT CONSTRUCTION SHALL BE SUFFICIENT
 TO ALLOW INSPECTIONS, SERVICE, REPAIR OR REPLACEMENT
 WITHOUT REMOVING SUCH ELEMENTS OF PERMANENT
 CONSTRUCTION OR DISABLING THE FUNCTION OF A REQUIRED
 FIRE RESISTANCE-RATED ASSEMBLY IN ACCORDANCE WITH FBCM
 306.1.
  
 19.PG M104 AND M106: THIS PAGE CONTAINS A GENERAL NOTE
 WHICH CLAIMS ALL DUCT PENETRATIONS INTO GUEST ROOMS DO
 NOT REQUIRE FIRE DAMPERS IN ACCORDANCE WITH EXCEPTION
 #2 UNDER FBCM 607.5.3. WHILE IT APPEARS THAT THE
 EXHAUST DUCTS TO THE GUEST ROOMS QUALIFY FOR THIS
 EXCEPTION, THE OUTSIDE AIR DUCT PENETRATIONS DO NOT
 QUALIFY. THE DUCT MUST MEET ALL SIX PARTS OF EXCEPTION
 #2. PART 2.3 OF THE EXCEPTION REQUIRES THAT THE DUCT
 MUST NOT HAVE ANY OPENINGS WHICH COMMUNICATE WITH THE
 CORRIDOR. THE OA DUCT HAS OPENINGS INTO THE CORRIDOR
 AND THEREFORE DOES NOT QUALIFY FOR THIS EXCEPTION. SHOW
 THE OA DUCT PENETRATIONS OF THE GUEST ROOMS FROM THE
 CORRIDOR PROTECTED WITH FIRE DAMPERS IN ACCORDANCE WITH
 FBCM 607.5.3.
  
 NOTE: EVEN THOUGH THE EXHAUST DUCTS MAY QUALIFY FOR THE
 FIRE DAMPER EXCEPTION, THEY SHALL BE PROTECTED AS A
 THROUGH-PENETRATION WITH A THROUGH-PENETRATION FIRESTOP
 SYSTEM IN ACCORDANCE WITH FBCM 607.1.1.
  
 20. PG M104 AND M106: IN ADDITION TO THE FIRE DAMPER
 REQUIREMENTS ABOVE FOR THE GUEST ROOM OA DUCTS, THESE
 AND ALL OA DUCT PENETRATIONS OF THE CORRIDOR WALLS
 SHALL BE PROTECTED WITH SMOKE DAMPERS IN ACCORDANCE
 WITH FBCM 607.5.4. SHOW HOW THESE DAMPERS ARE TO BE
 ACTUATED IN ACCORDANCE WITH FBCM 607.5.4.1.
  
 21. PG M104 AND M106: FLOOR PLAN SHOWS RELIEF AIR VENT
 LOUVERS FOR 3 STAIR SHAFT ENCLOSURES. STAIR AND
 ELEVATOR SHAFT VENTS SHALL BE EQUIPPED WITH MOTORIZED
 DAMPERS THAT ARE CAPABLE OF BEING AUTOMATICALLY CLOSED
 DURING NORMAL BUILDING OPERATION AND ARE INTERLOCKED TO
 OPEN AS REQUIRED BY FIRE AND SMOKE DETECTION SYSTEMS IN
 ACCORDANCE WITH FBCB 13-409.1.ABC.3.1
  
 22. PG M104 AND M106: EXIT ENCLOSURE VENTILATION
 OPENINGS INTO THE FIRE-RESISTANCE-RATED CONSTRUCTION
 SHALL BE LIMITED TO THOSE NEEDED FOR MAINTENANCE AND
 OPERATION AND SHALL BE PROTECTED BY SELF-CLOSING
 FIRE-RESISTANCE-RATED DEVICES IN ACCORDANCE WITH
 CHAPTER 7 FOR ENCLOSURE WALL OPENING PROTECTIVES PER
 FBCB 1019.1.3.
  
 23. PG M106: THE OA INTAKE DUCT FOR HP-OA1 IS
 PENETRATING A RATED WALL BETWEEN THE CORRIDOR AND ROOM
 313. SHOW THIS DUCT PENETRATION PROTECTED WITH FIRE AND
 SMOKE DAMPER IN ACCORDANCE WITH FBCM 607.5.3 AND
 607.5.4.
  
 24. PG M106: SEVERAL OF THE EXHAUST BRANCH DUCTS FOR
 EF1 IN GUEST ROOMS ARE MISSING SIZES ON THE PLANS.
 PROVIDE THE MISSING INFORMATION ON PLANS. FBCB 106.1.1.
  
 25. PG M106: THE RELIEF AIR DUCT FOR STAIR C IS
 CROSSING THE CORRIDOR. EXIT ENCLOSURE VENTILATION SHALL
 BE DIRECTLY CONNECTED TO THE EXIT ENCLOSURE BY DUCTWORK
 ENCLOSED IN CONSTRUCTION AS REQUIRED BY THE FLORIDA
 BUILDING CODE, BUILDING FOR SHAFTS IN ACCORDANCE WITH
 FBCM 401.4(1) AND FBCB 1019.1.3(1).
  
 26. PG M106: THE 6 INCH ROUND DUCT PENETRATING THE WALL
 BETWEEN LINEN STORAGE 306 AND THE CORRIDOR SHALL BE
 PROTECTED WITH FIRE AND SMOKE DAMPER IN ACCORDANCE WITH
 FBCM 607.5.3 AND 607.5.4.
  
 27. PG M108: STAIR PRESSURIZATION FANS SF1, SF2 AND SF3
 SHALL BE PROVIDED WITH PERMANENT ACCESS FOR SERVICE AND
 MAINTENANCE. SUCH ACCESS SHALL BE PROVIDED BY A
 PERMANENT APPROVED MEANS OF ACCESS, THE EXTENT OF WHICH
 SHALL BE FROM GRADE OR FLOOR LEVEL TO THE EQUIPMENT AND
 APPLIANCES??? LEVEL SERVICE SPACE IN ACCORDANCE WITH
 FBCM 306.5.
  
 28. PG M108: STAIR PRESSURIZATION FANS SF1, SF2 AND SF3
 ARE SUPPLY FANS AND SHALL PROVIDED WITH SMOKE DETECTORS
 IN ACCORDANCE WITH FBCM 606.2.1. THE SMOKE DETECTORS
 SHALL SHUT DOWN THE FANS UPON ACTIVATION AND SHALL BE
 CONNECTED TO THE FIRE ALARM SYSTEM IN ACCORDANCE WITH
 FBCM 606.4.
  
 29. PG M108: HOISTWAYS OF ELEVATORS PENETRATING MORE
 THAN THREE STORIES SHALL BE PROVIDED WITH A MEANS FOR
 VENTING SMOKE AND HOT GASES TO THE OUTER AIR IN CASE OF
 FIRE IN ACCORDANCE WITH FBCB 3004.1. HOISTWAY VENTS
 SHALL BE LOCATED IN ACCORDANCE WITH 3004.2 AND SIZED IN
 ACCORDANCE WITH 3004.3. ELEVATOR SHAFT VENTS SHALL BE
 EQUIPPED WITH MOTORIZED DAMPERS THAT ARE CAPABLE OF
 BEING AUTOMATICALLY CLOSED DURING NORMAL BUILDING
 OPERATION AND ARE INTERLOCKED TO OPEN AS REQUIRED BY
 FIRE AND SMOKE DETECTION SYSTEMS IN ACCORDANCE WITH
 FBCB 13-409.1.ABC.3.1.
  
 30. PG M108: SF1, SF2, SF3 AND CT1 SHALL BE DESIGNED
 AND INSTALLED TO RESIST WIND PRESSURES IN ACCORDANCE
 WITH FBCM 301.13.
  
 31. PG M201: SEE COMMENT ABOVE FOR REQUIREMENTS FOR
 PROTECTION OF DUCT PENETRATIONS INTO GUEST ROOMS.
  
 32. PG M201: ENLARGED ROOM PLANS SHOW ALL ROOMS WITH 50
 CFM OF OA SUPPLY WHILE FLOOR PLANS ON M104 AND M106 AS
 WELL AS VENTILATION SCHEDULE ON M101 CALL FOR MOST
 ROOMS TO BE PROVIDED WITH 30 CFM OF OA. COORDINATE
 ENLARGED FLOOR PLANS WITH OTHER FLOOR PLANS AND
 VENTILATION SCHEDULE. THE VENTILATION RATES AS SHOWN ON
 THIS PAGE MAY EXCEED THE CAPACITY OF THE HP OA1 UNITS.
  
 33. PG M401: HEAT PUMP PIPING DIAGRAM, EACH WATER
 SOURCE HEAT PUMP SHALL HAVE A TWO-POSITION AUTOMATIC
 VALVE INTERLOCKED TO SHUT OFF WATER FLOW WHEN THE
 COMPRESSOR IS OFF IN ACCORDANCE WITH FBCB
 13-411.1.ABC.1.4.
  
 34. PG M401: SHOW HOW EACH HEAT PUMP WILL BE PROVIDED
 WITH AUXILIARY DRAIN PROTECTION IN ACCORDANCE WITH FBCM
 307.2.3.
  
 35. PG M402: FLEX DUCT RUNOUT DETAIL, FLEX DUCT
 SUPPORTS SHALL ME MIN. 1 1/2 INCHES WIDE AND SPACED NO
 MORE THAN 5 FEET APART IN ACCORDANCE WITH FBCM
 603.5.6.6.
  
 36. PG M402: FIRE DAMPER INSTALLATION DETAIL, THE FIRE
 DAMPER MANUFACTURER???S INSTALLATION INSTRUCTIONS SHALL
 GOVERN AND SHALL BE AVAILABLE ON THE JOBSITE AT TIME OF
 INSPECTION IN ACCORDANCE WITH FBCM 607.2 AND FBCM
 304.1.
  
 37. ATRIUM: ARCHITECTURAL PLAN SHOWS AN ATRIUM
 CONNECTING FLOORS 2 THROUGH 6 ON PAGE A500. A SMOKE
 CONTROL SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH
 FBCB 404.4 AND FBCB SECTION 909. THE EXHAUST METHOD MAY
 BE USED IN THIS AREA IN ACCORDANCE WITH FBCB 909.8.
  
 38. THE ANNEX PORTION OF THIS BUILDING IS AN ADDITION
 TO AN EXISTING BUILDING. AN ADDITION TO A BUILDING OR
 STRUCTURE SHALL COMPLY WITH THE BUILDING, PLUMBING,
 ELECTRICAL, AND MECHANICAL CODES IN ACCORDANCE WITH
 FBCEB 901.1. AS THIS ADDITION HAS OCCUPIED FLOORS
 LOCATED MORE THAN 75 FEET ABOVE THE LOWEST LEVEL OF
 FIRE DEPARTMENT VEHICLE ACCESS, IT IS CLASSIFIED AS A
 HIGH-RISE BUILDING IN ACCORDANCE WITH FBCB 403.1. ALSO,
 SMOKE CONTROL SHALL BE PROVIDED IN ACCORDANCE WITH FBCB
 403.15 AND FBCB SECTION 909. PROVIDE GENERAL DESIGN
 REQUIREMENTS FOR SMOKE CONTROL SYSTEMS AS WELL AS A
 RATIONAL ANALYSIS WITH SEQUENCE OF OPERATIONS IN
 ACCORDANCE WITH FBCB 909.2 AND 909.4
  
 39. ENERGY CODE: ENERGY CODE COMPLIANCE FORM WAS
 PROVIDED, HOWEVER, THE COMPLIANCE FORM WAS NOT
 CERTIFIED BY THE DESIGNER OF RECORD AS REQUIRED IN
 ACCORDANCE WITH FBCB 13-103.1.
  
 40. ENERGY CODE: THIS REVIEW IS FOR THE MECHANICAL
 PORTIONS OF THE ENERGY CALCULATIONS ONLY. PLEASE SEE
 OTHER TRADE REVIEWS FOR REQUIREMENTS RELATED TO THOSE
 TRADES.
  
 41. ENERGY CODE: COOLING LOAD CALCULATIONS SHALL BE
 PROVIDED AND APPENDED TO THE ENERGY CALCULATIONS IN
 ACCORDANCE WITH FBCB 13-407.1.ABC.1. A THOROUGH REVIEW
 OF THE ENERGY CALCULATIONS CANNOT BE PERFORMED WITHOUT
 THIS INFORMATION.
  
 42. ENERGY CODE: THE COOLING SYSTEMS LISTED IN THE
 INPUT REPORT DO NOT CORRESPOND WITH THE SYSTEMS SHOWN
 ON THE PLANS. EXAMPLE: ALL HEAT PUMPS ON EACH FLOOR
 APPEAR TO BE COMBINED INTO ONE SYSTEM WITH AN
 EFFICIENCY OF 12.00 LISTED. THERE ARE MULTIPLE,
 DIFFERENT SIZED HEAT PUMPS ON EACH FLOOR AND THEY HAVE
 DIFFERENT EFFICIENCIES. USE MULTIPLIERS TO LIST EACH
 TYPE OF SYSTEM ON EACH FLOOR WITH THE CORRECT
 CORRESPONDING EFFICIENCY RATING. ALSO, UNDER PLANT THE
 SYSTEM IS LISTED AS A CHILLER PLANT. THERE IS NO
 CHILLER PLANT SHOWN ON THE PLANS. THIS IS A WATER
 COOLED SYSTEM WITH COOLING TOWERS. THE PLANS AND
 SPECIFICATIONS, INCLUDING THE ENERGY CODE CALCULATIONS,
 SHALL SHOW, IN SUFFICIENT DETAIL, ALL PERTINENT DATA
 AND FEATURES OF THE BUILDING AND THE EQUIPMENT AND
 SYSTEMS AS HEREIN GOVERNED IN ACCORDANCE WITH FBCB
 13-103.2.
  
 NOTE: THESE PLANS HAVE BEEN SUBMITTED FOR PLAN REVIEW
 ONLY. A PERMIT APPLICATION HAS NOT BEEN SUBMITTED. IF A
 PERMIT APPLICATION IS SUBMITTED AFTER MARCH 1ST, 2009,
 THE PLANS WILL NEED TO BE REVIEWED FOR COMPLIANCE WITH
 THE NEW 2007 EDITION OF THE FLORIDA BUILDING CODE.
 SUBMISSION OF A PERMIT APPLICATION BEFORE THAT DATE
 WILL ENSURE THE PLANS WILL REMAIN UNDER THE CODES WHICH
 ARE CURRENTLY IN EFFECT.
  
 WHEN RESUBMITTING PLANS, PLEASE RESPOND TO EACH COMMENT
 IN WRITING WITH A DESCRIPTION OF HOW THE COMMENT WAS
 ADDRESSED AND WHERE THE RELEVANT INFORMATION CAN BE
 LOCATED.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved