| Plan Review Notes For Permit 08100686 |
| Permit Number |
08100686 |
|
| Review Stop |
ENG |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2008-12-26 13:28:45 | ***** FAILED ***** | | | | | | PLANS HAVE BEEN APPROVED THRU ENGINEERING DEPT. HOWEVER | | | THERE ARE ITEMS PENDING SUCH AS | | | APPROVED MATERIAL LIST. | | | HTTP://WWW.CITYOFWPB.ORG/ENGINEERING/ENG_FORMS.PHP | | | ERROSION AND LAND STABILIZATION BOND (PERFORMANCE BOND | | | OR LETTER OF CREDIT ACCEPTABLE) | | | HTTP://WWW.CITYOFWPB.ORG/ENGINEERING/ENG_FORMS.PHP | | | PRE-CONSTRUCTION HAS NOT BEEN SCHEDULED WITH | | | ENGINEERING | | | 4 LATEST SETS OF SITE ENGINEERING PLANS (WATER SEWER | | | AND STORM) WILL NEED TO BE SUBMITTED TO SET-UP PREWORK. | | | (2 MUST BE STAMPED BY EMERY AND RETURNED FOR SUBMISSION | | | BACK TO CONSTRUCTION SERVICES WITH RESPONSE TO ITEMS | | | ABOVE) | | | | | | PLEASE CONTACT: | | | | | | EMERY FABIAN, PROJECT COORDINATOR | | | LOCATION ADDRESS: | | | CITY OF WEST PALM BEACH | | | ENGINEERING SERVICES DEPARTMENT | | | 1000 - 45TH STREET, SUITE 15 | | | WEST PALM BEACH FL 33407 | | | MAILING ADDRESS: | | | CITY OF WEST PALM BEACH | | | ENGINEERING SERVICES DEPARTMENT | | | P.O. BOX 3506 | | | WEST PALM BEACH FL 33401 | | | TELEPHONE: | | | 45TH STREET OFFICE : 561-494-1040 | | | 45TH DIRECT: 561-494-1078 | | | FAX: 561-494-1117 | | | CENTRAL OPERATIONS CENTER (DISPATCH) 561-822-2210 | | | E-MAIL: | | | [email protected] | | | | | | | | | |
|