| Date |
Text |
| 2009-07-30 18:45:32 | REVISION DENIED |
| | REFERENCE: |
| | FBC-2007 PLUMBING |
| | FBC-2007 CHAPTER 1 |
| | FBC-2007 CAHPTER 11 |
| | |
| | 1. SHTS P-1 & P-1B INDICATE WHERE THE SANITARY BUILDING |
| | DRAIN CONNECTS TO THE BUILDING SEWER FOR THE FIXTURES |
| | AT THE EQUIPMENT SANITARY. SECTION 701.3. |
| | |
| | 2. SHTS P-1 & P-1B FITTING FOR FLOOR DRAIN DOWS NOT |
| | ALLOW THE SEWAGE/WASTE TO BE GUIDED IN THE DIRECTION OF |
| | FLOW. SECTION 706.3. |
| | |
| | 3. SHTS P-1 & P-1A GREASE EATING BACTERIA. PLEASE |
| | SUBMIT MANUF. SPECIFICATION ON SYSTEM. SECTION 106.1.2, |
| | (MORE INFORMATION REQUIRED). |
| | |
| | 4. SHT P-1 3 INCH SANITARY FROM 2ND FLOOR TO DRYWELL IS |
| | PROHIBITED. SECTION 301.3. |
| | |
| | 5. SUBMIT CALCULATIONS FOR MINIMUM FACILITIES PER |
| | TABLES 1004.1.1, (BLDG) & 403.1, (PLMG). INDICATE THE |
| | SQUARE FOOTAGE & OCCUPANCY LOAD FOR ALL OCCUPANCIES, |
| | ASSEMBLY, BUSINESS, STORAGE ETC. INDICATE THE TOTAL |
| | OCCUPANCY INCLUDING ALL NEW SEATING. ALSO SHOW POTTY |
| | PARITY AS REQUIRED IN SECTION 403.1.1. |
| | |
| | 6. SHT 310 DETAIL #6 BATHROOM TO BE ADAPTABLE. SUBMIT |
| | INFORMATION ON DETAIL SHOWING ALL BACKING FOR REQUIRED |
| | GRAB BARS IN THE SHOWER AND AT THE WATER CLOSET |
| | SECTIONS 11-4.16.4 & 11-4.21.4. INDICATE THE W/C TO BE |
| | 18" OFF THE WALL TO THE CENTERLINE OF THE FIXTURE. (FIG |
| | 28). SHOW THE REQUIRED TURNING AREA IN THE BATHROOM. |
| | 11-4.23.3. |
| | |
| | 7. SHT P-1A DETAIL 3. INCOMPLETE INFORMATION ON THE |
| | LEFT SIDE OF DETAIL. PLEASE CLARIFY. SECTIONS 106.1.1 & |
| | 106.1.2. |
| | |
| | 8. SHT P-2B INDICATE WHERE THE WATER HEATER PAN DRAIN |
| | LINE TERMINATES. SECTION 504.7.2. |
| | |
| | 9. SHT P-3A THE SANITARY ISOMETRIC RISER DIAGRAM DOES |
| | NOT REFLECT THE FLOOR PLAN, NOR DOES IT MEET CODE. |
| | PLEASE ADDRESS THE FOLLOWING: |
| | - THE CLEANOUTS REQUIRED BY SECTIONS 708.3.2 & 708.3.5 |
| | SHOWN ON THE FLOOR PLAN ARE MISSING ON THE RISER. |
| | - THE FITTING AT THE JUNCTION OF THE BUILDING DRAIN & |
| | THE BUILDING SEWER AT THE N.W. CORNER OF THE BUILDING |
| | DOES NOT GUIDE THE SEWAGE/WASTE IN THE DIRECTION OF |
| | FLOW. SECTION 706.3. |
| | - PIPING TO THE W/C & LAV IN THE MEN'S LOCKER ROOM DOES |
| | NOT REFLECT THE FLOOR PLAN. SECTION 701.1. |
| | - THE VENT IS MISSING IN ONE GANG SHOWER BUT IS SHOWN |
| | ON THE FLOOR PLAN. SECTION 901.1. |
| | - FLOOR DRAINS IN THE GANG BATH ON THE SECOND FLOOR ARE |
| | SHOWN BETWEEN THE LAST W/C & THE NEXT TO LAST W/C ON |
| | THE FLOOR PLAN, BUT AFTER ALL W/C'S ON THE RISER |
| | DIAGRAM. SECTION 701.1. PLEASE CORRELATE. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| | WITH A DESCRIPTION OF THE REVISION MADE, |
| | IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE |
| | ALL VOID SHEETS FROM ALL PLANS AND PLACE |
| | ONE SET OF THEM LOOSELY ON TOP OF THE |
| | COLLATED PLANS TO BE REVIEWED. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | |