| Date |
Text |
| 2009-07-19 10:58:33 | |
| | |
| | |
| | |
| | |
| | |
| | ** DENIED REVISION ** |
| | |
| | |
| | 1) NOTE: PLEASE SUBMIT COPIES OF DOCUMENTS FOR |
| | SUCCESSOR ARCHITECT. THERE APPEARS TO HAVE BEEN |
| | PREVIOUS REVISIONS WITH NEW ARCHITECT ALSO HOWEVER NOT |
| | LETTERS FOR NEW ARCHITECT COULD BE LOCATED. |
| | FS 481, FAC 61G1-18.002 |
| | |
| | |
| | 2) NOTE: PLANS ARE CONFUSING FOR WHICH CODE THE PROJECT |
| | WILL BE UNDER. THE COVER SHEET SPECIFICALLY STATES THE |
| | LIFE SAFETY CODE AND THE FLORIDA FIRE PREVENTION CODES |
| | AS THE 2007 EDITIONS. PLEASE KNOW THERE IS NO 2007 |
| | EDITION OF NFPA-101. AS OF DECEMBER 31ST,2008 THE NEW |
| | ADOPTED EDITION OF NFPA-101 IS THE 2006 EDITION. |
| | AS OF THE SAME DATE THE 2007 FFPC IS ACCURATE. HOWEVER |
| | THIS CONFUSING BASED ON THE FACT THE PLANS ARE |
| | SUBMITTED REVISIONS WITH THE 2004 FBC STATED AT SEVERAL |
| | LOCATIONS. |
| | PHASE ONE NEEDS TO BE COMPLETED AND/OR HAVE NO AFFECT |
| | ON THE PHASE TWO PROPOSED SCOPE OF WORK. BASED ON THE |
| | SUBMITTED FLA COM REPORT ALONE THIS IS NOT PERMITTED AT |
| | THIS TIME. IT WAS THE UNDERSTANDING OF THIS REVIEWER |
| | BASED ON INFORMATION GIVEN THAT PHASE II WOULD BE UNDER |
| | SEPARATE PERMIT AND NOT A PHASED REVISION TO THE BASE |
| | PERMIT. |
| | THE REVIEW IS BEING DONE UNDER THE CODES STATED ON |
| | PLANS BASED ON REVISIONS SUBMITTED TO BASE PERMIT. |
| | ** THIS IS BEING NOTED AS THE INTENT AND SEQUENCE OF |
| | PERMITTING AND PHASING IS NOT CLEAR AT THIS TIME. |
| | ** IT IS IMPORTANT TO KNOW IF THE APPLIED SCOPE OF WORK |
| | IS TO BE UNDER NEW PERMIT AS IT IS UNDERSTOOD THIS |
| | WOULD PLACE PROJECT UNDER THE 2007 FBC WITH 2009 |
| | REVISIONS ALONG WITH OTHER NEW ADOPTED CODES. THIS |
| | WOULD AFFECT CALCULATIONS AND SOME OTHER ITEMS ON |
| | PLANS. |
| | |
| | 3) NOTE: PLEASE SUBMIT COMPLETE NEW LIGHTING |
| | PERFORMANCE CALCULATIONS PER 13-415.AB.5 (2007) OR |
| | 13-415.2.ABC.1.1, .1.2, .1.3 FOR 2004 |
| | THE INFORMATION SUBMITTED ON THE IDR, SUMMARY SHEETS, |
| | AND COVER SHEETS OF THE FLA COM DOES NOT COORDINATE |
| | WITH THE SUBMITTED PLANS. PLANS. SQ FT FOR THE ENTIRE |
| | REVISED PLAN NEEDS TO BE UPDATED. |
| | ONE EXAMPLE BESIDES THE ITEMS ABOVE IS THE PRO-SHOP |
| | ROOM. THE IDR DOES NOT COORDINATE WITH PLANS. |
| | ** KEEP IN MIND ALL FIXTURES SHALL BE SPECIFIC AT THIS |
| | TIME WITH ALL DETAILS. IF A FIXTURE HAS NOT YET BEEN |
| | DETERMINED THEN PLEASE FIND A FIXTURE WHICH MEET CODE |
| | COMPLIANCE AT THIS TIME. THE FIXTURE LEGEND MAY ALWAYS |
| | BE UPDATED AT A LATER DATE ALONG WITH THE CALCULATIONS. |
| | AS LONG AS PLANS AND CALCULATIONS MEET MINIMUM CODES |
| | FOR ISSUANCE ( IF UNDER SEPARATE PERMIT). |
| | |
| | 4) NOTE: IF THE PROPOSED SCOPE OF WORK IS GOING TO BE A |
| | REVISION TO THE BASE PERMIT THE COMPLETE VALUE FOR THE |
| | COMPLETE SCOPE OF WORK IN PHASE ONE AND PHASE TWO NEEDS |
| | TO BE UPDATED. FBC 108.3. THE BASE VALUE HAS NOT BEEN |
| | INCREASED TO DATE. |
| | VALUE SHALL INCLUDE DESIGN COSTS, ALL LABOR, MATERIALS |
| | AND EQUIPMENT (PERMANENT) EVEN IF ANY OF THESE ITEMS |
| | ARE OWNER SUPPLIED. THE ORIGINAL APPLIED VALUE IS |
| | EXTREMELY LOW BASED ON THE SCOPE, EQUIPMENT ETC AND |
| | NEEDS TO BE ADJUSTED. |
| | |
| | 5) NOTE: PLEASE SEE NOTES FROM ELECTRICAL REVIEW DATED |
| | 4/17/2009. PLEASE COORDINATE ALL PLANS INCLUDING SITE |
| | LIGHTING, SITE PLANS ETC. PLEASE SEE COMMENTS FROM |
| | OTHER TRADES WHICH WILL AFFECT THE ELECTRICAL PLANS. |
| | ONE EXAMPLE ALONG IS THE LOCATION OF THE PROPOSED |
| | GENERATOR WHICH IS NOT PERMITTED. |
| | |
| | 6) NOTE: PLEASE SUBMIT COMPLETE NEW PHOTO-METRICS FOR |
| | ALL EGRESS PATHS MEETING NFPA-101 7.8.1.3, 7.9.1.1, |
| | .1.2. PLEASE SEE 7.8.1.2.2 FOR ANY OCCUPANCY DEVICES |
| | USED FOR EGRESS LIGHTING. THERE ARE SEVERAL NEW |
| | INTERIOR STAIRS WHICH NEED TO BE UPDATED. |
| | **IMPORTANT, THE EXTERIOR EGRESS STAIRS SHALL ALSO |
| | COMPLY AS THIS IS ALSO REQUIRED TO THE RIGHT OF WAY. |
| | THE LANDING IS NOT THE RIGHT OF WAY. |
| | ** IMPORTANT, IF MEETING ANY EXCEPTIONS TO STAIR AREAS |
| | DURING PERFORMANCES THEN PLANS NEED TO PROVIDE MORE |
| | INFORMATION ON ALL LEVELS. NORMAL, EMERGENCY, |
| | PERFORMANCE ETC. |
| | ** KEEP IN MIND STAIR AREAS IN ELEVATED SEATING AREAS |
| | SHALL ALSO BE CONSIDERED. |
| | |
| | 7) NOTE: PLEASE SEE ASME-17 UNDER THE 2004 EDITION FOR |
| | STATE ELEVATOR CODE REQUIREMENTS. THIS DEPARTMENT DOES |
| | NOT REVIEW FOR THESE ITEMS FOR CODE COMPLIANCE. HOWEVER |
| | THERE ARE ITEMS ON THE PLANS WHICH DO NOT APPEAR TO |
| | MEET SOME CHANGES IN THE ELEVATOR CODE. SEE NEW |
| | LIGHTING LEVELS REQUIRED FOR PITS, MACHINE ROOMS, SILLS |
| | ETC. |
| | ** THIS IS ONLY NOTED FOR INFORMATION. THIS IS NOT |
| | SOMETHING THAT WOULD WANT TO COME UP AT THE FINAL |
| | INSPECTION BY THE STATE ELEVATOR INSPECTOR. |
| | |
| | 8) NOTE: PLEASE SEE SECTIONS 620.21-620.25. DEDICATE |
| | BRANCH CIRCUITS ARE REQUIRED FOR SEVERAL AREAS. ONE OF |
| | THE ITEMS SHOWN ON PLANS IS THE LIGHTING IN THE |
| | ELEVATOR EQUIPMENT ROOM WHICH IS NOT SHOWN ON A |
| | DEDICATED BRANCH CIRCUIT AS REQUIRED BY 620.23. KEEP IN |
| | MIND THE NOTE ABOVE WITH RESPECT TO THE ASME-17 CHANGES |
| | IN THE 2004 CODE. THE LIGHTING SHOWN WOULD NOT MEET NEW |
| | MINIMUMS. |
| | |
| | 9) NOTE: PLEASE SEE 13-415.1.ABC.1.1,.1.2 AND .1.3 FOR |
| | INTERIOR LIGHTING CONTROLS. INTERIOR LIGHTING FOR ITEMS |
| | SUCH AS ACCENT LIGHTING SHALL HAVE SEPARATE CONTROLS. |
| | SEE SECTION .1.3. |
| | PLEASE SEE 2007 FBC IF PROJECT IS GOING TO BE UNDER |
| | SEPARATE PERMIT. |
| | NEED TO PROVIDE UPDATED ZONE PLANS FOR ALL LIGHTING |
| | CONTROLS AND SYSTEM. AS PHASE I IS NOT YET COMPLETED |
| | AND PHASE II WILL DIRECTLY AFFECT THE EXISTING SYSTEM |
| | ALL OF THESE ITEMS NEED TO BE UPDATED. THE ENTIRE BUILD |
| | OUT LCP SCHEDULE WITH ZONES NEEDS TO BE UPDATED. |
| | |
| | 10) NOTE: PLEASE SEE 240.21C. A NOTE #1 ON THE |
| | TRANSFORMER SCHEDULE MENTIONS ALL PANEL BOARDS ON THE |
| | SECONDARY SIDE SHALL CONTAIN MAIN CIRCUIT BREAKERS. |
| | HOWEVER PLEASE SEE PANELS SW AND SE AS BOTH OF THESE |
| | INDICATE THESE PANELS A MAIN LUG ONLY. BOTH OF THESE |
| | PANELS NEED TO BE UPDATED. |
| | |
| | 11) NOTE: PLEASE UPDATE FEEDERS ON THE SBA SWITCHBOARD |
| | FOR *H1B*. |
| | 215.5,310.16 ETC |
| | |
| | 12) NOTE: PLEASE ADJUST NOTE FOR TRANSFORMER GROUNDING |
| | ELECTRODE ATTACHMENT FOR ACTUAL ATTACHMENT LOCATION. |
| | 250.20,250.30,250.50. |
| | PLEASE ADD NOTE TO PLANS FOR FRAMING BONDS PER FBC |
| | 2704.1 |
| | |
| | 13) NOTE: PLEASE ADD NOTE FOR LIGHTING DISCONNECT |
| | REQUIRED PER 410.73G. THIS IS AT THE REQUEST OF |
| | INSPECTORS TO BE SHOWN ON PLANS AS THIS HAS BECOME A |
| | COMMON FAILURE ITEM IN THE FIELD. |
| | |
| | 14) NOTE: PLEASE BE SURE THE LIGHTING AS NOTED ABOVE |
| | FOR ELEVATOR MACHINE ROOM IS UPDATED TO MEET 700.16 |
| | ALSO. THE SINGLE FIXTURE AS SHOWN ONCE BURNT OUT OR NOT |
| | WORKING WOULD LEAVE THIS AREA IN TOTAL DARKNESS. |
| | PLEASE BE SURE OTHER AREAS ONCE UPDATED FOR EGRESS |
| | NOTES ABOVE ARE ALSO UPDATED. |
| | |
| | 15) NOTE: PHASE I PLANS WOULD NEED TO BE UPDATED. |
| | |
| | ** AS THERE IS INFORMATION NOT YET SUBMITTED, |
| | DETERMINED OR COMPLETE, THERE MAY VERY WELL BE NEW |
| | COMMENTS WHICH CAN NOT YET BE MADE. |
| | |
| | ** PLANS ARE NO LONGER RELEASED PER NEW BUILDING |
| | OFFICIAL. |
| | |
| | 16) NOTE: IT IS TO BE NOTED ONCE AGAIN PLANS STILL |
| | INDICATE A 3POLE ATS. THERE MAY BE A LOSS OF |
| | COORDINATION FROM NORMAL AND GENERATOR POWER TRANSFER. |
| | THIS IS NOTED ONLY AND DOES NOT VIOLATE CODE AS BACK UP |
| | IS STRICTLY OPTIONAL STAND-BY. THIS WILL REMAIN IN |
| | NOTES UNTIL COMPLETION OF PROJECT. THERE IS NO NEED FOR |
| | A RESPONSE BY DESIGNER. |
| | |
| | IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT |
| | TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO |
| | CONTACT THIS REVIEWER. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW II |
| | CONSTRUCTION SERVICES DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |
| | [email protected] |
| | |