 ** DENIED REVISION **
  
  
 1) NOTE: PLEASE SUBMIT COPIES OF DOCUMENTS FOR
 SUCCESSOR ARCHITECT. THERE APPEARS TO HAVE BEEN
 PREVIOUS REVISIONS WITH NEW ARCHITECT ALSO HOWEVER NOT
 LETTERS FOR NEW ARCHITECT COULD BE LOCATED.
 FS 481, FAC 61G1-18.002
  
  
 2) NOTE: PLANS ARE CONFUSING FOR WHICH CODE THE PROJECT
 WILL BE UNDER. THE COVER SHEET SPECIFICALLY STATES THE
 LIFE SAFETY CODE AND THE FLORIDA FIRE PREVENTION CODES
 AS THE 2007 EDITIONS. PLEASE KNOW THERE IS NO 2007
 EDITION OF NFPA-101. AS OF DECEMBER 31ST,2008 THE NEW
 ADOPTED EDITION OF NFPA-101 IS THE 2006 EDITION.
 AS OF THE SAME DATE THE 2007 FFPC IS ACCURATE. HOWEVER
 THIS CONFUSING BASED ON THE FACT THE PLANS ARE
 SUBMITTED REVISIONS WITH THE 2004 FBC STATED AT SEVERAL
 LOCATIONS.
 PHASE ONE NEEDS TO BE COMPLETED AND/OR HAVE NO AFFECT
 ON THE PHASE TWO PROPOSED SCOPE OF WORK. BASED ON THE
 SUBMITTED FLA COM REPORT ALONE THIS IS NOT PERMITTED AT
 THIS TIME. IT WAS THE UNDERSTANDING OF THIS REVIEWER
 BASED ON INFORMATION GIVEN THAT PHASE II WOULD BE UNDER
 SEPARATE PERMIT AND NOT A PHASED REVISION TO THE BASE
 PERMIT.
 THE REVIEW IS BEING DONE UNDER THE CODES STATED ON
 PLANS BASED ON REVISIONS SUBMITTED TO BASE PERMIT.
 ** THIS IS BEING NOTED AS THE INTENT AND SEQUENCE OF
 PERMITTING AND PHASING IS NOT CLEAR AT THIS TIME.
 ** IT IS IMPORTANT TO KNOW IF THE APPLIED SCOPE OF WORK
 IS TO BE UNDER NEW PERMIT AS IT IS UNDERSTOOD THIS
 WOULD PLACE PROJECT UNDER THE 2007 FBC WITH 2009
 REVISIONS ALONG WITH OTHER NEW ADOPTED CODES. THIS
 WOULD AFFECT CALCULATIONS AND SOME OTHER ITEMS ON
 PLANS.
  
 3) NOTE: PLEASE SUBMIT COMPLETE NEW LIGHTING
 PERFORMANCE CALCULATIONS PER 13-415.AB.5 (2007) OR
 13-415.2.ABC.1.1, .1.2, .1.3 FOR 2004
 THE INFORMATION SUBMITTED ON THE IDR, SUMMARY SHEETS,
 AND COVER SHEETS OF THE FLA COM DOES NOT COORDINATE
 WITH THE SUBMITTED PLANS. PLANS. SQ FT FOR THE ENTIRE
 REVISED PLAN NEEDS TO BE UPDATED.
 ONE EXAMPLE BESIDES THE ITEMS ABOVE IS THE PRO-SHOP
 ROOM. THE IDR DOES NOT COORDINATE WITH PLANS.
 ** KEEP IN MIND ALL FIXTURES SHALL BE SPECIFIC AT THIS
 TIME WITH ALL DETAILS. IF A FIXTURE HAS NOT YET BEEN
 DETERMINED THEN PLEASE FIND A FIXTURE WHICH MEET CODE
 COMPLIANCE AT THIS TIME. THE FIXTURE LEGEND MAY ALWAYS
 BE UPDATED AT A LATER DATE ALONG WITH THE CALCULATIONS.
 AS LONG AS PLANS AND CALCULATIONS MEET MINIMUM CODES
 FOR ISSUANCE ( IF UNDER SEPARATE PERMIT).
  
 4) NOTE: IF THE PROPOSED SCOPE OF WORK IS GOING TO BE A
 REVISION TO THE BASE PERMIT THE COMPLETE VALUE FOR THE
 COMPLETE SCOPE OF WORK IN PHASE ONE AND PHASE TWO NEEDS
 TO BE UPDATED. FBC 108.3. THE BASE VALUE HAS NOT BEEN
 INCREASED TO DATE.
 VALUE SHALL INCLUDE DESIGN COSTS, ALL LABOR, MATERIALS
 AND EQUIPMENT (PERMANENT) EVEN IF ANY OF THESE ITEMS
 ARE OWNER SUPPLIED. THE ORIGINAL APPLIED VALUE IS
 EXTREMELY LOW BASED ON THE SCOPE, EQUIPMENT ETC AND
 NEEDS TO BE ADJUSTED.
  
 5) NOTE: PLEASE SEE NOTES FROM ELECTRICAL REVIEW DATED
 4/17/2009. PLEASE COORDINATE ALL PLANS INCLUDING SITE
 LIGHTING, SITE PLANS ETC. PLEASE SEE COMMENTS FROM
 OTHER TRADES WHICH WILL AFFECT THE ELECTRICAL PLANS.
 ONE EXAMPLE ALONG IS THE LOCATION OF THE PROPOSED
 GENERATOR WHICH IS NOT PERMITTED.
  
 6) NOTE: PLEASE SUBMIT COMPLETE NEW PHOTO-METRICS FOR
 ALL EGRESS PATHS MEETING NFPA-101 7.8.1.3, 7.9.1.1,
 .1.2. PLEASE SEE 7.8.1.2.2 FOR ANY OCCUPANCY DEVICES
 USED FOR EGRESS LIGHTING. THERE ARE SEVERAL NEW
 INTERIOR STAIRS WHICH NEED TO BE UPDATED.
 **IMPORTANT, THE EXTERIOR EGRESS STAIRS SHALL ALSO
 COMPLY AS THIS IS ALSO REQUIRED TO THE RIGHT OF WAY.
 THE LANDING IS NOT THE RIGHT OF WAY.
 ** IMPORTANT, IF MEETING ANY EXCEPTIONS TO STAIR AREAS
 DURING PERFORMANCES THEN PLANS NEED TO PROVIDE MORE
 INFORMATION ON ALL LEVELS. NORMAL, EMERGENCY,
 PERFORMANCE ETC.
 ** KEEP IN MIND STAIR AREAS IN ELEVATED SEATING AREAS
 SHALL ALSO BE CONSIDERED.
  
 7) NOTE: PLEASE SEE ASME-17 UNDER THE 2004 EDITION FOR
 STATE ELEVATOR CODE REQUIREMENTS. THIS DEPARTMENT DOES
 NOT REVIEW FOR THESE ITEMS FOR CODE COMPLIANCE. HOWEVER
 THERE ARE ITEMS ON THE PLANS WHICH DO NOT APPEAR TO
 MEET SOME CHANGES IN THE ELEVATOR CODE. SEE NEW
 LIGHTING LEVELS REQUIRED FOR PITS, MACHINE ROOMS, SILLS
 ETC.
 ** THIS IS ONLY NOTED FOR INFORMATION. THIS IS NOT
 SOMETHING THAT WOULD WANT TO COME UP AT THE FINAL
 INSPECTION BY THE STATE ELEVATOR INSPECTOR.
  
 8) NOTE: PLEASE SEE SECTIONS 620.21-620.25. DEDICATE
 BRANCH CIRCUITS ARE REQUIRED FOR SEVERAL AREAS. ONE OF
 THE ITEMS SHOWN ON PLANS IS THE LIGHTING IN THE
 ELEVATOR EQUIPMENT ROOM WHICH IS NOT SHOWN ON A
 DEDICATED BRANCH CIRCUIT AS REQUIRED BY 620.23. KEEP IN
 MIND THE NOTE ABOVE WITH RESPECT TO THE ASME-17 CHANGES
 IN THE 2004 CODE. THE LIGHTING SHOWN WOULD NOT MEET NEW
 MINIMUMS.
  
 9) NOTE: PLEASE SEE 13-415.1.ABC.1.1,.1.2 AND .1.3 FOR
 INTERIOR LIGHTING CONTROLS. INTERIOR LIGHTING FOR ITEMS
 SUCH AS ACCENT LIGHTING SHALL HAVE SEPARATE CONTROLS.
 SEE SECTION .1.3.
 PLEASE SEE 2007 FBC IF PROJECT IS GOING TO BE UNDER
 SEPARATE PERMIT.
 NEED TO PROVIDE UPDATED ZONE PLANS FOR ALL LIGHTING
 CONTROLS AND SYSTEM. AS PHASE I IS NOT YET COMPLETED
 AND PHASE II WILL DIRECTLY AFFECT THE EXISTING SYSTEM
 ALL OF THESE ITEMS NEED TO BE UPDATED. THE ENTIRE BUILD
 OUT LCP SCHEDULE WITH ZONES NEEDS TO BE UPDATED.
  
 10) NOTE: PLEASE SEE 240.21C. A NOTE #1 ON THE
 TRANSFORMER SCHEDULE MENTIONS ALL PANEL BOARDS ON THE
 SECONDARY SIDE SHALL CONTAIN MAIN CIRCUIT BREAKERS.
 HOWEVER PLEASE SEE PANELS SW AND SE AS BOTH OF THESE
 INDICATE THESE PANELS A MAIN LUG ONLY. BOTH OF THESE
 PANELS NEED TO BE UPDATED.
  
 11) NOTE: PLEASE UPDATE FEEDERS ON THE SBA SWITCHBOARD
 FOR *H1B*.
 215.5,310.16 ETC
  
 12) NOTE: PLEASE ADJUST NOTE FOR TRANSFORMER GROUNDING
 ELECTRODE ATTACHMENT FOR ACTUAL ATTACHMENT LOCATION.
 250.20,250.30,250.50.
 PLEASE ADD NOTE TO PLANS FOR FRAMING BONDS PER FBC
 2704.1
  
 13) NOTE: PLEASE ADD NOTE FOR LIGHTING DISCONNECT
 REQUIRED PER 410.73G. THIS IS AT THE REQUEST OF
 INSPECTORS TO BE SHOWN ON PLANS AS THIS HAS BECOME A
 COMMON FAILURE ITEM IN THE FIELD.
  
 14) NOTE: PLEASE BE SURE THE LIGHTING AS NOTED ABOVE
 FOR ELEVATOR MACHINE ROOM IS UPDATED TO MEET 700.16
 ALSO. THE SINGLE FIXTURE AS SHOWN ONCE BURNT OUT OR NOT
 WORKING WOULD LEAVE THIS AREA IN TOTAL DARKNESS.
 PLEASE BE SURE OTHER AREAS ONCE UPDATED FOR EGRESS
 NOTES ABOVE ARE ALSO UPDATED.
  
 15) NOTE: PHASE I PLANS WOULD NEED TO BE UPDATED.
  
 ** AS THERE IS INFORMATION NOT YET SUBMITTED,
 DETERMINED OR COMPLETE, THERE MAY VERY WELL BE NEW
 COMMENTS WHICH CAN NOT YET BE MADE.
  
 ** PLANS ARE NO LONGER RELEASED PER NEW BUILDING
 OFFICIAL.
  
 16) NOTE: IT IS TO BE NOTED ONCE AGAIN PLANS STILL
 INDICATE A 3POLE ATS. THERE MAY BE A LOSS OF
 COORDINATION FROM NORMAL AND GENERATOR POWER TRANSFER.
 THIS IS NOTED ONLY AND DOES NOT VIOLATE CODE AS BACK UP
 IS STRICTLY OPTIONAL STAND-BY. THIS WILL REMAIN IN
 NOTES UNTIL COMPLETION OF PROJECT. THERE IS NO NEED FOR
 A RESPONSE BY DESIGNER.
  
 IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT
 TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO
 CONTACT THIS REVIEWER.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved