2008-12-28 11:54:21REVIEW #: 2ND
 ACTION: DENIED
  
 REVIEWED FOR COMPLIANCE WITH THE FOLLOWING:
 FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 NOTE: WHILE THIS IS THE SECOND PLAN REVIEW FOR PERMIT,
 THE EXTENT OF DESIGN CHANGES FROM PREVIOUS REVIEW
 (AREAS IDENTIFIED ON PLANS WITH CLOUDS AS HAVING BEEN
 CHANGED) MAKES IT NECESSARY TO REVIEW ALL SYSTEMS AND
 DESIGNS COMPLETELY.
  
 1. ONE SET OF ARCHITECTURAL AND LIFE SAFETY PLAN WERE
 NOT SEALED BY THE ARCHITECT. PLEASE PROVIDE PROPER
 SEAL, SIGNATURE, DATE AND TITLE BLOCK INFORMATION AS
 REQUIRED IN ACCORDANCE WITH FBC 106.1 AND FS 481.
  
 2. PAGE M-4: DETAIL FOR DUCT SMOKE DETECTOR SHOWS THE
 DETECTOR BEING INSTALLED IN THE RETURN AIR SYSTEM. DUCT
 SMOKE DETECTORS SHALL BE INSTALLED IN THE SUPPLY AIR
 SYSTEM IN ACCORDANCE WITH FBCM 606.2.1.
  
 3. PAGE M-2: THERE ARE MULTIPLE UNPROTECTED DUCT
 PENETRATIONS AND AIR TRANSFER OPENINGS SHOWN ON FLOOR
 PLANS AT FIRE RATED WALL PENETRATIONS. EXAMPLES ARE IN
 AREAS SUCH AS THE ADMINISTRATIVE OFFICES, RESTROOMS AND
 ZAMBONI STORAGE ROOM. ONE SET OF PLANS HAS BEEN
 MARKED-UP TO IDENTIFY THESE LOCATIONS. SHOW HOW ALL
 DUCT PENETRATIONS AND AIR TRANSFER OPENING AT RATED
 WALL ASSEMBLIES ARE TO BE PROTECTED IN ACCORDANCE WITH
 FBCM 607.5.
  
 4. PAGES M-1 AND M-2: FLOOR PLAN CALLS FOR RUSKIN MODEL
 #DFSDR1 ROUND FIRE/SMOKE DAMPER AT SEVERAL WALL
 PENETRATIONS. THIS DAMPER IS DESIGNED AND LISTED FOR
 USE AS A CEILING DAMPER AT PENETRATIONS OF HORIZONTAL
 ASSEMBLES SUCH AS TUNNEL CORRIDOR CEILINGS OR AT
 MEMBRANE PENETRATIONS OF FLOOR/CEILING ASSEMBLIES. THEY
 ARE NOT DESIGNED OR INTENDED TO BE INSTALLED AT
 VERTICAL WALL ASSEMBLIES. THERE ARE NO INSTALLATION
 INSTRUCTIONS FOR SUCH AN APPLICATION. FIRE DAMPERS,
 COMBINATION FIRE/SMOKE DAMPERS AND CEILING DAMPERS
 LOCATED WITHIN AIR DISTRIBUTION SHALL BE INSTALLED IN
 ACCORDANCE WITH THE REQUIREMENTS OF THIS SECTION, AND
 THE MANUFACTURER?S INSTALLATION INSTRUCTIONS AND
 LISTING PER FBCM 607.2. PLEASE INDICATE ON PLANS THE
 PROPER DAMPER FOR THE PROPER APPLICATION IN ACCORDANCE
 WITH THEIR LISTING AND THIS SECTION.
  
 5. PAGE M-2: FLOOR PLAN SHOWS AT LEAST ONE DUCT
 PENETRATION BEING PROTECTED BY A FIRE/SMOKE DAMPER
 WHERE NO RATED WALL ASSEMBLY IS SHOWN. AN EXAMPLE WOULD
 BE A 4 INCH ROUND FLEX DUCT PENETRATING A WALL NEAR THE
 LAUNDRY ROOM AT THE ADJACENT CLOSET. PLEASE CONFIRM
 THAT DAMPERS ARE ONLY SHOWN AT RATED WALL ASSEMBLIES IN
 ACCORDANCE WITH THEIR LISTING PER FBCM 607.2.
  
 6. PAGE M-2: FLOOR PLAN SHOWS A 4 INCH ROUND DRYER
 EXHAUST DUCT PENETRATING A RATED WALL ASSEMBLY WITH A
 FIRE/SMOKE DAMPER AT THE PENETRATION. FIRE DAMPERS,
 COMBINATION FIRE/SMOKE DAMPERS AND ANY SIMILAR DEVICES
 THAT WILL OBSTRUCT THE EXHAUST FLOW, SHALL BE
 PROHIBITED IN CLOTHES DRYER EXHAUST DUCTS IN ACCORDANCE
 WITH FBCM 504.2. THIS DUCT PENETRATION CAN BE PROTECTED
 WITH THE THROUGH-PENETRATION FIRESTOP DETAIL WHICH IS
 ALREADY SHOWN ON THE PLANS. PLEASE REMOVE THE DAMPER
 FROM THE PLANS AT THIS LOCATION AND CALL FOR THE
 THROUGH-PENETRATION FIRESTOP SYSTEM TO BE USED AT THIS
 LOCATION.
  
 7. PAGE M-2: FLOOR PLAN SHOWS SEVERAL FLEX DUCTS
 ATTACHING DIRECTLY TO THE FIRE/SMOKE DAMPERS. ACCESS
 DOORS ARE REQUIRED AT THESE LOCATIONS. PLEASE SHOW HOW
 DUCT ACCESS TO THESE DAMPERS IS TO BE PROVIDED IN
 ACCORDANCE WITH FBCM 607.4.
  
 8. PAGE M-2 SHOWS DRYER EXHAUST DUCT EXCEEDING 25 FEET
 IN LENGTH. SHOW HOW EXHAUST DUCT IS TO BE ROUTED AND
 TERMINATED WITH A DEVELOPED LENGTH OF 25 FEET OR LESS
 IN ACCORDANCE WITH FBCM 504.6.1.
 NOTE: THE EXCEPTION TO THIS SYSTEM ALLOWS THE USE OF
 DRYER MANUFACTURER?S INSTALLATION INSTRUCTIONS TO ALLOW
 LENGTHS IN EXCESS OF 25 FEET. DRYER MANUFACTURER?S
 INSTRUCTIONS MAY BE PROVIDED TO DEMONSTRATE COMPLIANCE
 WITH THIS SECTION.
  
 9. PAGE M-2 INDICATES THAT EXHAUST FANS IN THE
 REFRIGERATION MACHINERY ROOM WILL ONLY OPERATE AT FULL
 SPEED UNDER EMERGENCY CONDITIONS. MECHANICAL
 VENTILATION SHALL BE CAPABLE OF EXHAUSTING THE MINIMUM
 QUANTITY OF AIR BOTH AT NORMAL OPERATING AND EMERGENCY
 CONDITIONS IN ACCORDANCE WITH FBCM 1105.6. PLEASE SHOW
 HOW THE REQUIRED MINIMUM VENTILATION RATE OF NOT LESS
 THAN 0.5 CFM PER SQUARE FOOT IS TO BE ACHIEVED IN THE
 REFRIGERATION MACHINERY ROOM IN ACCORDANCE WITH FBCM
 1105.6.3.
  
 10. PAGE M-1: AIR BALANCE SCHEDULE CALLS FOR 9000 CFM
 MAKEUP AIR UNIT. NO INFORMATION COULD BE FOUND ON
 PLANS, EQUIPMENT SCHEDULE OR ENERGY CALCULATIONS FOR
 THIS UNIT. PLEASE PROVIDE LOCATION, INSTALLATION
 DETAIL, INFORMATION ON EQUIPMENT SCHEDULE AND ALL
 RELEVANT INFORMATION ON PLANS AND IN ENERGY
 CALCULATIONS IN ACCORDANCE WITH FBCB 106.1.1, FBCM
 304.1 AND FBCB 13-100.2.
  
 11. PAGE M-5: NOTE 3B.3 AND 3B.4 CALL FOR EXTERIOR
 DUCTWORK ASSOCIATED WITH THE ABOVE MENTIONED MAKEUP AIR
 UNIT. NO SUCH DUCTWORK OR AIR DISTRIBUTION SYSTEM IS
 SHOWN ON PLANS. PLEASE SHOW ALL AIR DISTRIBUTION
 SYSTEMS ON THE PLANS TO DEMONSTRATE COMPLIANCE WITH
 FBCM 603.1. ALSO, PROVIDE INSTALLATION DETAIL AS
 INDICATED IN THE NOTE WITH WIND RESISTANCE INFORMATION
 IN ACCORDANCE WITH FBCM 301.13. ALSO, THIS SECTION
 REQUIRES ALL APPLIANCES AND EQUIPMENT EXPOSED TO WIND
 BE DESIGNED TO RESIST WIND PRESSURES. PROVIDE
 MANUFACTURER?S DATA SHOWING ALL OUTDOOR APPLIANCES ARE
 DESIGNED TO RESIST WIND PRESSURES IN ACCORDANCE WITH
 THIS SECTION.
  
 12. PAGE M-3: CONDENSATE TRAP DETAIL SHOWS A SECONDARY
 DRAIN FROM AN AUXILIARY DRAIN PAN. THIS DETAIL CALLS
 FOR THE SECONDARY DRAIN TO BE ROUTED TO THE ?NEAREST
 WET COLUMN.? IF A SECONDARY DRAIN IS USED, IT SHALL
 DISCHARGE TO A CONSPICUOUS POINT OF DISPOSAL TO ALERT
 OCCUPANTS IN THE EVENT OF A STOPPAGE OF THE PRIMARY
 DRAIN IN ACCORDANCE WITH FBCM 307.2.3(1). THE DETAIL
 ALSO SHOWS A FLOAT SWITCH IN THE AUXILIARY DRAIN PAN.
 THE USE OF A WATER LEVEL DETECTION DEVICE IN THE
 AUXILIARY PAN MAY BE USED IN LIEU OF THE SECONDARY
 DRAIN PER FBCM 307.2.3(3), MAKING THE SECONDARY DRAIN
 LINE UNNECESSARY. PLEASE CLARIFY THE TYPE OF AUXILIARY
 DRAIN PROTECTION TO BE USED AT THE AHUS.
  
 13. THE AREA OF THE SCOPE OF WORK ON PLANS INCLUDES AN
 UNFINISHED SHELL SPACE. THIS SPACE SHALL BE INCLUDED IN
 THE METHOD C ENERGY CALCULATIONS. ALL ASSUMPTIONS MADE
 ABOUT FEATURES NOT INSTALLED UNTIL LATER THAT ARE NOT
 ON THE BUILDING PLANS SHALL BE LISTED AND APPENDED TO
 THE COMPLIANCE FORM SUBMITTED TO THE BUILDING
 DEPARTMENT IN ACCORDANCE WITH FBCB 13-101.1.6. ALSO,
 COOLING LOAD CALCULATIONS OR A SYSTEM SIZING SUMMARY
 SHALL BE APPENDED TO THE ENERGY CALCULATIONS IN
 ACCORDANCE WITH FBCB 13-407.1.ABC.1.
 NOTE: IF A SYSTEM SIZING SUMMARY IS PROVIDED, IT SHALL
 BE SIGNED AND SEALED BY THE DESIGN PROFESSIONAL IN
 ACCORDANCE WITH THIS SECTION.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved