| Date |
Text |
| 2008-12-28 11:54:21 | REVIEW #: 2ND |
| | ACTION: DENIED |
| | |
| | REVIEWED FOR COMPLIANCE WITH THE FOLLOWING: |
| | FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS |
| | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | NOTE: WHILE THIS IS THE SECOND PLAN REVIEW FOR PERMIT, |
| | THE EXTENT OF DESIGN CHANGES FROM PREVIOUS REVIEW |
| | (AREAS IDENTIFIED ON PLANS WITH CLOUDS AS HAVING BEEN |
| | CHANGED) MAKES IT NECESSARY TO REVIEW ALL SYSTEMS AND |
| | DESIGNS COMPLETELY. |
| | |
| | 1. ONE SET OF ARCHITECTURAL AND LIFE SAFETY PLAN WERE |
| | NOT SEALED BY THE ARCHITECT. PLEASE PROVIDE PROPER |
| | SEAL, SIGNATURE, DATE AND TITLE BLOCK INFORMATION AS |
| | REQUIRED IN ACCORDANCE WITH FBC 106.1 AND FS 481. |
| | |
| | 2. PAGE M-4: DETAIL FOR DUCT SMOKE DETECTOR SHOWS THE |
| | DETECTOR BEING INSTALLED IN THE RETURN AIR SYSTEM. DUCT |
| | SMOKE DETECTORS SHALL BE INSTALLED IN THE SUPPLY AIR |
| | SYSTEM IN ACCORDANCE WITH FBCM 606.2.1. |
| | |
| | 3. PAGE M-2: THERE ARE MULTIPLE UNPROTECTED DUCT |
| | PENETRATIONS AND AIR TRANSFER OPENINGS SHOWN ON FLOOR |
| | PLANS AT FIRE RATED WALL PENETRATIONS. EXAMPLES ARE IN |
| | AREAS SUCH AS THE ADMINISTRATIVE OFFICES, RESTROOMS AND |
| | ZAMBONI STORAGE ROOM. ONE SET OF PLANS HAS BEEN |
| | MARKED-UP TO IDENTIFY THESE LOCATIONS. SHOW HOW ALL |
| | DUCT PENETRATIONS AND AIR TRANSFER OPENING AT RATED |
| | WALL ASSEMBLIES ARE TO BE PROTECTED IN ACCORDANCE WITH |
| | FBCM 607.5. |
| | |
| | 4. PAGES M-1 AND M-2: FLOOR PLAN CALLS FOR RUSKIN MODEL |
| | #DFSDR1 ROUND FIRE/SMOKE DAMPER AT SEVERAL WALL |
| | PENETRATIONS. THIS DAMPER IS DESIGNED AND LISTED FOR |
| | USE AS A CEILING DAMPER AT PENETRATIONS OF HORIZONTAL |
| | ASSEMBLES SUCH AS TUNNEL CORRIDOR CEILINGS OR AT |
| | MEMBRANE PENETRATIONS OF FLOOR/CEILING ASSEMBLIES. THEY |
| | ARE NOT DESIGNED OR INTENDED TO BE INSTALLED AT |
| | VERTICAL WALL ASSEMBLIES. THERE ARE NO INSTALLATION |
| | INSTRUCTIONS FOR SUCH AN APPLICATION. FIRE DAMPERS, |
| | COMBINATION FIRE/SMOKE DAMPERS AND CEILING DAMPERS |
| | LOCATED WITHIN AIR DISTRIBUTION SHALL BE INSTALLED IN |
| | ACCORDANCE WITH THE REQUIREMENTS OF THIS SECTION, AND |
| | THE MANUFACTURER?S INSTALLATION INSTRUCTIONS AND |
| | LISTING PER FBCM 607.2. PLEASE INDICATE ON PLANS THE |
| | PROPER DAMPER FOR THE PROPER APPLICATION IN ACCORDANCE |
| | WITH THEIR LISTING AND THIS SECTION. |
| | |
| | 5. PAGE M-2: FLOOR PLAN SHOWS AT LEAST ONE DUCT |
| | PENETRATION BEING PROTECTED BY A FIRE/SMOKE DAMPER |
| | WHERE NO RATED WALL ASSEMBLY IS SHOWN. AN EXAMPLE WOULD |
| | BE A 4 INCH ROUND FLEX DUCT PENETRATING A WALL NEAR THE |
| | LAUNDRY ROOM AT THE ADJACENT CLOSET. PLEASE CONFIRM |
| | THAT DAMPERS ARE ONLY SHOWN AT RATED WALL ASSEMBLIES IN |
| | ACCORDANCE WITH THEIR LISTING PER FBCM 607.2. |
| | |
| | 6. PAGE M-2: FLOOR PLAN SHOWS A 4 INCH ROUND DRYER |
| | EXHAUST DUCT PENETRATING A RATED WALL ASSEMBLY WITH A |
| | FIRE/SMOKE DAMPER AT THE PENETRATION. FIRE DAMPERS, |
| | COMBINATION FIRE/SMOKE DAMPERS AND ANY SIMILAR DEVICES |
| | THAT WILL OBSTRUCT THE EXHAUST FLOW, SHALL BE |
| | PROHIBITED IN CLOTHES DRYER EXHAUST DUCTS IN ACCORDANCE |
| | WITH FBCM 504.2. THIS DUCT PENETRATION CAN BE PROTECTED |
| | WITH THE THROUGH-PENETRATION FIRESTOP DETAIL WHICH IS |
| | ALREADY SHOWN ON THE PLANS. PLEASE REMOVE THE DAMPER |
| | FROM THE PLANS AT THIS LOCATION AND CALL FOR THE |
| | THROUGH-PENETRATION FIRESTOP SYSTEM TO BE USED AT THIS |
| | LOCATION. |
| | |
| | 7. PAGE M-2: FLOOR PLAN SHOWS SEVERAL FLEX DUCTS |
| | ATTACHING DIRECTLY TO THE FIRE/SMOKE DAMPERS. ACCESS |
| | DOORS ARE REQUIRED AT THESE LOCATIONS. PLEASE SHOW HOW |
| | DUCT ACCESS TO THESE DAMPERS IS TO BE PROVIDED IN |
| | ACCORDANCE WITH FBCM 607.4. |
| | |
| | 8. PAGE M-2 SHOWS DRYER EXHAUST DUCT EXCEEDING 25 FEET |
| | IN LENGTH. SHOW HOW EXHAUST DUCT IS TO BE ROUTED AND |
| | TERMINATED WITH A DEVELOPED LENGTH OF 25 FEET OR LESS |
| | IN ACCORDANCE WITH FBCM 504.6.1. |
| | NOTE: THE EXCEPTION TO THIS SYSTEM ALLOWS THE USE OF |
| | DRYER MANUFACTURER?S INSTALLATION INSTRUCTIONS TO ALLOW |
| | LENGTHS IN EXCESS OF 25 FEET. DRYER MANUFACTURER?S |
| | INSTRUCTIONS MAY BE PROVIDED TO DEMONSTRATE COMPLIANCE |
| | WITH THIS SECTION. |
| | |
| | 9. PAGE M-2 INDICATES THAT EXHAUST FANS IN THE |
| | REFRIGERATION MACHINERY ROOM WILL ONLY OPERATE AT FULL |
| | SPEED UNDER EMERGENCY CONDITIONS. MECHANICAL |
| | VENTILATION SHALL BE CAPABLE OF EXHAUSTING THE MINIMUM |
| | QUANTITY OF AIR BOTH AT NORMAL OPERATING AND EMERGENCY |
| | CONDITIONS IN ACCORDANCE WITH FBCM 1105.6. PLEASE SHOW |
| | HOW THE REQUIRED MINIMUM VENTILATION RATE OF NOT LESS |
| | THAN 0.5 CFM PER SQUARE FOOT IS TO BE ACHIEVED IN THE |
| | REFRIGERATION MACHINERY ROOM IN ACCORDANCE WITH FBCM |
| | 1105.6.3. |
| | |
| | 10. PAGE M-1: AIR BALANCE SCHEDULE CALLS FOR 9000 CFM |
| | MAKEUP AIR UNIT. NO INFORMATION COULD BE FOUND ON |
| | PLANS, EQUIPMENT SCHEDULE OR ENERGY CALCULATIONS FOR |
| | THIS UNIT. PLEASE PROVIDE LOCATION, INSTALLATION |
| | DETAIL, INFORMATION ON EQUIPMENT SCHEDULE AND ALL |
| | RELEVANT INFORMATION ON PLANS AND IN ENERGY |
| | CALCULATIONS IN ACCORDANCE WITH FBCB 106.1.1, FBCM |
| | 304.1 AND FBCB 13-100.2. |
| | |
| | 11. PAGE M-5: NOTE 3B.3 AND 3B.4 CALL FOR EXTERIOR |
| | DUCTWORK ASSOCIATED WITH THE ABOVE MENTIONED MAKEUP AIR |
| | UNIT. NO SUCH DUCTWORK OR AIR DISTRIBUTION SYSTEM IS |
| | SHOWN ON PLANS. PLEASE SHOW ALL AIR DISTRIBUTION |
| | SYSTEMS ON THE PLANS TO DEMONSTRATE COMPLIANCE WITH |
| | FBCM 603.1. ALSO, PROVIDE INSTALLATION DETAIL AS |
| | INDICATED IN THE NOTE WITH WIND RESISTANCE INFORMATION |
| | IN ACCORDANCE WITH FBCM 301.13. ALSO, THIS SECTION |
| | REQUIRES ALL APPLIANCES AND EQUIPMENT EXPOSED TO WIND |
| | BE DESIGNED TO RESIST WIND PRESSURES. PROVIDE |
| | MANUFACTURER?S DATA SHOWING ALL OUTDOOR APPLIANCES ARE |
| | DESIGNED TO RESIST WIND PRESSURES IN ACCORDANCE WITH |
| | THIS SECTION. |
| | |
| | 12. PAGE M-3: CONDENSATE TRAP DETAIL SHOWS A SECONDARY |
| | DRAIN FROM AN AUXILIARY DRAIN PAN. THIS DETAIL CALLS |
| | FOR THE SECONDARY DRAIN TO BE ROUTED TO THE ?NEAREST |
| | WET COLUMN.? IF A SECONDARY DRAIN IS USED, IT SHALL |
| | DISCHARGE TO A CONSPICUOUS POINT OF DISPOSAL TO ALERT |
| | OCCUPANTS IN THE EVENT OF A STOPPAGE OF THE PRIMARY |
| | DRAIN IN ACCORDANCE WITH FBCM 307.2.3(1). THE DETAIL |
| | ALSO SHOWS A FLOAT SWITCH IN THE AUXILIARY DRAIN PAN. |
| | THE USE OF A WATER LEVEL DETECTION DEVICE IN THE |
| | AUXILIARY PAN MAY BE USED IN LIEU OF THE SECONDARY |
| | DRAIN PER FBCM 307.2.3(3), MAKING THE SECONDARY DRAIN |
| | LINE UNNECESSARY. PLEASE CLARIFY THE TYPE OF AUXILIARY |
| | DRAIN PROTECTION TO BE USED AT THE AHUS. |
| | |
| | 13. THE AREA OF THE SCOPE OF WORK ON PLANS INCLUDES AN |
| | UNFINISHED SHELL SPACE. THIS SPACE SHALL BE INCLUDED IN |
| | THE METHOD C ENERGY CALCULATIONS. ALL ASSUMPTIONS MADE |
| | ABOUT FEATURES NOT INSTALLED UNTIL LATER THAT ARE NOT |
| | ON THE BUILDING PLANS SHALL BE LISTED AND APPENDED TO |
| | THE COMPLIANCE FORM SUBMITTED TO THE BUILDING |
| | DEPARTMENT IN ACCORDANCE WITH FBCB 13-101.1.6. ALSO, |
| | COOLING LOAD CALCULATIONS OR A SYSTEM SIZING SUMMARY |
| | SHALL BE APPENDED TO THE ENERGY CALCULATIONS IN |
| | ACCORDANCE WITH FBCB 13-407.1.ABC.1. |
| | NOTE: IF A SYSTEM SIZING SUMMARY IS PROVIDED, IT SHALL |
| | BE SIGNED AND SEALED BY THE DESIGN PROFESSIONAL IN |
| | ACCORDANCE WITH THIS SECTION. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| | RONALD J. REGUEIRO |
| | 561.805.6719 |
| | [email protected] |