| 2008-10-01 14:22:54 | DENIED |
| | REFERENCE: FBC-2004 FUEL GAS |
| | FLORIDA ADMINISTRATIVE CODE |
| | FLORIDA STATUTES |
| | |
| | 1. ALL SHEETS WITH ROCAMAR ENGINEERING SERVICES INC. |
| | TITLE BLOCK. THE ADDRESS ON THE TITLE BLOCK DOES NOT |
| | REFLECT THE ADDRESS OF RECORD ON THE STATE OF FLORIDA |
| | DBPR WEBSITE. (SEE ATTACHED SHEET). PLEASE UPDATE THE |
| | TITLE BLOCKS OR THE DBPR WEBSITE PRIOR TO RESUBMITTING |
| | FOR REVIEW SO THE ADDRESS CORRELATES. FAC |
| | 61G15-23.002(2) & FS 471.025. |
| | |
| | 2. SHT P-1 SHOWS THE GAS LINE TO THE EMERGENCY |
| | GENERATOR. THE NOTE INDICATES 20 PSI REQUIRED. PLEASE |
| | CLARIFY. SUBMIT MANUF. SPECIFICATION SHEETS AS WELL AS |
| | INSTALLATION SHEETS FOR THE GENERATOR SHOWING A LISTING |
| | FOR THE GENERATOR, INLET PRESSURE & BTU LOAD FOR THE |
| | GENERATOR. SEPARATE GENERATOR PERMIT REQUIRED. FBC-2004 |
| | FUEL GAS DOES NOT HAVE A TABLE FOR 20 PSI. PLEASE |
| | SUBMIT AN APPROVED GAS PIPE SIZING TABLE FOR 20 PSI. |
| | SECTION 402. |
| | |
| | 3. SHT P-5 THE GAS PIPING, (1-1/2") TO THE GENERATOR |
| | DOES NOT REFLECT THE GAS PIPING SIZE INDICATED ON SHT |
| | P-1, (1"). PLEASE CORRELATE. SECTION 402. |
| | |
| | 4. SHT P-5 SEPARATE GAS PERMIT IS REQUIRED. PLEASE |
| | SUBMIT THE FOLLOWING INFORMATION FOR EACH GAS SYSTEM: |
| | |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. (PIPE LENGTHS NOT INDICATED). |
| | |
| | B. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE IF BEING USED. |
| | |
| | C. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4). |
| | |
| | D. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. (20 PSI ON SHT P-1 |
| | BUT .5 PSI ON SHT P-5) CLARIFY EACH SYSTEM. |
| | |
| | E. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2. |
| | |
| | **PLEASE SHOW "GAS PIPING SIZED ON FOLLOWING" FOR EACH |
| | METER/SYSTEM. |
| | |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| | WITH A DESCRIPTION OF THE REVISION MADE, |
| | IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE |
| | ALL VOID SHEETS FROM ALL PLANS AND PLACE |
| | ONE SET OF THEM LOOSELY ON TOP OF THE |
| | COLLATED PLANS TO BE REVIEWED. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | |