| Date |
Text |
| 2008-09-19 13:53:26 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | FBC-2004 FUEL GAS |
| | CITY WPB MUNICIPAL CODE |
| | |
| | 1. SHT A0-1 SHOWS A NEW GREASE INTERCEPTOR. THE GREASE |
| | INTERCEPTOR SHALL BE SIZED BY THE UTILITY DEPT, |
| | INDUSTRIAL PRETREATMENT DIVISION. PLEASE CONTACT MR. |
| | WILLIAM ROBERTS ENVIRONMENTAL COMPLIANCE AT (561) |
| | 822-2272, FAX (561) 659-7458 OR E-MAIL |
| | [email protected]. ARTICLE III SECTION 90-124. |
| | |
| | 2. SHT A0-1A DEMOLITION PLAN. PER SECTION 704.5 IN THE |
| | REMOVAL OF ANY PART OF A DRAINAGE SYSTEM, DEAD ENDS ARE |
| | PROHIBITED. ALL DEMO'D - CAPPED PIPING SHALL REMAIN |
| | UNCOVERED UNTIL INSPECTED BY THE FIELD INSPECTOR. |
| | |
| | 3. SHT A-1 CODE STANDARDS SHALL INCLUDE THE 2007 |
| | REVISIONS. |
| | |
| | 4. SHT P-1 THE 3 COMPARTMENT SINK DETAIL SHOWS THE AIR |
| | GAP AS 3". PER SECTION 802.2.1 THE MINIMUM AIR GAP IS |
| | TWICE THE EFFECTIVE OPENING OF THE INDIRECT PIPING. THE |
| | INDIRECT PIPING IS INDICATED AS 2". THE MINIMUM AIR GAP |
| | REQUIRED IS 4". |
| | |
| | 5. SHT P-2 SANITARY RISER DIAGRAM, THE FLOOR DRAIN IN |
| | THE TOILET ROOM IS NOT VENTED AS INDICATED. SECTION |
| | 901.2.1. THE FLOOR DRAIN SHOULD BE CONNECTED TO THE LAV |
| | RISER. -- SHOW THE PIPE SIZES FOR THE TOILET FIXTURES, |
| | (W/C & FLOOR DRAIN). TABLES 709.1 & 710.1(1)(2). |
| | |
| | 6. SHT P-2 SANITARY RISER DIAGRAM, THE PIPING TO THE |
| | URINAL IS AN "S" TRAP WHICH IS NOT APPROVED. SECTION |
| | 1002.3. PLEASE SHOW THE DRAIN LINE FROM THE URINAL |
| | CONNECTING STRAIGHT INTO THE STACK WITHOUT THE VERTICAL |
| | DROP AS INDICATED ON THE RISER. (SEE RED LINE |
| | CORRECTION ON ONE SET OF PLANS). |
| | |
| | 7. SHT P-2 SANITARY RISER DIAGRAM, CLEANOUTS ARE |
| | REQUIRED NEAR THE JUNCTION OF THE BUILDING DRAIN AND |
| | THE BUILDING SEWER PER SECTION 708.3.5. -- ALSO TWO WAY |
| | CLEANOUTS ARE REQUIRED AT THE AFFLUENT PIPING & THE |
| | EFFLUENT PIPING OF THE GREASE INTERCEPTOR PER UTILITY |
| | STANDARD FOR GREASE INTERCEPTORS. |
| | |
| | 8. SHT P-2 WATER ISOMETRIC RISER DIAGRAM. A WATER |
| | HAMMER ARRESTOR IS REQUIRED ON THE SUPPLY PIPE FOR THE |
| | ICE MAKER INSTALLED NEAR THE FIXTURE IN AN EFFECTIVE |
| | RANGE PER PDI-HW 201. PLEASE SHOW ON RISER DIAGRAM. |
| | SECTION 604.9. |
| | |
| | 9. SHT P-1 INDICATES GAS PIPING NOTES. A SEPARATE GAS |
| | PERMIT IS REQUIRED. THE FOLLOWING INFORMATION IS |
| | REQUIRED TO BE SUBMITTED: |
| | |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. |
| | |
| | B. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. |
| | |
| | C. TYPE OF GAS, (LP OR NATURAL). |
| | |
| | D. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2004 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.6.1 AND TABLES 402.4(1) THRU |
| | 402.4(33). |
| | |
| | E. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4). |
| | |
| | F. SUBMIT CALCULATIONS FOR COMBUSTION |
| | AIR (IF APPLICABLE) PER FBC-2004 FUEL |
| | GAS CODE SECTION 304. |
| | |
| | G. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | |
| | H. SUBMIT A DETAIL SHOWING THE TYPE, |
| | LOCATION, SIZE AND TERMINATION OF THE |
| | GAS VENTS PER FBC-2004 FUEL GAS CODE |
| | SECS. 502 THRU 505. |
| | |
| | I. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2. |
| | |
| | J. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | |
| | K. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND |
| | APPURTENANCES PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | |
| | L. EMERGENCY HOOD SHUT DOWN SHUT OFF |
| | VALVE TO BE BELOW CEILING. MANUAL SHUT |
| | OFF VALVE TO BE UPSTREAM. UNION TO BE |
| | DOWN STREAM OF MANUAL VALVE. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| | WITH A DESCRIPTION OF THE REVISION MADE, |
| | IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE |
| | ALL VOID SHEETS FROM ALL PLANS AND PLACE |
| | ONE SET OF THEM LOOSELY ON TOP OF THE |
| | COLLATED PLANS TO BE REVIEWED. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | |