| Date |
Text |
| 2008-09-29 14:01:26 | REVIEW #: 1ST |
| | ACTION: DENIED |
| | |
| | FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS |
| | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | 1. PAGE M-1 FLOOR PLAN SHOWS DUCT SMOKE DETECTORS ON |
| | THE RETURN SIDE OF AHU 1 AND AHU 2. DUCT DETECTORS |
| | SHALL BE ON THE SUPPLY SIDE OF THE FANS IN ACCORDANCE |
| | WITH FBCM 606.2.1. |
| | |
| | 2. OUTSIDE AIR INTAKES FOR AHU-1 AND AHU-2 SHALL BE |
| | PROVIDED WITH SHUTOFF DAMPER CONTROLS IN ACCORDANCE |
| | WITH FBCB 13-409.1.ABC.3.3. |
| | |
| | 3. PLAN SHOWS SECONDARY DRAIN LINES FROM AHU-1 AND |
| | AHU-2 TO TERMINATE AT SOFFIT ON EAST SIDE OF BUILDING. |
| | THIS DOES NOT APPEAR TO BE A CONSPICUOUS LOCATION. THE |
| | AUXILIARY PAN DRAIN SHALL DISCHARGE TO A CONSPICUOUS |
| | POINT OF DISPOSAL TO ALERT OCCUPANTS IN THE EVENT OF A |
| | STOPPAGE OF THE PRIMARY DRAIN IN ACCORDANCE WITH FBCM |
| | 307.2.3(1). |
| | |
| | 4. HVAC SPECIFICATION #19 CALLS FOR CONDENSATE DISPOSAL |
| | AT ROOF DRAINS WHILE FLOOR PLAN CALLS FOR A DRYWELL. |
| | PLEASE COORDINATE FLOOR PLANS WITH SPECIFICATIONS TO |
| | ACCURATELY REFLECT THE SCOPE OF WORK IN ACCORDANCE WITH |
| | FBCB 106.1.1. CONDENSATE FROM ALL COOLING COILS AND |
| | EVAPORATORS SHALL BE CONVEYED FROM THE DRAIN PAN OUTLET |
| | TO AN APPROVED PLACE OF DISPOSAL IN ACCORDANCE WITH |
| | BFCM 307.2.1. |
| | |
| | 5. NO INSTALLATION DETAILS PROVIDED IN PLANS. PROVIDE |
| | DETAILED INSTALLATION INSTRUCTIONS FOR ALL MECHANICAL |
| | EQUIPMENT AND APPLIANCES WHICH ARE TO BE INSTALLED |
| | OUTDOORS. ALSO INCLUDE SUPPORTING DOCUMENTATION FOR |
| | WIND RESISTANCE. MECHANICAL EQUIPMENT, APPLIANCES AND |
| | SUPPORTS THAT ARE EXPOSED TO WIND SHALL BE DESIGNED AND |
| | INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT |
| | AND THE SUPPORTS AS DETERMINED IN ACCORDANCE WITH FBCM |
| | 301.13. ALSO REQUIRED IS DATA FROM ALL OUTDOOR |
| | APPLIANCE MANUFACTURERS SHOWING THEIR APPLIANCES ARE |
| | DESIGNED AND CONSTRUCTED TO RESIST WIND PRESSURES IN |
| | ACCORDANCE WITH THIS SECTION. THIS INCLUDES ALL |
| | CONDENSING UNITS AND HOOD EXHAUST/MAKE-UP AIR FANS. |
| | |
| | 6. NO INFORMATION WAS PROVIDED WITH THESE PLANS RELATED |
| | TO THE COMMERCIAL KITCHEN HOOD SYSTEM. PROVIDE SEPARATE |
| | PLANS AND PERMIT APPLICATIONS FOR EACH OF THE FOLLOWING |
| | SYSTEMS. SEPARATE PERMITS ARE REQUIRED FOR THE |
| | FOLLOWING: HOODS, HOOD SUPPRESSION SYSTEMS, WALK-IN |
| | COOLERS. NO PORTIONS OF HOOD OR WALK-IN COOLER SYSTEMS |
| | HAVE BEEN REVIEWED FOR CODE COMPLIANCE AT THIS TIME. |
| | |
| | 7. AHU-1 AND AHU-2 DO NOT APPEAR, BASED ON THE FLOOR |
| | PLANS, TO BE FULLY ACCESSIBLE FOR SERVICE AND |
| | REPLACEMENT. CLEARANCES AROUND APPLIANCES TO ELEMENTS |
| | OF PERMANENT CONSTRUCTION, INCLUDING OTHER INSTALLED |
| | EQUIPMENT AND APPLIANCES, SHALL BE SUFFICIENT TO ALLOW |
| | INSPECTIONS, SERVICE, REPAIR OR REPLACEMENT WITHOUT |
| | REMOVING SUCH ELEMENTS OF PERMANENT CONSTRUCTION IN |
| | ACCORDANCE WITH FBCM 306.1. PLEASE SHOW HOW THESE |
| | APPLIANCES ARE TO BE ACCESSED FOR SERVICE AND/OR |
| | REPLACEMENT. |
| | |
| | 8. ENERGY CALCULATIONS: A SYSTEM SIZING SUMMARY HAS |
| | BEEN PROVIDED IN LIEU OF COOLING LOAD CALCULATIONS AS |
| | ALLOWED UNDER FBCB 13-407.1.ABC.1, EXCEPTION #1. THE |
| | SYSTEM SIZING SUMMARY SHALL BE SIGNED AND SEALED BY THE |
| | DESIGNER OF RECORD IN ACCORDANCE WITH THIS EXCEPTION. |
| | NOTE: MECHANICAL ONLY REVIEWS FOR MECHANICAL PORTIONS |
| | OF THE ENERGY CALCULATIONS. PLEASE SEE OTHER TRADE |
| | REVIEWS FOR POSSIBLE ADDITIONAL ENERGY CODE RELATED |
| | COMMENTS. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| | RONALD J. REGUEIRO |
| | 561.805.6719 |
| | [email protected] |