| Date |
Text |
| 2008-09-22 14:36:14 | REVIEW #: 1ST |
| | ACTION: DENIED |
| | |
| | FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS |
| | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | 1. PAGE M2.1: THE CEILING MOUNTED EXHAUST FAN IN BATH |
| | ROOM 1027 WILL CREATE A POSITIVELY PRESSURIZED EXHAUST |
| | DUCT IN THE PLENUM CEILING. EXHAUST DUCTS UNDER |
| | POSITIVE PRESSURE SHALL NOT EXTEND INTO OR PASS THROUGH |
| | DUCTS OR PLENUMS IN ACCORDANCE WITH FBCM 601.3. |
| | |
| | 2. PAGE M2.1: THE 4 INCH ROUND EXHAUST DUCT FROM BATH |
| | ROOM 1027 APPEARS TO BE PENETRATING AN EXISTING |
| | FIRE-RESISTANCE RATED WALL ASSEMBLY BASED ON THE |
| | PRESENCE OF FIRE DAMPERS IN OTHER DUCT PENETRATIONS OF |
| | THE SAME WALL. SHOW HOW THIS PENETRATION IS TO BE |
| | PROTECTED IN ACCORDANCE WITH FBCM 607.1. |
| | |
| | 3. PAGE M2.1: HP-1 FOR THE IT ROOM HAS A SUPPLY FAN IN |
| | EXCESS OF 2000 CFM AND THEREFORE REQUIRES SHUT-DOWN BY |
| | SMOKE DETECTOR IN ACCORDANCE WITH FBCM 606.2. DUCT |
| | MOUNTED SMOKE DETECTORS SHALL BE CONNECTED TO THE |
| | BUILDING FIRE ALARM SYSTEM IN ACCORDANCE WITH FBCM |
| | 606.4.1. |
| | |
| | 4. PAGE M2.1: WHAT IS THE RETURN AIR CAPACITY OF THE |
| | TITUS MLR-39 LINEAR RETURN GRILLS USED IN THE PERIMETER |
| | OFFICE APPLICATIONS? THE SCHEDULE ON PAGE M6.1 GIVES NO |
| | VALUES FOR THE LINEAR RETURN GRILLS. SHOW HOW BALANCED |
| | RETURN IS TO BE ACHIEVED IN THESE AREAS IN ACCORDANCE |
| | WITH FBCM 601.4. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| | RONALD J. REGUEIRO |
| | 561.805.6719 |
| | [email protected] |