| 2008-09-15 15:27:18 | PLUMBING PLAN REVIEW: |
| | DENIED: |
| | |
| | PLAN REVIEW UNDER THE 2004 FLORIDA BUILDING CODES WITH |
| | 2007 REVISIONS, CITY OF WEST PALM BEACH AMENDMENTS TO |
| | CHAPTER 1 (W.P.B.), FLORIDA ADMINISTRATIVE CODE |
| | (F.A.C.), AND FLORIDA STATUTES (F.S.). |
| | |
| | THE FOLLOWING CORRECTIONS/INFORMATION ARE REQUIRED FOR |
| | PLUMBING PLAN REVIEW TO MEET CODE COMPLIANCE. |
| | |
| | 1. DECLARE THE GOVERNING CODE. (FBC-2004 WITH 2007 |
| | REVISIONS). PER (W.P.B. AS AMENDED) SECTION 106.5 |
| | RETENTION OF CONSTRUCTION DOCUMENTS. |
| | |
| | 2. SHEET 1 OF 2, NOTES #12 INDICATES THAT THE KITCHEN |
| | CABINETS AND COUNTER TOPS ARE BEING REPLACED, HOWEVER |
| | THERE IS NO INDICATION OF THE SINK BEING REPLACED. |
| | PLEASE CLARIFY IF THE EXISTING SINK IS BEING REUSED OR |
| | IF A NEW ONE IS BEING INSTALLED.PER FBC-2004 PLUMBING |
| | SECTION 401.1 SCOPE. |
| | |
| | 3. SHEET 2 OF 3, SANITARY PLUMBING RISER: PLEASE |
| | CORRECT THE FOLLOWING PER THE FBC-2004 PLUMBING |
| | SECTIONS. |
| | |
| | A} THE SUBMITTED RISER DIAGRAM DOES NOT REFLECT THE |
| | FLOOR PLAN. THE 2ND FLOOR LAVATORY IS BEING INDICATED |
| | BETWEEN THE WATER CLOSET AND TUB, HOWEVER THE FLOOR |
| | PLAN IS INDICATING THE LAVATORY TO THE SIDE OF THE |
| | WATER CLOSET. AT A MINIMUM THE SANITARY RISER SHALL |
| | REFLECT THE PROPOSED FLOOR PLAN. PER SECTION 701.1 |
| | SCOPE AND (W.P.B. AS AMENDED) SECTION 106.3.5.4(9) |
| | PLUMBING. |
| | |
| | B} A 3 INCH SOIL STACK IS REQUIRED FOR THE NEW PROPOSED |
| | 2ND FLOOR PLAN PLUMBING. PER SECTION 701.1 SCOPE AND |
| | (W.P.B. AS AMENDED) SECTION 106.3.5.4(9) PLUMBING. |
| | |
| | C} A 3 INCH CLEAN OUT IS REQUIRED AT THE BASE OF THE |
| | SOIL STACK FOR THE 2ND FLOOR PLUMBING. PER SECTION |
| | 708.3.4 BASE OF STACK. |
| | |
| | D} A VENT IS REQUIRED FOR THE 2ND FLOOR MASTER BATH |
| | TUB. PER A 1/4" = 1' SCALE THE TUB POINT OF VENT |
| | APPEARS TO BE ABOUT 9 FEET FROM TRAP. PER TABLE 906.1, |
| | A 2 INCH TRAP CAN ONLY BE 6 FEET FROM VENT. |
| | |
| | 4. SHEET 2 OF 2, 2ND FLOOR DEMOLITION PLAN: CLEARLY |
| | INDICATE THE FOLLOWING ON THE DEMO PLAN PER FBC-2004 |
| | PLUMBING, SECTION 704.5 DEAD ENDS: IN THE REMOVAL OF |
| | ANY PART OF A DRAINAGE SYSTEM, DEAD ENDS SHALL BE |
| | PROHIBITED. A PLUMBING PERMIT IS REQUIRED AND AN |
| | INSPECTION IS REQUIRED OF PLUMBING DEMO WORK PRIOR TO |
| | COVERING DEMO WORK WITH FINNISH WALLS, CIELINGS, OR |
| | POURED CONCRETE SLABS. |
| | |
| | ********IMPORTANT INFORMATION******** |
| | WHEN RESUBMITTING PLANS, PLEASE PROVIDE A COPY OF THE |
| | OLD PLANS, CLEARLY INDICATE THE REVISION ON THE NEW |
| | PLANS, REMOVE AND REPLACE ANY PAGES AS NECESSARY. A |
| | TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW COMMENT |
| | NUMBER, WITH A DESCRIPTION OF THE REVISION MADE, |
| | IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR PERMIT. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY: MIKE PERSON |
| | PLUMBING PLANS EXAMINER |
| | PHONE= (561) 805-6730 |
| | FAX= (561) 805-6731 |
| | E-MAIL= [email protected] |