| 2008-09-12 16:54:54 | PLUMBING PLAN REVIEW: |
| | DENIED: |
| | |
| | PLAN REVIEW UNDER THE 2004 FLORIDA BUILDING CODES WITH |
| | 2007 REVISIONS, CITY OF WEST PALM BEACH AMENDMENTS TO |
| | CHAPTER 1 (W.P.B.), FLORIDA ADMINISTRATIVE CODE |
| | (F.A.C.), AND FLORIDA STATUTES (F.S.). |
| | |
| | THE FOLLOWING CORRECTIONS/INFORMATION ARE REQUIRED FOR |
| | PLUMBING PLAN REVIEW TO MEET CODE COMPLIANCE. |
| | |
| | 1. SHEET A102 BATH ROOM NUMBER 208 AND 214 INDICATE THE |
| | WATER CLOSET 1'-4" FROM THE SHOWER WALL TO THE |
| | CENTERLINE OF THE WATER CLOSETS IN A 30" MIN. SPACE |
| | PROVIDED FOR THE WATER CLOSET. THIS LEAVES 14" FROM |
| | CENTERLINE OF THE WATER CLOSET TO THE EDGE OF THE |
| | LAVATORY. PER CODE A MINIMUM OF 15" IS REQUIRED. WHY |
| | ISN'T THE WATER CLOSET CENTERED IN THE 30" SPACE AT |
| | 1'-3" TO BE COMPLIANT? PER FBC-2004 PLUMBING SECTION |
| | 405.3.1 WATER CLOSETS, URINALS, LAVATORIES AND BIDETS. |
| | |
| | 2. SHEET A103 EXISTING GARAGE-PROPOSED SECOND FLOOR |
| | PLAN ROOM NUMBER 203 DOES NOT INDICATE THE PROPOSED BAR |
| | SINK THAT IS BEING INDICATED ON SHEET P201 GUEST HOUSE |
| | SANITARY RISER. PLEASE CORRELATE PLAN SHEET TO REFLECT |
| | THE PROPOSED BAR SINK. PER (W.P.B. AS AMENDED) SECTION |
| | 106.1.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 3. SHEET A400 PLUMBING FIXTURE SCHEDULE: PLEASE KNOW |
| | THAT THE FIXTURES IN THE SCHEDULE REQUIRE THIRD-PARTY |
| | TESTING AND CERTIFICATION. PLEASE KNOW THAT FIXTURES |
| | LISTED IN THE SCHEDULE ARE NOT COMMONLY USED FIXTURES |
| | SUCH AS KOHLER OR AMERICAN STANDARD AND AN ONLINE |
| | SEARCH BY THIS PLANS EXAMINER FAILED TO COME UP WITH |
| | THE REQUIRED THIRD PARTY TESTING AND CERTIFICATIONS. |
| | PROVIDE MANUFACTURE SPECIFICATION SHEETS WITH THIS |
| | INFORMATION. PER FBC-2004 PLUMBING SECTION 303.4 |
| | THIRD-PARTY TESTING AND CERTIFICATION. |
| | NOTE: THE FOLLOWING IS A LIST OF FIXTURES AND COMPLIANT |
| | THIRD-PARTY TESING AND CERTIFICATION STANDARDS |
| | MANUFACTURE SHEETS MUST INDICATE PER THE FBC-2004 |
| | PLUMBING CODE SECTIONS. |
| | |
| | A} BATHTUBS= SECTION 407.1 APPROVAL. BATHTUBS SHALL |
| | CONFORM TO ANSI Z124.1, ASME A112.19.1M, ASME |
| | A112.19.4M, ASME A112.19.9M, CSA B45.2, CSA B45.3 OR |
| | CSA B45.5. |
| | |
| | B} LAVATORIES= SECTION 416.1 APPROVAL. LAVATORIES SHALL |
| | CONFORM TO ANSI Z124.3, ASME A112.19.1M, ASME |
| | A112.19.2M, ASME A112.19.3M, ASME A112.19.4M, ASME |
| | A112.19.9M, CSA B45.1, CSA B45.2, CSA B45.3 OR CSA |
| | B45.4. GROUP WASH-UP EQUIPMENT SHALL CONFORM TO THE |
| | REQUIREMENTS OF SECTION 402 . EVERY 20 INCHES (508 MM) |
| | OF RIM SPACE SHALL BE CONSIDERED AS ONE LAVATORY. |
| | SECTION 416.2 CULTURED MARBLE LAVATORIES. CULTURED |
| | MARBLE VANITY TOPS WITH AN INTEGRAL LAVATORY SHALL |
| | CONFORM TO ANSI Z124.3 OR CSA B45.5. |
| | |
| | C} SHOWER= SECTION 417.1 APPROVAL. PREFABRICATED |
| | SHOWERS AND SHOWER COMPARTMENTS SHALL CONFORM TO ANSI |
| | Z124.2, ASME A112.19.9M OR CSA B45.5. SHOWER VALVES FOR |
| | INDIVIDUAL SHOWERS SHALL CONFORM TO THE REQUIREMENTS OF |
| | SECTION 424.4 . |
| | |
| | D} WATER CLOSET= SECTION 420.1 APPROVAL. WATER CLOSETS |
| | SHALL CONFORM TO THE WATER CONSUMPTION REQUIREMENTS OF |
| | SECTION 604.4 AND SHALL CONFORM TO ANSI Z124.4, ASME |
| | A112.19.2M, CSA B45.1, CSA B45.4 OR CSA B45.5. WATER |
| | CLOSETS SHALL CONFORM TO THE HYDRAULIC PERFORMANCE |
| | REQUIREMENTS OF ASME A112.19.6. WATER CLOSET TANKS |
| | SHALL CONFORM TO ANSI Z124.4, ASME A112.19.2, ASME |
| | A112.19.9M, CSA B45.1, CSA B45.4 OR CSA B45.5. |
| | ELECTRO-HYDRAULIC WATER CLOSETS SHALL COMPLY WITH ASME |
| | A112.19.13. |
| | |
| | E} FAUCETS AND OTHER FIXTURE FITTINGS SECTION 424.1 |
| | APPROVAL. FAUCETS AND FIXTURE FITTINGS SHALL CONFORM TO |
| | ASME A112.18.1 OR CSA B125. FAUCETS AND FIXTURE |
| | FITTINGS THAT SUPPLY DRINKING WATER FOR HUMAN INGESTION |
| | SHALL CONFORM TO THE REQUIREMENTS OF NSF 61, SECTION 9. |
| | FLEXIBLE WATER CONNECTORS EXPOSED TO CONTINUOUS |
| | PRESSURE SHALL CONFORM TO THE REQUIREMENTS OF SECTION |
| | 605.6 . |
| | |
| | F} SECTION 424.1.1 FAUCETS AND SUPPLY FITTINGS. FAUCETS |
| | AND SUPPLY FITTINGS SHALL CONFORM TO THE WATER |
| | CONSUMPTION REQUIREMENTS OF SECTION 604.4 . |
| | |
| | G} SECTION 424.1.2 WASTE FITTINGS. WASTE FITTINGS SHALL |
| | CONFORM TO ONE OF THE STANDARDS LISTED IN TABLES 702.1 |
| | AND 702.4 FOR ABOVE-GROUND DRAINAGE AND VENT PIPE AND |
| | FITTINGS, OR THE WASTE FITTINGS SHALL BE CONSTRUCTED OF |
| | TUBULAR STAINLESS STEEL WITH A MINIMUM WALL THICKNESS |
| | OF 0.012 INCH (0.30 MM), TUBULAR COPPER ALLOY HAVING A |
| | MINIMUM WALL THICKNESS OF 0.027 INCH (0.69 MM) OR |
| | TUBULAR PLASTIC COMPLYING WITH ASTM F 409. |
| | |
| | H} SECTION 424.2 HAND SHOWERS. HAND-HELD SHOWERS SHALL |
| | CONFORM TO ASSE 1014 OR CSA B125. |
| | |
| | I} SECTION 424.3 SHOWER VALVES. SHOWER AND TUB-SHOWER |
| | COMBINATION VALVES SHALL BE BALANCED PRESSURE, |
| | THERMOSTATIC OR COMBINATION |
| | BALANCED-PRESSURE/THERMOSTATIC VALVES THAT CONFORM TO |
| | THE REQUIREMENTS OF ASSE 1016 OR CSA B125. SHOWER AND |
| | TUB-SHOWER COMBINATION VALVES AND MASTER THERMOSTATIC |
| | MIXING VALVES REQUIRED BY THIS SECTION SHALL BE |
| | EQUIPPED WITH A MEANS TO LIMIT THE MAXIMUM SETTING OF |
| | THE VALVE TO 120?F (49?C), WHICH SHALL BE FIELD |
| | ADJUSTED IN ACCORDANCE WITH THE MANUFACTURER?S |
| | INSTRUCTIONS. |
| | |
| | J} SECTION 424.4 HOSE-CONNECTED OUTLETS. FAUCETS AND |
| | FIXTURE FITTINGS WITH HOSE-CONNECTED OUTLETS SHALL |
| | CONFORM TO ASME A112.18.3M. |
| | |
| | K} SECTION 424.5 TEMPERATURE-ACTUATED, FLOW REDUCTION |
| | VALVES FOR INDIVIDUAL FIXTURE FITTINGS. |
| | TEMPERATURE-ACTUATED, FLOW REDUCTION DEVICES, WHERE |
| | INSTALLED FOR INDIVIDUAL FIXTURE FITTINGS, SHALL |
| | CONFORM TO ASSE 1062. SUCH VALVES SHALL NOT BE USED |
| | ALONE AS A SUBSTITUTE FOR THE BALANCED PRESSURE, |
| | THERMOSTATIC OR COMBINATION SHOWER VALVES REQUIRED IN |
| | SECTION 424.3 . |
| | |
| | L} SECTION 424.6 TRANSFER VALVES. DECK-MOUNTED |
| | BATH/SHOWER TRANSFER VALVES CONTAINING AN INTEGRAL |
| | ATMOSPHERIC VACUUM BREAKER SHALL CONFORM TO THE |
| | REQUIREMENTS OF ASME A112.18.7. |
| | |
| | 4. SHEET P200 E.W.H. PIPING SCHEMATIC: PLEASE KNOW THAT |
| | THE "WATTS #288 ATMOSPHERIC VACUUM BREAKER" IS THE |
| | WRONG VALVE FOR A BOTTOM FED WATER HEATER. A "WATTS |
| | #N36 VACUUM RELIEF VALVE" IS THE CORRECT TYPE OF VALVE |
| | FOR A BOTTOM FED WATER HEATER. PER FBC-2004 PLUMBING |
| | SECTION 504.2 VACUUM RELIEF. |
| | |
| | 5. SHEET P200 MAIN HOUSE WATER HEATER DETAIL NOTES #9: |
| | A VACUUM RELIEF VALVE IS REQUIRED FOR THE 80 GALLON |
| | STORAGE TANK NOT A VACUUM BREAKER. PLEASE CLEARLY |
| | INDICATE THIS REQUIRED VALVE ON THE RESUBMITTAL. PER |
| | FBC-2004 PLUMBING SECTION 504.2 VACUUM RELIEF. |
| | |
| | 6. SHEET P200 MAIN HOUSE WATER HEATER DETAIL NOTES #8 |
| | THE "AUTO AIR VENT-GRUNDHFUS YGE075T" LOCATION IS |
| | MISSING FROM THE DETAIL. CLEARLY INDICATE THE LOCATION |
| | OF THIS ITEM. PER FBC-2005 PLUMBING SECTION 501.1 |
| | SCOPE. |
| | |
| | 7. SHEET P201 MASTER BATH ROOM #205: DUE TO THE FIXTURE |
| | LAYOUT CHANGES OF THIS ROOM A COMPLETE SANITARY |
| | ISOMETRIC RISER DIAGRAM IS REQUIRED OF THE NEW PROPOSED |
| | MASTER BATH LAYOUT. PER FBC-2004 PLUMBING SECTION 701.1 |
| | SCOPE, SECTION 901.1 SCOPE AND (W.P.B. AS AMENDED) |
| | SECTION 106.3.5.4 (9) PLUMBING. |
| | |
| | 8. SHEET P201 MAIN HOUSE SANITARY RISER: A CLEANOUT IS |
| | REQUIRED FOR THE 3 INCH WASHING MACHINE STACK. CLEARLY |
| | INDICATE THE REQUIRED 3 INCH CLEANOUT FOR THE WASHING |
| | MACHINE STACK TO BE LOCATED A FOUR FEET ABOVE FINNISH |
| | FLOOR (4' A.F.F.) PER FBC-2004 PLUMBING SECTION 708.9 |
| | ACCESS. |
| | |
| | ********IMPORTANT INFORMATION******** |
| | WHEN RESUBMITTING PLANS, PLEASE PROVIDE A COPY OF THE |
| | OLD PLANS, CLEARLY INDICATE THE REVISION ON THE NEW |
| | PLANS, REMOVE AND REPLACE ANY PAGES AS NECESSARY. A |
| | TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW COMMENT |
| | NUMBER, WITH A DESCRIPTION OF THE REVISION MADE, |
| | IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR PERMIT. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY: MIKE PERSON |
| | PLUMBING PLANS EXAMINER |
| | PHONE= (561) 805-6730 |
| | FAX= (561) 805-6731 |
| | E-MAIL= [email protected] |