| 2008-09-17 15:52:21 | FAILED FOR FOLLOWING REASONS: |
| | |
| | 1. PLEASE SHOW ON DRAWINGS THE TURBIDITY BARRIER |
| | DETAILS OF POLLUTION PREVENTION . PLEASE SHOW ON |
| | DRAWINGS THE TURBIDITY BARRIER AROUND CATCH BASINS, ANY |
| | OUT FALLS OR LAKES IF YOU HAVE ETC DURING CONSTRUCTION |
| | AND ALL DEMOLITION PHASE. HEIGHT OF BARRIER SHOULD BE |
| | HIGH ENOUGH PER FDEP TO STOP DUST PARTICLES. |
| | |
| | 2. PLEASE PROVIDE A COPY OF BOND FOR ORDINANCE NO. |
| | 4060-07: |
| | |
| | ALL DEMOLITION AND NEW CONSTRUCTION PERMITS, WITH |
| | EXCEPTION OF SINGLE FAMILY, DUPLEX AND ACCESSORY |
| | APARTMENT, SHALL POST BONDS OR DEPOSITS FOR THE |
| | FOLLOWING: |
| | |
| | 1. EROSION CONTROL, AND |
| | 2. LAND STABILIZATION |
| | |
| | THE AMOUNT OF THE EROSION CONTROL AND LAND |
| | STABILIZATION BONDS SHALL BE DETERMINED BY THE ENGINEER |
| | OF RECORD USING THE CURRENT CITY COST SCHEDULE AND |
| | VERIFIED BY THE CITY'S ENGINEERING SERVICES DEPT. |
| | PLEASE CONTACT BRIAN MOREE, ENG SERVICES CONSTRUCTION |
| | SUPERVISOR, AT 561- 494 -1040 FOR MORE INFORMATION. |
| | |
| | UPON VERTICAL CONSTRUCTION COMMENCEMENT, PAYMENT IN |
| | FULL OF ALL APPLICABLE FEES, AND COMPLIANCE WITH ALL |
| | TERMS AND CONDITIONS OF ANY POSTED BOND, THE PERMITTEE |
| | MAY REQUEST RELEASE OF THE BONDS OR DEPOSITS. |
| | |
| | A COPY OF ORDINANCE NO. 4060-07 MAY BE OBTAINED FROM |
| | THE CITY CLERK'S OFFICE LOCATED ON THE FIRST FLOOR. |
| | |
| | 3. PLEASE SHOW ON DRAWINGS DUMPSTER & ITS ENCLOSURE |
| | DETAILS PER CITY OF WPB, & LOCATION ON DWG, LOCATION |
| | MUST BE ACCESSIBLE FOR PICKUP TRUCK. |
| | |
| | 4. PLEASE SHOW ON STORM WATER QUALITY CALCULATION THAT |
| | YOU HAVE CONSIDERED FLOOD ZONE AREA, & 5,10, 25, 50, |
| | 100 YEAR FLOOD CRITERIA AND CROWN OF THE ROAD WHEN YOU |
| | DETERMINE THE FIRST FLOOR ELEVATION. FIRST FLOOR |
| | ELEVATION SHOULD BE ATLEAST 1 FOOT HIGHER THAN HIGHEST |
| | CROWN OF THE ROAD. |
| | |
| | 5. PLEASE SHOW ALL STORM WATER PIPES AROUND YOUR SITE |
| | SO, WE CAN SEE THE LAYOUT OF STORM WATER PIPES FROM ALL |
| | OTHER STORM WATER PIPES. PLEASE SHOW DETAIL OF THE |
| | CONTROL STRUCTURES WITH ELEVATIONS, NOTCHES, BLEEDING |
| | ELEVATION, ETC ON DRAWINGS, CALCULATION FOR |
| | EXFILTRATION TRENCHES, PLEASE SHOW DRY DETENTION/WET |
| | DETENTION AREAS IN STORM WATER CALS IF YOU HAVE ALL |
| | THESE. PLEASE RESUBMIT GEO-TECH REPORT AND ALL |
| | ENVRONMENTAL REPORT. |
| | |
| | 6. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST, AROUND |
| | YOUR SITE FOR STORM WATER DRAIN SO YOUR SITE DO NOT GET |
| | FLOODED AND HAVE ENOUGH DRAINS. |
| | |
| | 7. PLEASE PROVIDE A COPY OF GEO-TECH REPORT & STORM |
| | WATER QUALITY CALCULATIONS TO 1000 45TH STREET FOR |
| | THEIR APPROVAL BEFORE WE ISSUE A PERMIT. |
| | |
| | 8. WATER & SEWER PLANS MUST BE APPROVED FROM MANNY G. |
| | OF 1000 45TH STREET BEFORE WE ISSUE A PERMIT. |
| | |
| | PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| | PERMITTING PROCESS |
| | |
| | RASIK CHOKSHI 805-6723 |
| | |
| | |
| | |
| | |
| | |
| | |