| 2008-10-08 09:09:53 | PLAN REVIEW UNDER THE 2004 FLORIDA BUILDING CODE & |
| | REFERENCED CODES WITH 2007 REVISIONS, CITY OF WEST PALM |
| | BEACH AMENDMENTS TO CHAPTER 1 (W.P.B.), FLORIDA |
| | ADMINISTRATIVE CODE (F.A.C.), AND FLORIDA STATUTES |
| | (F.S.). |
| | |
| | *** DENIED *** |
| | |
| | 1) THE COOLING LOAD CALCULATIONS FOR SYSTEM 1 ARE |
| | CALLING FOR 34,662 TOTAL COOLING BTU'S, THE MECHANICAL |
| | PLAN EQUIPMENT SCHEDULE FOR SYSTEM 1 IS SHOWING 47,500 |
| | TOTAL COOLING BTU'S, THE PLANS CAN ONLY CALL FOR 15% |
| | MORE TOTAL COOLING BTU'S THAN THE COOLING LOAD |
| | CALCULATIONS, PER 2004 FBC 13-607.1.ABC.1.1. (A THREE |
| | TON SYSTEM WOULD MEET THIS REQUIREMENT SEE ATTACHED ARI |
| | PRINT OUT). PLEASE CHECK AND CORRECT. |
| | |
| | 2) THE COOLING LOAD CALCULATIONS FOR SYSTEM 2 IS |
| | CALCULATING THE CEILING HEIGHT AT 12 FEET, THE BUILDING |
| | PLANS STATE THE CEILING HEIGHT IS 10 FEET. PLEASE |
| | CORRECT COOLING LOAD CALCULATION PER 2004 FBC/R |
| | 13-607.1.ABC.1 AND 13-103.3. |
| | |
| | 3) THE COOLING LOAD CALCULATIONS FOR SYSTEM 2 ARE |
| | CALLING FOR 43,173 TOTAL COOLING BTU'S, THE MECHANICAL |
| | PLAN EQUIPMENT SCHEDULE FOR SYSTEM 2 IS SHOWING 59,00 |
| | TOTAL COOLING BTU'S, THE PLANS CAN ONLY CALL FOR 15% |
| | MORE TOTAL COOLING BTU'S THAN THE COOLING LOAD |
| | CALCULATIONS, PER 2004 FBC 13-607.1.ABC.1.1. (A FOUR |
| | TON SYSTEM WOULD MEET THIS REQUIREMENT SEE ATTACHED ARI |
| | PRINT OUT, BE ADVISED THIS MAY CHANGE AFTER THE COOLING |
| | LOAD CALCULATIONS HAVE BEEN CORRECTED FOR CEILING |
| | HEIGHT). PLEASE CHECK AND CORRECT. |
| | |
| | 4) PLEASE SIZE THE SUPPLY AIR DUCTS TO BATHROOM #4 AND |
| | WATER CLOSET #4 ON MECHANICAL PLAN, PER 2004 FBC/R |
| | M1601.1. |
| | |
| | 5) ADD TO THE EQUIPMENT SCHEDULE ON THE MECHANICAL |
| | PLANS THE SEER OF THE SYSTEMS, PER 2004 FBC |
| | 13-607.1.ABC.3.2.1. |
| | |
| | MECHANICAL PLAN REVIEW BY; |
| | TOM GORDON (561) 805-6729 |
| | E-MAIL; [email protected] |