2008-10-08 09:09:53PLAN REVIEW UNDER THE 2004 FLORIDA BUILDING CODE &
 REFERENCED CODES WITH 2007 REVISIONS, CITY OF WEST PALM
 BEACH AMENDMENTS TO CHAPTER 1 (W.P.B.), FLORIDA
 ADMINISTRATIVE CODE (F.A.C.), AND FLORIDA STATUTES
 (F.S.).
  
 *** DENIED ***
  
 1) THE COOLING LOAD CALCULATIONS FOR SYSTEM 1 ARE
 CALLING FOR 34,662 TOTAL COOLING BTU'S, THE MECHANICAL
 PLAN EQUIPMENT SCHEDULE FOR SYSTEM 1 IS SHOWING 47,500
 TOTAL COOLING BTU'S, THE PLANS CAN ONLY CALL FOR 15%
 MORE TOTAL COOLING BTU'S THAN THE COOLING LOAD
 CALCULATIONS, PER 2004 FBC 13-607.1.ABC.1.1. (A THREE
 TON SYSTEM WOULD MEET THIS REQUIREMENT SEE ATTACHED ARI
 PRINT OUT). PLEASE CHECK AND CORRECT.
  
 2) THE COOLING LOAD CALCULATIONS FOR SYSTEM 2 IS
 CALCULATING THE CEILING HEIGHT AT 12 FEET, THE BUILDING
 PLANS STATE THE CEILING HEIGHT IS 10 FEET. PLEASE
 CORRECT COOLING LOAD CALCULATION PER 2004 FBC/R
 13-607.1.ABC.1 AND 13-103.3.
  
 3) THE COOLING LOAD CALCULATIONS FOR SYSTEM 2 ARE
 CALLING FOR 43,173 TOTAL COOLING BTU'S, THE MECHANICAL
 PLAN EQUIPMENT SCHEDULE FOR SYSTEM 2 IS SHOWING 59,00
 TOTAL COOLING BTU'S, THE PLANS CAN ONLY CALL FOR 15%
 MORE TOTAL COOLING BTU'S THAN THE COOLING LOAD
 CALCULATIONS, PER 2004 FBC 13-607.1.ABC.1.1. (A FOUR
 TON SYSTEM WOULD MEET THIS REQUIREMENT SEE ATTACHED ARI
 PRINT OUT, BE ADVISED THIS MAY CHANGE AFTER THE COOLING
 LOAD CALCULATIONS HAVE BEEN CORRECTED FOR CEILING
 HEIGHT). PLEASE CHECK AND CORRECT.
  
 4) PLEASE SIZE THE SUPPLY AIR DUCTS TO BATHROOM #4 AND
 WATER CLOSET #4 ON MECHANICAL PLAN, PER 2004 FBC/R
 M1601.1.
  
 5) ADD TO THE EQUIPMENT SCHEDULE ON THE MECHANICAL
 PLANS THE SEER OF THE SYSTEMS, PER 2004 FBC
 13-607.1.ABC.3.2.1.
  
 MECHANICAL PLAN REVIEW BY;
 TOM GORDON (561) 805-6729
 E-MAIL; [email protected]