| 2009-01-09 10:50:48 | SUBMITTAL DENIED |
| | |
| | 1) THIS IS CONSIDERED A REVISION RATHER THAN A |
| | SUBMITTAL, BECAUSE IT INCREASES THE SCOPE OF WORK FOR |
| | WHICH THE PERMIT WAS ISSUED. THE SCOPE OF WORK FOR THE |
| | PERMIT WAS TO REPLACE THE WOOD ROOF DECKING AND ROOF |
| | COVERING. THE VALUE OF THE WORK ON THE PERMIT WILL NEED |
| | TO BE CHANGED TO INCLUDE THE COST OF REPLACING THE ROOF |
| | TRUSSES AND ASSOCIATED ITEMS SUCH AS THE CEILING |
| | INSULATION, DRYWALL, ELECTRIC, MECHANICAL, ETC. THERE |
| | ARE ALSO REVISION FEES THAT WILL BE ASSESSED. |
| | PLEASE SPECIFY THE VALUE OF THE ADDITIONAL WORK. FBC |
| | 108.1* CITY AMENDMENTS. |
| | |
| | 2) SPECIFY THE ATTIC INSULATION, CEILING COVERING, |
| | ELECTRIC, MECHANICAL SYSTEMS, ETC. ON THE PLANS. FBC |
| | 13-600, FBC R702 AND FBC 106.1.1* CITY AMENDMENTS. |
| | |
| | 3) SHOW COMPLIANCE WITH FBC R806.1 VENTILATION |
| | REQUIRED. |
| | ENCLOSED ATTICS AND ENCLOSED RAFTER SPACES FORMED WHERE |
| | CEILINGS ARE APPLIED DIRECTLY TO THE UNDERSIDE OF ROOF |
| | RAFTERS SHALL HAVE CROSS VENTILATION FOR EACH SEPARATE |
| | SPACE BY VENTILATING OPENINGS PROTECTED AGAINST THE |
| | ENTRANCE OF RAIN. VENTILATING OPENINGS SHALL BE |
| | PROVIDED WITH CORROSION-RESISTANT WIRE MESH, WITH 1/8 |
| | INCH (3.2 MM) MINIMUM TO 1/4 INCH (6.4 MM) MAXIMUM |
| | OPENINGS. |
| | |
| | 4) SHOW COMPLIANCE WITH FBC R806.2 MINIMUM AREA. |
| | THE TOTAL NET FREE VENTILATING AREA SHALL NOT BE LESS |
| | THAN 1 TO 150 OF THE AREA OF THE SPACE VENTILATED |
| | EXCEPT THAT THE TOTAL AREA IS PERMITTED TO BE REDUCED |
| | TO 1 TO 300, PROVIDED AT LEAST 50 PERCENT AND NOT MORE |
| | THAN 80 PERCENT OF THE REQUIRED VENTILATING AREA IS |
| | PROVIDED BY VENTILATORS LOCATED IN THE UPPER PORTION OF |
| | THE SPACE TO BE VENTILATED AT LEAST 3 FEET (914 MM) |
| | ABOVE EAVE OR CORNICE VENTS WITH THE BALANCE OF THE |
| | REQUIRED VENTILATION PROVIDED BY EAVE OR CORNICE VENTS. |
| | AS AN ALTERNATIVE, THE NET FREE CROSS-VENTILATION AREA |
| | MAY BE REDUCED TO 1 TO 300 WHEN A VAPOR BARRIER HAVING |
| | A TRANSMISSION RATE NOT EXCEEDING 1 PERM IS INSTALLED |
| | ON THE WARM SIDE OF THE CEILING. |
| | |
| | 5) SHOW COMPLIANCE WITH FBC R317.1 TWO-FAMILY |
| | DWELLINGS. |
| | DWELLING UNITS IN TWO-FAMILY DWELLINGS SHALL BE |
| | SEPARATED FROM EACH OTHER BY WALL AND/OR FLOOR |
| | ASSEMBLIES HAVING NOT LESS THAN 1-HOUR FIRE-RESISTANCE |
| | RATING WHEN TESTED IN ACCORDANCE WITH ASTM E 119. |
| | FIRE-RESISTANCE-RATED FLOOR-CEILING AND WALL ASSEMBLIES |
| | SHALL EXTEND TO AND BE TIGHT AGAINST THE EXTERIOR WALL, |
| | AND WALL ASSEMBLIES SHALL EXTEND TO THE UNDERSIDE OF |
| | THE ROOF SHEATHING. |
| | |
| | 6) THE ORIGINAL WET SIGNATURE OF THE ARCHITECT IS |
| | REQUIRED ON THE ROOF FRAMING PLANS. COPIES OR SIGNATURE |
| | STAMPS ARE NOT ACCEPTABLE. SEE FS 481 AND FAC |
| | 61G1-16.003. |
| | |
| | 7) THE COVERSHEET FOR THE TRUSS SYSTEM DESIGN PACKAGE |
| | DOES NOT COMPLY WITH RULE 61G15-31.003 (5)(E). WHICH |
| | REQUIRES THE COVER OR INDEX SHEET TO HAVE AN INDEX OF |
| | THE ATTACHED TRUSS DRAWINGS. THE NAMING AND NUMBERING |
| | SYSTEM UTILIZED FOR THE DRAWINGS SHALL BE CLEAR AS TO |
| | HOW MANY DRAWINGS THERE ARE IN THE SET AND THE DATE AND |
| | SEQUENCE NUMBER OF EACH OF THESE DRAWINGS. |
| | |
| | 8) THE PLANS ARE REQUIRED TO BE REVIEWED AND APPROVED |
| | BY HISTORIC PRESERVATION BEFORE THEY ARE SUBMITTED. |
| | FEES FOR THIS REVIEW WILL BE REQUIRED. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |
| | [email protected] |