| 2008-08-27 15:05:58 | REVIEW #: 1ST |
| | ACTION: DENIED |
| | |
| | FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS |
| | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | 1. THIS IS AN EXISTING BUILDING. THE LEVEL OF |
| | ALTERATION IS NOT DECLARED ON THE PLANS. THE DESIGN |
| | PROFESSIONAL MUST ELECT ONE OR A COMBINATION OF LEVELS |
| | OF ALTERATION PURSUANT TO SECTIONS 303, 304 AND 305 OF |
| | THE FBCEB IN ACCORDANCE WITH FBCEB 301.5. THIS REVIEW |
| | IS BASED ON AN ASSUMED ALTERATION LEVEL 2. |
| | |
| | 2. THERE ARE SEVERAL AREAS DEFINED BY NEW FULL-HEIGHT |
| | PARTITIONS IN THE WORK AREA. THIS CONSTITUTES A |
| | RECONFIGURATION OF SPACE. ALL RECONFIGURED SPACES |
| | INTENDED FOR OCCUPANCY IN ANY WORK AREA SHALL BE |
| | PROVIDED WITH NATURAL OR MECHANICAL VENTILATION OR |
| | EXHAUST IN ACCORDANCE WITH THE FBCEB 609.1. PROVIDE |
| | OUTSIDE AIR CALCULATIONS BASED ON FBCM TABLE 403.3 OR |
| | FBCM 403.4 SHOWING SPACE BY SPACE CALCULATIONS BASED ON |
| | OCCUPANCY CLASSIFICATION, OCCUPANT LOAD, CFM OF OUTSIDE |
| | AIR REQUIRED AND CFM OF OUTSIDE AIR PROVIDED. |
| | |
| | 3. PAGE 3.0M SHOWS AT LEAST TWO DIFFERENT TYPES OF |
| | LINEAR DIFFUSERS IN THE NEW CEILING. THERE IS NO |
| | INDICATION ON PLANS AS TO THE DIFFERENCE BETWEEN THESE |
| | DIFFUSERS. PLEASE PROVIDE A SYMBOL LEGEND WHICH |
| | EXPLAINS ALL SYSTEMS OR COMPONENTS USED AS PART OF THE |
| | MECHANICAL SYSTEM IN ACCORDANCE WITH FBCM 603.1 AND |
| | FBCB 106.1.1. |
| | |
| | 4. PAGE 3.0M: MECHANICAL SCOPE OF WORK NOTE #4 |
| | INDICATES THAT NEW ADDITIONAL LINEAR DIFFUSERS AND FLEX |
| | DUCTS ARE PART OF THE SCOPE OF THIS WORK. HOWEVER, NO |
| | NEW DUCTS OR DIFFUSERS ARE INDICATED ON PLANS. PLEASE |
| | CLARIFY AND CLEARLY IDENTIFY THE SCOPE OF WORK ON THE |
| | PLANS IN ACCORDANCE WITH FBCM 603.1 AND FBCB 106.1.1. |
| | |
| | 5. WITH NEW OR USED DIFFUSERS BEING CONNECTED TO DUCTS, |
| | PLEASE PROVIDE DETAIL FOR THIS DUCT TO TERMINAL FITTING |
| | CONNECTION DEMONSTRATING COMPLIANCE WITH THE SEALING |
| | AND MECHANICAL FASTENING REQUIREMENTS IN ACCORDANCE |
| | WITH ALL PORTIONS OF FBCM 603.5.6. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| | RONALD J. REGUEIRO |
| | 561.805.6719 |
| | [email protected] |