Plan Review Notes
Plan Review Notes For Permit 08070817
Permit Number 08070817
Review Stop P
Sequence Number 1
Notes
Date Text
2008-08-06 10:56:57DENIED
 REFERENCE: FBC-2004 PLUMBING
 FBC-2004 BUILDING
 FBC-2004 CHAPTER 1
 FBC-2004 CHAPTER 11
  
 1. A SITE PLAN OR SURVEY IS REQUIRED. SHOW THE LOCATION
 OF THE WATER SOURCE, (METER), RPZV BACKFLOW, SEWER
 LATERAL, BUILDING SEWER & WATER SERVICE. SECTION
 106.1.2.
  
 2. INDICATE THE OCCUPANCY OF THE BUILDING. SECTION
 106.3.5.1.1(2). THIS WILL DETERMINE THE REQUIRED
 FIXTURES. TABLES 1004.1.2 & 403.1.
  
 3. SUBMIT DETAILS FOR THE MEN'S & WOMEN'S TOILET ROOMS
 SHOWING COMPLIANCE WITH THE FOLLOWING:
 ___FOR W/C'S
 A. 11-4.16.2 CLEAR FLOOR SPACE
 B. 11-4.16.6 DISPENSERS
 ___FOR URINALS
 A. 11-4.18.3 CLEAR FLOOR SPACE
 B. 11-4.18.4 FLUSH CONTROLS
 ___FOR LAVS
 A. 11-4.19.3 CLEAR FLOOR SPACE
 ___FOR STALLS
 A. 11-4.17.3 (FIG. 30E) - SHOWN AS 5'11" WIDE. AS
 CONFIGURED A MINIMUM 7'1" WIDTH IS REQUIRED FOR THE
 ACCESSIBLE STALL.
  
 4. SHT FP1 INDICATE THE WATER CLOSETS TO BE 1'6" OFF
 THE WALL TO THE CENTERLINE OF THE FIXTURE, (FIG 28),
 AND THE LAV TO THE MIN. 15" OFF THE WALL TO THE
 CENTERLINE OF THE FIXTURE TO BE CENTERED ON THE 30"
 WIDTH OF THE REQUIRED CLEAR FLOOR SPACE.
  
 5. SUBMIT A DETAIL FOR THE SINK IN THE UTILITY ROOM.
 SHOW COMPLIANCE WITH THE FOLLOWING:
 A. 11-4.24.5 CLEAR FLOOR SPACE. FORWARD APPROACH IS
 REQUIRED. CABINET DOORS ARE NOT APPROVED IN THE CLEAR
 FLOOR SPACE.
  
 6. SHT FP2 SUBMIT A HORIZONTAL BUILDING DRAIN ISOMETRIC
 RISER DIAGRAM SHOWING ALL PIPE SIZES, CLEANOUTS &
 INDICATED THE DRAINAGE FIXTURE UNITS AS THEY ACCUMULATE
 IN THE SYSTEM. SECTIONS 106.3.5.1.3 , 708 & 709.1.
  
 7. SHT FP2 NO RISER SUBMITTED FOR THE DRINKING
 FOUNTAINS. PLEASE SUBMIT. SECTION 106.3.5.1.3.
  
 8. SHT FP2 WATER SUPPLY RISER DIAGRAM. WATER HAMMER
 ARRESTORS ARE REQUIRED AT THE ICE MACHINE AND AT EACH
 REF. SECTION 604.9. -- A FULL OPEN VALVE IS REQUIRED ON
 THE SUPPLY LINE TO THE WATER HEATER. SECTION 606.1(7).
 -- A FULL OPEN VALVE IS REQUIRED ON THE WATER
 DISTRIBUTION SUPPLY PIPE AT THE ENTRANCE TO THE
 BUILDING. SECTION 606.1(2). -- SHUT OFF VALVES ARE
 REQUIRED ON THE SUPPLY LINES TO THE HOSE BIBBS. SECTION
 606.2(2).
  
 9. SHT FP2 RISER FOR THE SINKS IS MISLABELED AS LAVS
 AND DOES NOT REFLECT THE FLOOR PLAN. SINKS ARE ON
 DIFFERENT SIDES OF THE WALL. RISER SHOWS THEM ON THE
 SAME SIDE OF THE WALL. PLEASE CORRELATE. SECTION
 106.1.1.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE
 THE REVISION & REMOVE & REPLACE ANY
 PAGES AS NECESSARY. A TRANSMITTAL LETTER
 LISTING THE ORIGINAL REVIEW COMMENT NUMBER,
 WITH A DESCRIPTION OF THE REVISION MADE,
 IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND
 WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE
 ALL VOID SHEETS FROM ALL PLANS AND PLACE
 ONE SET OF THEM LOOSELY ON TOP OF THE
 COLLATED PLANS TO BE REVIEWED.
 THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved