| Date |
Text |
| 2008-07-29 14:45:18 | 2004 FBC W/2007 REVISIONS |
| | REPAIR FIRE DAMAGE/REPLACE WINDOWS |
| | |
| | 1)A RECORDED COPY OF THE NOTICE OF COMMENCEMENT WILL |
| | BE REQUIRED. |
| | |
| | 2) THE BUILDING DESIGN DATA ON SHEET CVR-1 SPECIFIES A |
| | 1 STORY STRUCTURE AND PLANS ARE FOR A TWO STORY. PLEASE |
| | CORRECT. ALSO REVISE CODE REFERENCE TO THE 2004 FBC |
| | WITH 2007 REVISIONS. |
| | |
| | 3) SPECIFY THE ROOF TRUSS/ RAFTER SPACING ON THE |
| | FRAMING PLAN ON SHEET A3. FBC R801.2 |
| | |
| | 4) PLEASE CLARIFY IF THE REPAIRED AREA OF THE ROOF IS |
| | ENGINEERED TRUSSES OR CONVENTIONAL ROOF FRAMING. THE |
| | DETAILS AND NOTES REFER TRUSSES AND COMMON FRAMING. IF |
| | CONVENTIONAL ROOF FRAMING SPECIFY THE RAFTER AND JOIST |
| | SPANS AND BEARING WALL LOCATIONS. SHOW COMPLIANCE WITH |
| | R801.2 REQUIREMENTS. ROOF AND CEILING CONSTRUCTION |
| | SHALL BE CAPABLE OF ACCOMMODATING ALL LOADS IMPOSED |
| | ACCORDING TO SECTION R301 AND OF TRANSMITTING THE |
| | RESULTING LOADS TO THE SUPPORTING STRUCTURAL ELEMENTS. |
| | |
| | |
| | 5) SHOW COMPLIANCE WITH R803.2.3.1 SHEATHING |
| | FASTENINGS. WOOD STRUCTURAL PANEL SHEATHING SHALL BE |
| | FASTENED TO ROOF FRAMING WITH 8D RING-SHANK NAILS AT 6 |
| | INCHES ON CENTER AT EDGES AND 6 INCHES ON CENTER AT |
| | INTERMEDIATE FRAMING. |
| | |
| | 6) THE MECHANICAL DRAWING M1 SPECIFIES THE AIR HANDLER |
| | HANGING FROM THE TRUSSES OR 2X4 RAFTERS. PROVIDE |
| | CALCULATIONS INDICATING THAT THE TRUSSES OR RAFTERS CAN |
| | SUPPORT THE AIR HANDLER. R801.2 |
| | |
| | 7) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE |
| | STRUCTURAL WINDOW MULLIONS THAT HAVE BEEN REVIEWED AND |
| | APPROVED IN WRITING BY THE DESIGNER OF RECORD AS |
| | REQUIRED BY RULE 9B-72 AND FBC 106.3.3* CITY |
| | AMENDMENTS. |
| | |
| | 8) ADDITIONAL STRUCTURAL DRAWINGS OR CALCULATIONS MAY |
| | BE REQUIRED BY THE FIELD INSPECTOR AS THE JOB |
| | PROGRESSES. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |
| | [email protected] |