2009-04-24 16:28:36 
 PLANS ROUTED TO DOUGLAS WISE (BUILDING OFFICIAL) FOR
 PLUMBING REVIEW AT HIS REQUEST.
  
 PLUMBING PLANS SHOULD BE REDLINED FOR THE NEW DUEL FUEL
 GENERATOR, TANK AND GAS LINES TO BE UNDER SEPARATE
 PERMITS. THIS WAS AGREED TO BY PUBLIX CORPORATE
 REPRESENTATIVE, DESIGN TEAM, CONTRACTOR AND PLAN REVIEW
 STAFF BEFORE PLANS WERE RESUBMITTED. THIS WAS GONE OVER
 WITH MR. ROBERT BROWN ALSO.
 ELECTRICAL, ZONING, AND BUILDING ALREADY HAVE PLANS
 REDLINED FOR SEPARATE PERMIT FOR THE LIFE SAFETY
 GENERATOR.
  
  
2009-04-24 16:28:25** REDLINED PLANS**
  
 STORE 50, 828 SOUTHERN BLVD
  
 1) NOTE: ALL CONTINUOUS LOADS 3 OR MORE HOURS NEED TO
 BE SHOWN AND FIGURED AT 125%. 215.3,230.42.
  
 2) NOTE: AS NOTED ABOVE THE LIFE SAFETY GENERATOR WILL
 BE UNDER SEPARATE PERMIT AND PLANS. VALUATION TO BE
 INCREASED TO FOR NEW ELECTRICAL SCOPE OF WORK ALONG
 WITH THE GENERATOR AND OTHER ASSOCIATED WORK. THESE
 VALUES TO BE INCLUDED WITH THE GENERATOR PERMIT
 APPLICATION.
  
  
  
  
 IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT
 TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO
 CONTACT THIS REVIEWER.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved