| Date |
Text |
| 2008-11-21 11:40:45 | SAMANTHA HILL, BUILDING PLANS EXAMINER |
| | 561-805-6724 [email protected] |
| | FBC FLORIDA BUILDING CODE 2004 |
| | FBC EB FLORIDA BUILDING CODE 2004 EXISTING BUILDING |
| | CODE |
| | FBC R FLORIDA BUILDING CODE 2004 RESIDENTIAL |
| | FBC* CITY OF WEST PALM BEACH AMENDMENTS TO THE FBC2004 |
| | FAC FLORIDA ADMINISTRATIVE CODE |
| | FS FLORIDA STATUTE |
| | |
| | 1-79. ADDRESSED. |
| | |
| | 80. PLEASE SHOW COMPLIANCE WITH FBC910, SMOKE AND HEAT |
| | VENTS. PROVIDE CALCULATIONS ON THE PLAN AND SHOW |
| | COMPLIANCE WITH ALL REQUIREMENTS. |
| | |
| | THE REQUEST FOR CONSIDERATION UNDER ALTERNATE MATERIALS |
| | AND METHODS HAS BEEN FORWARDED TO ROBERT BROWN FOR |
| | REVIEW. THIS REVIEW WILL REMAIN IN FAILED STATUS UNTIL |
| | HIS DECISION. IF THIS REQUEST IS DENIED, THIS REVIEW |
| | WILL BE PASSED WITH PROVISO TO REVISE DESIGN TO INCLUDE |
| | THE REQUIRED SMOKE AND HEAT VENTS. IF APPROVED, A |
| | PASSED STATUS WILL BE ENTERED FOR THIS REVIEW. |
| | |
| | 81-87. ADDRESSED. |
| | |
| | 88. **PROVISO** - REVISE AS FOLLOWS, PRIOR TO |
| | INSTALLATION |
| | |
| | WBCM SUBMITTAL #8, CALCULATIONS CM MANUFACTURING, |
| | PLEASE ADDRESS: |
| | |
| | A. ASCE7-05 REFERENCED; FBC2004 REQUIRES ASCE7-02. THIS |
| | CAN BE DONE WITH A LETTER OR CAN BE A PROVISO ITEM. |
| | |
| | B. SEE PAGE 22, EXPOSURE B USED WITH AN IMPORTANCE |
| | FACTOR OF .77. IF ACCEPTABLE TO THE DESIGNER OF RECORD, |
| | THE REDUCED IMPORTANCE FACTOR CAN BE USED BUT PROVIDE |
| | JUSTIFICATION FOR USE OF EXPOSURE B. THIS JOB APPEARS |
| | TO HAVE EXPOSURE C CONDITIONS, FBC1609.4. |
| | |
| | C. CALCS AND PLANS DO NOT NEED TO BE REVISED, BUT |
| | PLEASE NOTE THAT GOVERNING CODE IS FBC2004 WITH 2007 |
| | REVISIONS/SUPPLEMENTS. CALCS REFER TO 2005 AND 2006 |
| | REVISIONS AND SUPPLEMENTS, PLANS STATE COMPLIANCE WITH |
| | INTERNATIONAL BUILDING CODE 2003. FOR FUTURE |
| | SUBMITTALS, PLEASE REVISE. |
| | |
| | D. PAGE 21 NOTE STATES "LATERAL IMPACT DOES NOT ALLOW |
| | 1/3 STRESS INCREASE AS ALLOWED FOR ASD WIND LOAD |
| | ANALYSIS" PLEASE PROVIDE MORE INFORMATION REGARDING |
| | STRESS INCREASE USED AND SEE FBC1605.3.1.1 AND CLARIFY |
| | USE OF STRESS INCREASE. |
| | |
| | |