| Date |
Text |
| 2009-07-16 09:56:02 | |
| | |
| | ** DENIED ** |
| | |
| | SUBMISSION OF THE SELECTIVE COORDINATION STUDY. |
| | |
| | ** THE FOLLOWING COMMENTS ARE BASED ON THE SELECTIVE |
| | COORDINATION STUDY AND NEW COMMENTS DERIVED DURING |
| | REVIEW. A CALL WAS MADE TO GIPE AND ASSOCIATES AND |
| | SPOKE TO MICHAEL PURTELL. |
| | |
| | ** IN THE NOTES BELOW THE SELECTIVE COORDINATION STUDY |
| | WILL BE NOTED AS SCS. |
| | |
| | 1) NOTE: NEW COMMENT: PLEASE SEE 700.9(B). PLEASE SEE |
| | NEC 2005 HANDBOOK COMMENTARY FOR WIRING OF SYSTEMS. |
| | PLEASE EXPLAIN HOW OPTIONAL STAND-BY LOADS SUCH AS |
| | CEILING FANS, SCALES AND OTHER GENERAL LOADS MAY BE |
| | PART OF THE LIFE SAFETY/ EMERGENCY SYSTEM. THIS WAS ON |
| | PREVIOUS PLANS HOWEVER WAS MISSED BY REVIEWER. |
| | STAND-BY LOADS MAY BE FED FROM SEPARATE FEED ON |
| | GENERATOR WITH SEPARATE TRANSFER SWITCH OR REMOVE ALL |
| | LOADS FROM EMERGENCY PANELS. |
| | IF ELP-1 WAS A * SWITCHBOARD * THEN THERE COULD BE A |
| | SEPARATE BRANCH FEED TO A STAND-BY ATS WHICH WOULD THEN |
| | FEED TERP-1. |
| | |
| | 2) NOTE: PLEASE COORDINATE THE SCS WITH THE PLANS. |
| | PLEASE SEE THE SCS RISER AS THIS INDICATES ONLY ONE SET |
| | OF FEEDERS TO ATS-2 WHERE THE PLANS ON RECORD INDICATES |
| | 2 SETS OF PARALLEL 3/0. |
| | |
| | 3) NOTE: PLEASE EXPLAIN THE SCS RISER WHICH SEEMS TO |
| | INDICATE 100HP AND 50HP FOR FIRE PUMP. |
| | |
| | 4) NOTE: PLEASE COORDINATE THE BREAKER ON THE GENERATOR |
| | FOR ATS-2E WHICH SHOWS 250A ON SCS RISER AND 200AMP ON |
| | PLANS. |
| | |
| | 5) NOTE: ALL OCP DEVICES ON THE GENERATOR SHALL BE PART |
| | OF THE STUDY. PLEASE KNOW BASED ON THE 60AMP BREAKER ON |
| | ELP-1 THIS WOULD ALSO BE ON STUDY. ALTHOUGH PLEASE SEE |
| | COMMENT #1 ABOVE AS THIS DOES AFFECT THE RISER AS IT |
| | STANDS. |
| | |
| | |
| | 240.12, 701.18, 700.27 |
| | |
| | |
| | |
| | |
| | ** IMPORTANT ** |
| | ONCE AUDIT/REVIEWS ARE COMPLETE AND PLANS ARE PICKED UP |
| | FOR CORRECTIONS, PLEASE BE SURE TO COMPLETELY REMOVE |
| | ALL OLD/VOIDED SHEETS AND ONLY INSERT NEW REVISED |
| | SHEETS INTO TWO COMPLETE SETS FOR REVIEW AND STAMPING. |
| | DO NOT LEAVE ANY OLD/VOIDED SHEETS IN SETS. |
| | PLEASE DO NOT ATTACH SUPPORTING DOCUMENTS TO PLANS. ANY |
| | ADDITIONAL DOCUMENTATION SUCH AS PRODUCT APPROVALS, |
| | SPEC/CUT SHEETS, CALCULATIONS ETC. SHOULD BE PLACED |
| | INTO TWO SETS/FOLDERS/BINDERS ETC. |
| | PLEASE KNOW ONLY ONE SET OF THE OLD/VOIDED SHEETS |
| | SHOULD BE SUBMITTED FOR REFERENCE. |
| | THIS WILL HELP IN THE AUDIT/REVIEW PROCESS AND AVOID |
| | ANY DELAYS. |
| | |
| | IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT |
| | TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO |
| | CONTACT THIS REVIEWER. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW II |
| | CONSTRUCTION SERVICES DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |
| | [email protected] |
| | |