2008-07-29 11:49:27PRIVATE PROVIDER AUDIT #: 1ST
 ACTION: DENIED
  
 FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 1. M101C: EF 18 IS SHOWN SERVING STORAGE ROOM 122 WITH
 2200 TOTAL CFM OF EXHAUST. HOWEVER, THE FAN SCHEDULE ON
 M106C SHOWS EF 18 PROVIDING 3650 CFM OF EXHAUST. WHICH
 IS CORRECT? PLEASE COORDINATE FLOOR PLANS AND EQUIPMENT
 SCHEDULES SHOWING THE REQUIRED DISTRIBUTION OF AIR IN
 ACCORDANCE WITH FBCM 603.1, 501.1 AND FBCB 106.1.1.
  
 2. M101C AND A002C: THE FOLLOWING ROOMS: 124, 125, 126
 AND 127 HAVE A ROOF WHICH IS LOWER THAN THE MAIN ROOF
 OF THE BUILDING. THIS ROOF HAS MULTIPLE EXHAUST FANS
 WHICH ARE REQUIRED TO BE ACCESSIBLE FOR SERVICE AND
 REPLACEMENT IN ACCORDANCE WITH FBCM 306.1. ALSO, WHERE
 EQUIPMENT AND APPLIANCES REQUIRING ACCESS ARE INSTALLED
 ON ROOFS OR ELEVATED STRUCTURES AT A HEIGHT EXCEEDING
 16 FEET, SUCH ACCESS SHALL BE PROVIDED BY A PERMANENT
 APPROVED MEANS OF ACCESS, THE EXTENT OF WHICH SHALL BE
 FROM GRADE OR FLOOR LEVEL TO THE EQUIPMENT AND
 APPLIANCES? LEVEL SERVICE SPACE IN ACCORDANCE WITH FBCM
 306.5. THIS LOWER ROOF IS SHOWN ON PAGE A002C TO HAVE A
 HEIGHT OF 25 FEET ABOVE GRADE. PLEASE SHOW A PERMANENT
 MEANS OF ACCESS TO THIS ROOF LEVEL IN ACCORDANCE WITH
 THIS SECTION.
  
 3. M102C DETAIL 3: STAIR #1 ENCLOSURE 209 IS SHOWN
 BEING PENETRATED BY A 20X16 EXHAUST DUCT FROM EF 30 ON
 THE 2ND FLOOR. PENETRATIONS INTO AND OPENINGS THROUGH
 AN EXIT ENCLOSURE ARE PROHIBITED EXCEPT FOR REQUIRED
 EXIT DOORS, EQUIPMENT AND DUCTWORK NECESSARY FOR
 INDEPENDENT PRESSURIZATION, SPRINKLER PIPING,
 STANDPIPES, ELECTRICAL RACEWAY FOR FIRE DEPARTMENT
 COMMUNICATION AND ELECTRICAL RACEWAY SERVING THE EXIT
 ENCLOSURE IN ACCORDANCE WITH FBCB 1019.1.2 AND 1020.5.
  
 4. M102C DETAIL 2: STAIR #1 ENCLOSURE 110 IS SHOWN WITH
 MULTIPLE DUCT PENETRATIONS OF THIS EXIT ENCLOSURE/EXIT
 PASSAGEWAY ON THE FIRST FLOOR. THIS AREA ALSO SHOWS A
 SUPPLY DUCT AND RETURN GRILL SERVING THE EXIT ENCLOSURE
 FROM VAV-1. THIS METHOD OF EXIT ENCLOSURE VENTILATION
 IS PROHIBITED. IF VENTILATION IS TO BE PROVIDED FOR
 THIS ENCLOSURE, IT SHALL BE PROVIDED IN ACCORDANCE WITH
 ONE OF THE THREE METHODS LISTED IN ACCORDANCE WITH FBCB
 1019.1.3. UNDER ANY OF THESE CONDITIONS, THE EXIT
 ENCLOSURE VENTILATION SYSTEM SHALL BE INDEPENDENT OF
 OTHER BUILDING VENTILATION SYSTEMS IN ACCORDANCE WITH
 THIS SECTION.
  
 5. M102C DETAIL 3: RELIEF AIR DUCT FROM 1ST FLOOR
 MECHANICAL ROOM CALLS FOR 24X12 WHILE DETAIL 5 CALLS
 FOR THIS SAME DUCT TO BE 20X12. WHICH IS CORRECT?
 PLEASE CLARIFY IN ACCORDANCE WITH FBCM 603.1 AND FBCB
 106.1.1.
  
 6. M102C DETAIL 1: EF #31 IN CORRIDOR 123 IS PROVIDING
 VENTILATION FOR THIS EXIT ENCLOSURE. THERE IS NO
 INDICATION ON PLANS WHAT THE SOURCE OF MAKEUP AIR WILL
 BE FOR THE 300 CFM OF EXHAUST. MECHANICAL VENTILATION
 SHALL BE PROVIDED BY A METHOD OF SUPPLY AIR AND RETURN
 OR EXHAUST AIR. THE AMOUNT OF SUPPLY AIR SHALL BE
 APPROXIMATELY EQUAL TO THE AMOUNT OF RETURN AND EXHAUST
 AIR IN ACCORDANCE WITH FBCM 403.1. ALSO, PLEASE SHOW
 THE SOURCE OF SUPPLY OR MAKEUP AIR TO BE IN COMPLIANCE
 WITH FBCM 401.4, 401.5 AND 401.6.
  
 7. M102C DETAIL 3: NOTE 17 CALLS FOR EF 30 TO BE
 MOUNTED VERTICALLY ON A WALL. THE ONLY INSTALLATION
 DETAIL FOUND IN PLANS FOR INLINE FANS IS FOR HORIZONTAL
 INSTALLATIONS. PROVIDE DETAIL SHOWING VERTICAL
 INSTALLATION, VIBRATION ISOLATION AND SUPPLEMENTAL
 RESTRAINT METHODS TO BE USED. EQUIPMENT AND APPLIANCES
 SHALL BE INSTALLED AS REQUIRED BY THE TERMS OF THEIR
 APPROVAL, IN ACCORDANCE WITH THE CONDITIONS OF THE
 LISTING, THE MANUFACTURER?S INSTALLATION INSTRUCTIONS
 AND THIS CODE IN ACCORDANCE WITH FBCM 304.1. WHERE
 VIBRATION ISOLATION OF EQUIPMENT AND APPLIANCES IS
 EMPLOYED, AN APPROVED MEANS OF SUPPLEMENTAL RESTRAINT
 SHALL BE USED TO ACCOMPLISH THE SUPPORT AND RESTRAINT
 IN ACCORDANCE WITH FBCM 301.10
  
 8. M102C DETAIL 5: MECHANICAL ROOM DETAIL AND
 CONDENSATE TRAP DETAIL SHOWS THE CONDENSATE FROM AHU 2
 DISCHARGING TO A FLOOR DRAIN. THIS DRAIN IS TIED TO THE
 SANITARY SEWER SYSTEM. AIR CONDITIONING CONDENSATE
 SHALL NOT DISCHARGE INTO THE SANITARY SEWER SYSTEM IN
 ACCORDANCE WITH LOCAL ORDINANCE ARTICLE 3 SECTION
 90-125(5). CONDENSATE FROM ALL COOLING COILS AND
 EVAPORATORS SHALL BE CONVEYED FROM THE DRAIN PAN OUTLET
 TO AN APPROVED PLACE OF DISPOSAL IN ACCORDANCE WITH
 FBCM 307.2.1. CONDENSATE SHALL NOT DISCHARGE INTO A
 STREET, ALLEY OR OTHER AREAS SO AS TO CAUSE A
 NUISANCE.
 NOTE: THESE REQUIREMENTS APPLY TO ALL CONDENSATE
 DISPOSAL SYSTEMS FROM ALL COOLING COILS. SHOW
 COMPLIANCE WITH THESE SECTIONS.
  
 9. M102C DETAIL 2: VAV #1 ON FLOOR PLAN CALLS FOR 355
 CFM OF SUPPLY. HOWEVER, EQUIPMENT SCHEDULE ON M106C
 CALLS FOR A MAXIMUM CFM OF 225 FOR THE SAME VAV. PLEASE
 COORDINATE FLOOR PLANS WITH EQUIPMENT SCHEDULES. AIR
 DISTRIBUTION SYSTEMS SHALL BE DESIGNED AND INSTALLED TO
 SUPPLY THE REQUIRED DISTRIBUTION OF AIR IN ACCORDANCE
 WITH FBCM 603.1.
  
 10. M102C: FLOOR PLAN SHOWS AHU #2 SERVING THE EMPLOYEE
 BREAK ROOM AND AHU #2 ALSO SERVING THE ADMIN AREA.
 THESE APPLIANCES APPEAR TO BE MISLABELED. THE AHU
 SERVING THE ADMIN AREA IS ATTACHED TO ACCU #1 AND THE
 AHU SERVING THE EMPLOYEE BREAK AREA IS ACTUALLY A
 PACKAGE UNIT. PLEASE COORDINATE FLOOR PLANS AND
 EQUIPMENT SCHEDULES, SHOWING ALL APPLIANCES PROPERLY
 LABELED IN RELATION TO THE AREAS BEING SERVED IN
 ACCORDANCE WITH FBCM 301.1, 304.11 AND FBCB 106.1.1.
  
 11. M104C: ROOF CURB DETAIL HAS NO INFORMATION
 REGARDING ATTACHMENT OF CURB TO STRUCTURE OR ATTACHMENT
 OF FAN TO ROOF CURB. MECHANICAL EQUIPMENT, APPLIANCES
 AND SUPPORTS THAT ARE EXPOSED TO WIND SHALL BE DESIGNED
 AND INSTALLED TO RESIST THE WIND PRESSURES ON THE
 EQUIPMENT AND THE SUPPORTS AS DETERMINED IN ACCORDANCE
 WITH FBCM 301.13. PROVIDE SUFFICIENT DETAIL WITH
 SUPPORTING WIND LOAD CALCULATIONS AS NEEDED (FOR
 BUILDING PLAN REVIEW) TO SHOW THE INSTALLATION OF ALL
 APPLIANCES AND DUCTWORK WHICH IS EXPOSED TO WIND IS
 SUFFICIENT TO RESIST ANTICIPATED WIND PRESSURES IN
 ACCORDANCE WITH THIS SECTION AND FBCB SECTION 1609.
 ALSO PROVIDE SUPPORTING DOCUMENTATION SHOWING OUTDOOR
 APPLIANCES THEMSELVES DESIGNED TO RESIST WIND
 PRESSURES. THIS INCLUDES ROOFTOP FANS AS WELL AS GROUND
 MOUNTED PACKAGE UNITS AND CONDENSING UNITS.
  
 12. M105C: THE RELIEF AIR DUCT WHICH IS SHOWN
 DISCHARGING ONTO THE RECYCLING FLOOR IS ALSO SHOWN
 ATTACHED TO THE RETURN AIR PLENUM OF AHU #1. ACCORDING
 TO THE SEQUENCE, DAMPERS ARE TO MODULATE BASED ON THE
 PRESSURE IN THE CONDITIONED SPACE TO ALLOW RELIEF AIR
 TO BE DISCHARGED. HOWEVER, THE RETURN AIR PLENUM WILL
 BE UNDER A CONSTANT NEGATIVE PRESSURE. THIS DESIGN WILL
 CAUSE THE RELIEF AIR DUCT TO ACT AS AN INTAKE DUCT,
 DRAWING AIR FROM THE RECYCLING FLOOR INTO THE ADMIN
 AREA. THIS DESIGN IS NOT IN COMPLIANCE WITH FBCM
 401.5.1, 403.2.1(1) AND FBCM 603.1. PLEASE SHOW A
 DESIGN WHICH IS CAPABLE OF ACHIEVING THE DESIGN INTENT
 AS DESCRIBED IN THE RELIEF AIR SEQUENCE OF OPERATIONS.
 ALSO, THE RELIEF AIR SEQUENCE CALLS FOR 3 DIFFERENT
 MODULATING DAMPERS TO BE OPENED IN STAGES. FLOOR PLANS
 AND CONTROL DIAGRAM ONLY SHOW ONE MOTORIZED DAMPER ON
 THE RELIEF AIR SYSTEM. PLEASE CLARIFY.
  
 13. OUTSIDE AIR: NO INFORMATION REGARDING THE REQUIRED
 RATES OF OUTSIDE AIR HAS BEEN PROVIDED. PLEASE PROVIDE
 OUTSIDE AIR CALCULATIONS SHOWING THE VENTILATION METHOD
 USED, SUCH AS FBCM TABLE 403.3, THE VENTILATION RATE
 METHOD OF AHSRAE 62.1-2004 OR THE IAQ METHOD OF ASHRAE
 62.1-2004 AS ALLOWED UNDER FBCM 403.4. PROVIDE
 SUPPORTING DOCUMENTATION AND/OR CALCULATIONS
 APPROPRIATE FOR THE METHOD USED IN ACCORDANCE WITH FBCM
 401.1. IT IS ACKNOWLEDGED THAT CO2 CONTROLS ARE SHOWN
 ON THE VAV SEQUENCE, BUT THE REQUIRED RATES OF
 VENTILATION FOR THE SPACES BEING SERVED ARE NOT
 PROVIDED ON PLANS. ALSO, THE EMPLOYEE BREAK ROOM IS NOT
 SERVED BY A VAV SYSTEM AND IS THEREFORE NOT ACCOUNTED
 FOR IN THIS SEQUENCE.
  
 14. REHEAT: THE CO2 CONTROL SEQUENCE CALLS FOR ELECTRIC
 REHEAT OF VAV SYSTEMS WHEN OUTSIDE AIR IS REQUIRED TO
 PREVENT OVER-COOLING. REHEATING OR THE SIMULTANEOUS
 OPERATION OF THE HEATING AND COOLING SYSTEMS TO THE
 SAME ZONE ARE PROHIBITED IN ACCORDANCE WITH FBCB
 13-407.1.ABC.2.1.1. IF REHEAT IS TO BE USED, PLEASE
 PROVIDE DOCUMENTATION SHOWING AT LEAST ONE OF THE
 EXCEPTIONS UNDER THIS SECTION HAS BEEN SATISFIED.
  
 15. ENERGY: ENERGY CALCULATIONS WERE NOT PROVIDED WITH
 THIS APPLICATION FOR PERMIT. PROVIDE A COMPLETED ENERGY
 CODE COMPLIANCE FORM IN ACCORDANCE WITH FBCM 301.2 AND
 FBCB 13-101.1.1. ALSO, COOLING LOAD CALCULATIONS SHALL
 BE APPENDED TO THE ENERGY CODE COMPLIANCE FORM IN
 ACCORDANCE WITH FBCB 13-407.1.ABC.1. AUDIT FOR
 COMPLIANCE WITH THE REQUIREMENTS OF FBCB CHAPTER 13 CAN
 NOT BE PERFORMED AT THIS TIME.
  
 16. THIS PERMIT APPLICATION WAS SUBMITED UNDER THE
 PRIVATE PROVIDER PROVISIONS OF FS 553.791. AS SUCH THE
 FOLLOWING REQUIREMENTS HAVE NOT BEEN SATISFIED:
 A) A NOTICE TO BUILDING OFFICIAL HAS NOT BEEN PROVIDED
 AS REQUIRED UNDER FS 553.791(4).
 B) PLANS FOR THE "SORT ENCLOSURE" AIR CONDITIONING
 SYSTEMS HAVE BEEN SUBMITTED AS SHOP DRAWINGS, BUT THEY
 ARE ACTUALLY SIGNED AND SEALED PLANS BY THE DESIGNER OF
 RECORD FOR THIS PROJECT. EITHER WAY, THESE PLANS WERE
 NOT STAMPED AS REVIEWED AND NO AFFIDAVIT WAS PROVIDED
 FOR THESE PLANS BY THE PRIVATE PROVIDER AS REQUIRED
 UNDER FS 553.791(6). THESE PLANS WILL NOT BE AUDITED
 PRIOR TO REVIEW AND SUBMISSION OF AFFIDAVIT BY THE
 PRIVATE PROVIDER.
  
 PLEASE RESPOND TO EACH COMMENT IN WRITING WITH A
 DETAILED EXPLANATION OF HOW EACH COMMENT HAS BEEN
 ADDRESSED AS WELL AS WHERE THE SUPPORTING INFORMATION
 CAN BE FOUND. ALSO, PLEASE RETURN ONE OLD/VOIDED SET OF
 PLANS FOR REFERENCE. THESE STEPS WILL ASSIST IN A
 TIMELY AUDIT OF RESUBMITTED PLANS.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved