Plan Review Notes
Plan Review Notes For Permit 08070253
Permit Number 08070253
Review Stop B
Sequence Number 2
Notes
Date Text
2008-07-18 15:09:51****CORRECTIONS****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724 [email protected]
  
 FBCFLORIDA BUILDING CODE 2004
 FBC EBFLORIDA BUILDING CODE 2004 EXISTING BUILDING
 CODE
 FBC RFLORIDA BUILDING CODE 2004 RESIDENTIAL FBC*
 CITY OF WEST PALM BEACH AMENDMENTS TO THE FBC2004
  
 FAC FLORIDA ADMINISTRATIVE CODE
 FSFLORIDA STATUTE
  
  
 1.THE WIND DESIGN CALCULATIONS ARE TO BE IN
 ACCORDANCE WITH ASCE7-02, SEE FBC R 43.
  
 2.THE APPLICATION STATES THAT THE ROOF IS 3/12, THE
 CALCULATIONS ARE FOR A 5/12 ROOF, BUT THE
 ENGINEER/CONTRACTOR COMPLETED BOTH DOCUMENTS.PLEASE
 CHECK ALL PAPERWORK SUBMITTED FOR ERRORS.
  
 3.SEE FBC61G15-23.002, TITLE BLOCK REQUIRED ON EACH
 SIGNED, SEALED AND DATED SHEET.FOR CALCULATIONS, AN
 INDEX SHEET MUST BE USED OR EACH SHEET SIGNED AND
 SEALED.
  
 4.PLEASE CONTACT FBPE REGARDING TWO ISSUES:
  
 AS DISCUSSED, YOU STATED THAT YOU APPLIED FOR A
 CERTIFICATE OF AUTHORIZATION OVER SIX WEEKS AGO.I
 SPOKE WITH AMANDA, AND THEY DO NOT HAVE RECORD OF THIS
 APPLICATION AND IT ALSO DOES NOT APPEAR ON THE
 INTERNET, WWW.MYFLORIDALICENSE.COM.IN ORDER TO GET
 THIS ISSUE OFF OF MY DESK, I HAVE SENT IT TO FBPE WITH
 A COMPLIANT FORM, ESPECIALLY AS YOU HAD BEEN TOLD ON
 NUMEROUS OCCASIONS THAT THIS WAS REQUIRED, YOU AGREED,
 AND SAID THAT YOU HAD ALREADY APPLIED.AS I AM GETTING
 TWO DIFFERENT STORIES, PLEASE RESOLVE THIS WITH FBPE.
  
 PLEASE ASK FBPE IF YOU CAN DO THIS ENGINEERING AS AN
 INDIVIDUAL WITHOUT A COFA, AS THE CONTRACT/APPLICATION
 IS WITH THE ENGINEERING COMPANY.THIS IS A LEGAL ISSUE
 ON WHICH I PREFER NOT TO MAKE ANY DETERMINATIONS. THE
 USUAL SITUATION IS THAT AN ENGINEERING COMPANY DOES NOT
 HAVE A COFA, AND PERMIT DOCUMENTS WHICH ARE NOT IN
 COMPLIANCE WITH THE FLORIDA STATUTES ARE NOT ACCEPTED
 FOR PERMITTING.YOUR SITUATION DIFFERS IN THAT THE
 ENGINEERING COMPANY DOES NOT APPEAR ON THE PERMIT
 DOCUMENTS, BUT THE PERMIT APPLICATION IS FROM THE
 ENGINEERING COMPANY.PLEASE HAVE FBPE PROVIDE AN EMAIL
 OR LETTER STATING THAT IT IS ACCEPTABLE FOR YOU TO BE
 TAKING CONTRACTS UNDER A & F ENGINEERING INC. AND
 SIGNING AND SEALING AS DAVID FORKEY, PE.I ASSUME THAT
 YOU HAVE ALREADY DISCUSSED THIS ISSUE WITH THEM THE
 FIRST TIME YOU CALLED.
  
 AS INFORMED PREVIOUSLY, I DO NOT BELIEVE THAT THE
 VIOLATION OF FS471.023 CAN PREVENT A PERMIT FROM BEING
 ISSUED, BUT I DO NOT BELIEVE THAT I CAN ACCEPT
 ENGINEERING FROM THIS COMPANY UNTIL A COFA IS ISSUED.
 THIS WAS NOT ON THE FIRST COMMENT LIST BECAUSE DAVID
 FORKEY HAD INFORMED ME THAT THE APPLICATION WAS IN
 PROGRESS, AND I WAS WAITING FOR A RETURN CALL FROM
 FBPE.
  
 5.AS I MUST PROVIDE THEM WITH THE PERMIT
 APPLICATIONS, THE OTHER NONCOMPLIANCE ISSUES WILL BE
 INCLUDED IN THE COMPLAINT (PHOTOCOPY ENGINEERING
 SUBMITTED FOR PERMITTING, LACK OF A DATE FOR THE SEAL,
 LACK OF TITLE BLOCK, WRONG ENGINEERING STANDARD USED
 FOR WIND DESIGN).THIS IS ADVISORY.
  