2008-08-04 14:58:18REVIEW #: 1ST **PLAN CHECK ONLY**
 ACTION: DENIED
  
 REVIEWED FOR COMPLIANCE WITH:
 FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 1. PG A-3: PROPOSED THIRD FLOOR/ROOFTOP DECK PLAN CALLS
 FOR ONE OR POSSIBLY MORE MECHANICAL VENTILATION SHAFTS
 WITH A NOTE TO ?SEE MECHANICAL PLANS.? NO INFORMATION
 COULD BE FOUND ON MECHANICAL PLANS REGARDING SIZE,
 ROUTING OR DESIGN OF THE DUCTS IN THESE SHAFTS. PROVIDE
 MISSING INFORMATION AS TO THE FUNCTION AND DESIGN OF
 THESE SHAFTS IN ACCORDANCE WITH FBCM 501.1 AND FBCB
 106.1.1. THE ROOFTOP UNITS BEING SERVED BY THESE SHAFTS
 ARE DESIGNED FOR OUTDOOR INSTALLATION AND FREE AIRFLOW.
 PROVIDE DATA FROM THE MANUFACTURER SHOWING THAT THESE
 MODIFICATIONS (ADDITION OF DUCTWORK TO THE DISCHARGE
 SIDE OF THE CONDENSING FANS FOR THE PURPOSE OF
 AIR-COOLING THE CONDENSING COILS) TO THE DESIGN AND
 LISTING OF THESE APPLIANCES WILL NOT ADVERSELY AFFECT
 THE FUNCTIONALITY OR THE EFFICIENCY OF THESE APPLIANCES
 IN ACCORDANCE WITH FBCM 304.1 AND FBCM 301.2.
  
 2. PG M-1 AND M-2: PLAN CALLS FOR EXTENSION OF KITCHEN
 EXHAUST DUCT FROM EXISTING ROOF TO NEW ROOF. THERE IS
 NO DETAIL FOR THE INSTALLATION OF (ASSUMED TO BE)
 GREASE EXHAUST DUCT AND EXHAUST FAN ON NEW ROOF SHOWING
 COMPLIANCE WITH THE FOLLOWING:
 - FBCM 301.13 FOR WIND RESISTANCE.
 - FBCM 506.3.12.1, 506.3.12.3 AND ALL PORTIONS OF 506.5
 FOR CLEARANCES, LOCATION AND HEIGHT ABOVE ROOF.
 - FBCM 401.5 FOR INTAKE AND EXHAUST LOCATIONS.
 - FBCM 304.10 IF LESS THAN 10 FEET FROM THE ROOF EDGE.
 - FBCM 306.5 FOR SERVICE ACCESS.
 - FBCM 301.4.4 EQUIPMENT, APPLIANCES AND DEVICES SHALL
 NOT BE REUSED UNLESS SUCH ELEMENTS HAVE BEEN
 RECONDITIONED, TESTED AND PLACED IN GOOD AND PROPER
 WORKING CONDITION AND APPROVED.
 NOTE: ONCE THE EXISTING KITCHEN EXHAUST SYSTEM IS
 MODIFIED IN ANY WAY, THE SYSTEM WILL NEED TO BE TESTED,
 BALANCED AND RE-CERTIFIED TO DEMONSTRATE COMPLIANCE
 WITH THE REQUIREMENTS OF THE KITCHEN HOOD LISTING
 AND/OR THE REQUIREMENTS OF FBCM 506 AND 507.
  
 3. PG M-1: PLAN INDICATES OUTSIDE AIR CALCULATIONS ARE
 BASED ON ASHRAE 62-1999. THIS IS NOT THE CURRENT
 STANDARD ADOPTED UNDER THE 2004 FBCM. SHOW OUTSIDE AIR
 CALCULATIONS FOR THE INDOOR CONDITIONED SPACE TO BE
 CALCULATED BASED ON FBCM TABLE 403.3 OR ASHRAE
 62.1-2004. PROVIDE OCCUPANCY CLASSIFICATION, OCCUPANT
 LOAD, OUTSIDE AIR REQUIRED AND OUTSIDE AIR PROVIDED IN
 ACCORDANCE WITH THE METHOD TO BE DECLARED ON THE PLANS.
  
  
 4. PG M-1: THE O.A. INTAKE FOR THE NEW AHU #1 SHALL BE
 EQUIPPED WITH A MOTORIZED DAMPER THAT WILL
 AUTOMATICALLY SHUT WHEN THE SYSTEM OR SPACE SERVED IS
 NOT IN USE IN ACCORDANCE WITH FBCB 13-409.1.ABC.3.3 FOR
 SHUTOFF DAMPER CONTROLS.
  
 5. PG M-1: AHU-1 APPEARS TO BE LOCATED ABOVE A GYPSUM
 BOARD CEILING. APPLIANCES SHALL BE ACCESSIBLE TO ALLOW
 INSPECTIONS, SERVICE, REPAIR OR REPLACEMENT WITHOUT
 REMOVING ELEMENTS OF PERMANENT CONSTRUCTION IN
 ACCORDANCE WITH FBCM 306.1. SHOW HOW THIS APPLIANCE IS
 TO BE ACCESSED FOR SERVICE OR REPLACEMENT IN ACCORDANCE
 WITH THIS SECTION.
  
 6. PG M-1: BATHROOM EXHAUST DUCTS ARE SHOWN ON PLANS TO
 BE 3? X 10. THE FAN FOR THIS SYSTEM IS CALLING FOR 300
 CFM OF EXHAUST. IS THIS DUCT PROPERLY SIZED TO MOVE 300
 CFM OF EXHAUST? PLEASE VERIFY, VIA DUCT SIZING
 CALCULATOR OR SOME STANDARD ENGINEERING PRACTICE. DUCT
 SYSTEMS SHALL BE DESIGNED TO PROVIDE THE REQUIRED
 VOLUME OF AIR IN ACCORDANCE WITH FBCM 603.1.
  
 7. PG M-2: THE EXISTING ROOFTOP PACKAGE UNITS HAVE
 OUTSIDE AIR INTAKES TO PROVIDE VENTILATION FOR THE
 SPACES SERVED BY THESE SYSTEMS. WITH THE ADDITION OF A
 NEW FLOOR ABOVE THESE UNITS, THE INTAKES ARE NO LONGER
 LOCATED OUTSIDE THE BUILDING. THEREFORE, THE OUTSIDE
 AIR INTAKES SHALL BE DUCTED TO THE EXTERIOR OF THE
 BUILDING. ANY EXHAUST FANS OR OUTLETS IN THIS AREA
 SHALL ALSO DISCHARGE DIRECTLY TO THE EXTERIOR OF THE
 BUILDING. SHOW COMPLIANCE WITH ALL PARTS OF FBCM 401.5
 FOR INTAKE AND EXHAUST LOCATIONS.
  
 8. PG M-2: PROVIDE MANUFACTURER?S DATA FOR THE PROPOSED
 NEW CONDENSING UNITS FOR THE SPLIT SYSTEMS SHOWING THE
 INSTALLATION IN A LOCATION OTHER THAN OUTDOORS TO BE IN
 ACCORDANCE WITH MANUFACTURER?S INSTALLATION
 INSTRUCTIONS AND LISTING PER FBCM 304.1.
  
  
 9. PG M-2: PROVIDE DETAILED INSTALLATION INSTRUCTIONS
 FOR THE RELOCATED RTU IN ACCORDANCE WITH FBCM 304.1.
 ALSO, EQUIPMENT AND APPLIANCES SHALL NOT BE REUSED
 UNLESS SUCH ELEMENTS HAVE BEEN RECONDITIONED, TESTED
 AND PLACED IN GOOD AND PROPER WORKING CONDITION AND
 APPROVED BY THE BUILDING OFFICIAL IN ACCORDANCE WITH
 FBCM 301.4.4.
  
 10. PROVIDE AN ENERGY CODE COMPLIANCE FORM WITH
 APPENDED COOLING LOAD CALCULATIONS FOR REVIEW. CODE
 COMPLIANCE FOR ALL BUILDINGS SHALL BE CERTIFIED BY USE
 OF APPROVED FORMS FOR THE COMPLIANCE METHOD CHOSEN THAT
 ARE SPECIFIC TO THE CLIMATE ZONE IN WHICH THE BUILDING
 WILL BE LOCATED IN ACCORDANCE WITH FBCB 13-103.0.
 ADDITIONS TO EXISTING COMMERCIAL BUILDINGS ARE
 CONSIDERED NEW BUILDING CONSTRUCTION AND SHALL COMPLY
 WITH FBCB SUBCHAPTER 13-4 OF THIS CODE AS ALLOWED IN
 SECTION 101.1.1 IN ACCORDANCE WITH FBCB 13-101.1.2.
 COOLING LOAD CALCULATIONS SHALL BE APPENDED TO THE
 ENERGY CODE COMPLIANCE FORM IN ACCORDANCE WITH FBCB
 13-407.1.ABC.1.
  
 PLEASE RESPOND TO EACH COMMENT IN WRITING WITH A
 DETAILED DESCRIPTION OF HOW EACH COMMENT WAS ADDRESSED
 AS WELL AS WHERE THE RELEVANT INFORMATION CAN BE FOUND.
 ALSO, PLEASE PROVIDE ONE SET OF OLD/VOIDED PLANS FOR
 REFERENCE. THESE STEPS WILL AID IN PROVIDING A TIMELY
 REVIEW OF THE RESUBMISSION.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved