| 2008-12-30 13:07:46 | |
| | |
| | BUILDING PLAN REVIEW |
| | PERMIT: 08070195 |
| | ADD: 2000 6 AE ISAACS AVE |
| | CONT: NEWBOLD CONST. |
| | TEL: (561)842-0033 |
| | FL BLD CODE= 2004 FLORIDA BUILDING CODE |
| | W/ 2007 FBC REVISIONS |
| | * WEST PALM BEACH AMENDMENTS0 |
| | |
| | 12-29-08 |
| | REVIEW: 2ND |
| | ACTION: DENIED |
| | |
| | **NOTE: SHEET D1 WHICH SHOWED THE EXISTING FLOOR PLAN |
| | AND ALL AREAS TO BE DEMOED WAS NOT RESUBMITTED ALONG |
| | WITH SHEET A2. AN EXISTING AND A PROPOSED PLAN ARE |
| | REQUIRED TO SHOW ALL CHANGES TO THE LAYOUT OF THE |
| | EXISTING BUILDING.** |
| | |
| | 1) WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION |
| | & REMOVE & REPLACE ANY PAGES AS NECESSARY. A |
| | TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW COMMENT |
| | NUMBER, WITH A DESCRIPTION OF THE REVISION MADE, |
| | IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE THE |
| | CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR PERMIT. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | 2) OK |
| | 3) OK |
| | 4) OK |
| | 5) OK |
| | |
| | 6) SHEET A1 SHOWS TWO NEW WINDOW OPENINGS AT THE NORTH |
| | ELEVATION, HOWEVER SHEET A2 SHOWS THREE WINDOWS. WILL |
| | THERE BE THREE OR TWO WINDOWS. THE SOUTH ELEVATION ON |
| | SHEET D1- A1 AND A2 HAVE CONFLICTING INFORMATION AS TO |
| | HOW MANY WINDOWS WILL BE CHANGED OUT. WHAT TYPES OF |
| | WINDOWS ARE INSTALLED AT THIS LOCATION? REMEMBER AN |
| | EXISTING BUILDING OR PORTION THEREOF SHALL NOT BE |
| | ALTERED SUCH THAT THE BUILDING BECOMES LESS SAFE OR |
| | ENERGY EFFICIENT THAN ITS EXISTING CONDITION. FBC |
| | (EXISTING) 501.2. |
| | |
| | **NO RESPONSE NOT ADDRESSED** |
| | 7) 106.3.3* PRODUCT APPROVALS- 2004THOSE PRODUCTS THAT |
| | ARE REGULATED BY DCA RULE 9B-72 SHALL BE REVIEWED AND |
| | APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR TO |
| | SUBMITTAL FOR JURISDICTIONAL APPROVAL. PROVIDE PRODUCT |
| | APPROVAL FOR THE NEW GLASS BLOCK. SHEET A4 GLASS BLOCK |
| | DETAIL FAILS TO STATE THE TYPE OF GLASS UNIT, THE SIZE, |
| | THE LATERAL AND VERTICAL SUPPORT. THE HEADER ABOVE THE |
| | GLASS UNITS SHOWS A BLOCK WALL. GLASS UNIT MASONRY |
| | PANELS SHALL BE ISOLATED SO THAT IN-PLANE LOADS ARE NOT |
| | IMPARTED ON THE UNITS FBC 2110.4.1. THE DETAIL SHALL |
| | STATE THE VERTICAL AND LATERAL SUPPORTS FBC 2110.4.3. |
| | PLEASE SEE SECTION 2110.7 FOR INFORMATION REGARDING THE |
| | REINFORCEMENT OF THE GLASS UNITS. FOR ADDITIONAL |
| | INFORMATION SEE SECTION FBC 2110. IF THE GLASS BLOCK |
| | UNITS ARE NOT IMPACT RESISTANT, IMPACT PROTECTION SHALL |
| | BE PROVIDED FBC 1609.1.4. PROVIDE PRODUCT APPROVAL FOR |
| | THE HURRICANE PROTECTION (SHUTTERS). |
| | |
| | 8) OK |
| | |
| | **NO RESPONSE NOT ADDRESSED** |
| | 9) SHEET A1, THE WALL LEGEND INDICATES THAT A PORTION |
| | OF THE EXISTING STRUCTURE WILL BE CONSTRUCTED WITH 4 |
| | INCH WOOD STUDS; IF THAT IS THE CASE INDICATE THE |
| | EXTERIOR WALL COVERINGS WITH A COMPLETE ELEVATION WALL |
| | DETAIL SHOWING ALL MATERIALS. THE WALL LEGEND HAS NO |
| | SYMBOL FOR THE NEW CONSTRUCTED WALLS. IF SOME WALLS ARE |
| | DIFFERENT IN SIZE LIKE THE ONE SEPARATING THE BATHROOMS |
| | AT THE DRESSING ROOMS; INDICATE THE SIZE OF THE WALL |
| | AND THE MATERIALS TO BE USED ON THE WALL DETAIL SHEET |
| | A3. ADDITIONAL INFORMATION IS REQUIRED 106.1.2 |
| | |
| | **SEE THE CODE SECTIONS MENTION BELOW AND SHOW |
| | COMPLIANCE** |
| | 10) THE ACCESSIBLE BATHROOMS NEED TO BE IN COMPLIANCE |
| | WITH SECTION FBC 11-4.16 / 11-4.17 / 11-4.18 AND |
| | 11-4.19. THE GRAB RAILS FOR THE BATHROOM SHOWN ON THE |
| | FLOOR PLAN DO NOT MATCH THE ONE ON THE DETAIL SHEET. |
| | SEE NOTES ON PLANS AND MAKE THE REQUIRED CHANGES. |
| | |
| | **NOTED; HOWEVER, THE NEW DETAIL ON SHEET A1 FOR THE |
| | STAIRS FAIL TO CLEARLY SHOW THE RISE AND TREAD DEPTH OF |
| | THE STAIRS... |
| | 11) SHEET D1 INDICATES THE ALTERATION TO THE EXISTING |
| | EXTERIOR STAIRS AT THE SOUTH ELEVATION; HOWEVER, NO |
| | CONSTRUCTION DETAIL IS PROVIDED SHOWING THE SIZE OF THE |
| | TREADS AND RISERS. THE STAIRS SHALL BE IN COMPLIANCE |
| | WITH FBC 1009 AND 11-4.9. SHEET A3 SOUTH ELEVATION |
| | HANDRAIL SHALL BE IN CONFORMANCE WITH FBC 1012.3, SUCH |
| | THAT A 4 INCH DIAMETER SPHERE CANNOT PASS THROUGH ANY |
| | OPENING UP TO A HEIGHT OF 34 INCHES. SHOW THE DIMENSION |
| | BETWEEN THE LANDING AND THE BOTTOM OF THE RAIL. |
| | |
| | **NO RESPONSE NOT ADDRESSED** |
| | 12) THE DRAWINGS NEED TO SHOW THE HEAD AND SILL DETAIL |
| | FOR THE NEW OPENINGS. PROVIDE THE FRONT ELEVATION |
| | DETAIL FOR THE NEW OPENINGS. |
| | |
| | MYRON JACOBS |
| | BUILDING PLAN REVIEWER |
| | (561)805-6726 |
| | [email protected] |
| | |