Plan Review Notes
Plan Review Notes For Permit 08060313
Permit Number 08060313
Review Stop E
Sequence Number 2
Notes
Date Text
2008-10-14 16:56:44 
  
  
 THIS REVIEW WAS DONE UNDER THESE CURRENT CODE
 CYCLES:
  
 THE 2004 FLORIDA BUILDING CODE, 2007 REVISIONS, 2005
 NEC, NFPA-72 2002, NFPA-101 2003, 2004 FBC CHAPTER 1 AS
 AMENDED AND FOUND NONCOMPLIANT WITH THE FOLLOWING:
  
  
 1} INDICATE HOW THE BUILDING IS BEING FED AND FROM
 WHERE. FEEDER SIZES AND OCP ARE REQUIRED FOR
 REVIEW.215.5 NEC*** A RISER DIAGRAM IS REQUIRED PER
 THIS ARTICLE TO COMPLY WITH THIS COMMENT..
  
 2} 250.32 BUILDINGS OR STRUCTURES SUPPLIED BY FEEDER(S)
 OR BRANCH CIRCUIT(S)
 (A) GROUNDING ELECTRODE BUILDING(S) OR STRUCTURE(S)
 SUPPLIED BY FEEDER(S) OR BRANCH CIRCUIT(S) SHALL HAVE A
 GROUNDING ELECTRODE OR GROUNDING ELECTRODE SYSTEM
 INSTALLED IN ACCORDANCE WITH 250.50. THE GROUNDING
 ELECTRODE CONDUCTOR(S) SHALL BE CONNECTED IN ACCORDANCE
 WITH 250.32(B) OR (C). WHERE THERE IS NO EXISTING
 GROUNDING ELECTRODE, THE GROUNDING ELECTRODE(S)
 REQUIRED IN 250.50 SHALL BE INSTALLED.*** THIS COMMENT
 CAN ALSO BE RESPONDED TO WITH A RISER DIAGRAM, BUT
 CANNOT BE A RESPONSE ON THE COMMENT SHEET (WHICH IS NOT
 PRINTED OUT CORRECTLY, SEE COMMENT #2 ON THE RES SHEET
 AND COMMENT #2 ON THE ORIGINAL COMMENT SHEET) THE RISER
 DIAGRAM MUST BE DRAWN AND SUBMITTED AS PART OF THE
 CONSTRUCTION DOCUMENTS. THE ELECTRICAL CONTRACTOR MAY
 DRAW THESE UNDER THE EXEMPTIONS OF FS 471..
  
 3} NEW COMMENT THAT WAS NOT MADE IN THE PREVIOUS
 REVIEW.***THE ENGINEER WHOSE NAME APPEARS ON THE TITLE
 BLOCK MUST SIGN, DATE AND SEAL THE DOCUMENT.
 61G15-23.002 FAC.
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLANS EXAMINER
 CITY OF WEST PALM BEACH
 561/805-6718