| Date |
Text |
| 2008-09-10 09:13:01 | GAS PLAN REVIEW: |
| | DENIED **2ND TIME: |
| | |
| | PLAN REVIEW UNDER THE 2004 FLORIDA BUILDING CODES WITH |
| | 2007 REVISIONS, CITY OF WEST PALM BEACH AMENDMENTS TO |
| | CHAPTER 1 (W.P.B.), FLORIDA ADMINISTRATIVE CODE |
| | (F.A.C.), AND FLORIDA STATUTES (F.S.). |
| | |
| | **THE FOLLOWING COMMENTS ARE NUMBERED TO CORRESPOND |
| | WITH THE PREVIOUS GAS PLAN REVIEW COMMENTS AS WELL AS |
| | TE DESIGNER'S RESPONSES FOR THE PURPOSE OF CONTINUITY. |
| | NEW COMMENTS WILL BE SO NOTED FOLLOWING THE PREVIOUS |
| | REVIEW COMMENTS. |
| | |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS. PER FBC- |
| | FUEL GAS CODE SECTION 401.1 SCOPE. |
| | NOTE: THERE WERE NO CORRESPONDING LENGTHS FOR THE CUT |
| | SECTIONS OF PIPE INDICATED ON GAS ISOMETRIC DRAWING. |
| | |
| | **NO COMMENT RESPONSE FROM THE DESIGNER AND THE COMMENT |
| | WAS NOT ADDRESSED. THE RESUBMITTED GAS ISOMETRIC STILL |
| | DOES NOT INDICATE CORRESPONDING LENGTHS TO ALL CUT |
| | SECTIONS OF PIPE. THE ONLY CUT SECTIONS OF PIPE WITH |
| | CORRESPONDING LENGTHS BEING INDICATED IS THE |
| | UNDERGROUND PE PIPING. WHAT ARE THE CORRESPONDING |
| | LENGTHS TO THE ABOVE GROUND PIPING? PER SECTION 401.1 |
| | SCOPE. |
| | |
| | 2. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. PER FBC- FUEL GAS |
| | CODE SECTION 401.1 SCOPE. |
| | NOTE: THE ONLY PIPING MATERIAL INDICATED WAS FOR THE |
| | UNDERGROUND PIPING. WHAT IS THE PIPING MATERIAL FOR THE |
| | ABOVE GROUND? |
| | |
| | **NO COMMENT RESPONSE FROM THE DESIGNER AND THE COMMENT |
| | WAS PARTIALLY ADDRESSED. WHAT IS THE TYPE AND SIZE OF |
| | THE PIPING MATERIAL OF THE ABOVE GROUND PIPING AT THE |
| | METER LOCATION? PER SECTION 401.1 SCOPE. |
| | |
| | 3. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4). |
| | NOTE: REFERENCE COMMENT #1 AND COMPLY. |
| | |
| | **NO COMMENT RESPONSE FROM THE DESIGNER AND COMMENT WAS |
| | NOT ADDRESSED. PLEASE REFERENCE COMMENT #1 AND COMPLY. |
| | |
| | 4. NOTE: ALL PLANS, SPECIFICATIONS, AND ACCOMPANYING |
| | DATA BEING FILED FOR PUBLIC RECORD SHALL CONTAIN THE |
| | PRINTED NAME OF THE RESPONSIBLE PERSON WITH THE |
| | ORIGINAL SIGNATURE AND DATE ON SUCH INFORMATION. PER |
| | SECTION *106.3.4.3. |
| | IF THE DESIGN PROFESSIONAL IS AN ARCHITECT OR ENGINEER, |
| | THEN HE OR SHE SHALL AFFIX HIS OR HER OFFICIAL SEAL, |
| | SIGNATURE AND DATE TO SAID DRAWINGS, PER FLORIDA |
| | STATUTES 481 AND 471 RESPECTIVELY. |
| | NOTE: SUBMITTED GAS ISOMETRIC HAS NO SIGNATURES. |
| | |
| | **NO COMMENT RESPONSE FROM THE DESIGNER AND COMMENT WAS |
| | NOT ADDRESSED. THE RESUBMITTED GAS ISOMETRIC DRAWINGS |
| | DO NOT HAVE ANYONE TAKING RESPONSIBILITY FOR THEM. THE |
| | PRINTED NAME WITH THE ORIGNAL SIGNATURE OF THE PERSON |
| | TAKING RESPOSIBILITY FOR THE ISOMETRIC IS STILL |
| | REQUIRED. PER (W.P.B. AS AMENDED) SECTION 106.3.4.3. |
| | |
| | **THE FOLLOWING ARE NEW COMMENTS DUE TO THE RESUBMITTAL |
| | PACKAGE AND NEW GAS ISOMETRIC. |
| | |
| | 5. THERE ARE TWO DIFFERENT GENERATOR MANUFACTURE |
| | SPECIFICATION SHEETS MAKE AND MODEL NUMBERS WITH |
| | DIFFERENT BTU LOAD CAPACITIES IN THE RESUBMITTAL. |
| | PLEASE KNOW THAT THIS IS CONFUSING AND UNACCEPTABLE. A |
| | GENERAC MODEL QT030 WITH A BTU CAPACITY OF 525,000 AND |
| | A GAURDIAN MODEL #5219 WITH A 412,000 BTU CAPACITY IS |
| | IN THE RESUBMITTAL. PLEASE CORRELATE THE RESUBMITTAL |
| | WITH ONLY ONE MAKE AND MODEL OF GENERATOR MANUFACTURE |
| | SPECIFICATIONS. PER FBC-2004 FUEL GAS SECTION 401.1 |
| | SCOPE. |
| | |
| | 6. SUBMIT TWO COPIES OF MANUFACTURE SHEETS FOR THE MP |
| | REGULATORS (2ND STAGE REGULATORS) TO VERIFY COMPLIANCE |
| | WITH STANDARDS NFPA 54, NFPA 58, AND THE FBC-2004 FUEL |
| | GAS CODE SEC 402.2. THE MANUFACTURE SHEETS SHALL |
| | CLEARLY INDICATE THE MP REGULATORS MAKE, MODEL NUMBER, |
| | BTU LOAD CAPACITY, AND A LISTING FROM A NATIONALLY |
| | RECOGNIZED TESTING LABORATORY (LISTING EXAMPLES= AGA, |
| | CSA, UL). |
| | |
| | ********IMPORTANT INFORMATION******** |
| | WHEN RESUBMITTING PLANS, PLEASE PROVIDE A COPY OF THE |
| | OLD PLANS, CLEARLY INDICATE THE REVISION ON THE NEW |
| | PLANS, REMOVE AND REPLACE ANY PAGES AS NECESSARY. A |
| | TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW COMMENT |
| | NUMBER, WITH A DESCRIPTION OF THE REVISION MADE, |
| | IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR PERMIT. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY: MIKE PERSON |
| | PLUMBING PLANS EXAMINER |
| | PHONE= (561) 805-6730 |
| | FAX= (561) 805-6731 |