| Plan Review Notes For Permit 08050546 |
| Permit Number |
08050546 |
|
| Review Stop |
L |
| Sequence Number |
6 |
|
| Notes |
| Date |
Text |
| 2009-09-08 16:55:20 | ***LANDSCAPE REVIEW FAILED*** | | | | | | 1. ENGINEERING MUST APPROVE CHANGES TO DRIVEWAY AND | | | OTHER HARDSCAPE PRIOR TO LANDSCAPE APPROVAL. | | | | | | 2. THERE ARE DIFFERENCES BETWEEN THE SITE AND LANDSCAPE | | | PLANS REGARDING THE HARDSCAPE. THE WALKWAYS ON THREE | | | SIDES OF BUILDING, AS WELL AS THE AIR CONDITIONING AND | | | OTHER CONCRETE PADS ALONG THE WEST SIDE OF THE HOME ARE | | | NOT THE SAME ON BOTH PLANS. ALL PLANS SHALL BE | | | CONSISTENT. | | | | | | 3. PURSUANT TO SECTION 94-482 (A), REQUIRED PARKING MAY | | | BE LOCATED IN A FRONT YARD; HOWEVER, THE LESSER OF 1000 | | | SQUARE FEET OR 75 PERCENT OF THE FRONT YARD AREA MUST | | | BE LANDSCAPED. PLEASE PROVIDE DATA THAT DEMONSTRATES | | | COMPLIANCE WITH THIS SECTION. | | | | | | 4. PURSUANT TO SECTION 18-209 (L), EVERY OWNER OF A | | | VACANT BUILDING, STRUCTURE OR LOT, SHALL PROVIDE AND | | | MAINTAIN ALL UNPAVED AREAS OF THE SITE WITH GRASS, | | | GROUND COVER, SHRUBBERY OR OTHER SUITABLE PLANT | | | MATERIAL. THIS APPLIES TO THE BALANCE OF THE | | | UNDEVELOPED SITE. | | | | | | 5. THE PERIMETER LANDSCAPING FOR THE ENTIRE SITE SHALL | | | BE INSTALLED AND INSPECTED WITH UNIT #3. THIS WAS | | | AGREED UPON DURING THE INITIAL REVIEW PROCESS. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ROBERT | | | KUSSNER @ (561) 822-1462. | | | |
|