Plan Review Notes
Plan Review Notes For Permit 08050249
Permit Number 08050249
Review Stop ENG
Sequence Number 1
Notes
Date Text
2008-05-28 09:29:41FAILED FOR THE FOLLOWING REASONS:
  
 WE MAY PROVIDE A PROVISO IF YOU DO PROVIDE/MEETFIRST
 3 NOTES OF THE FOLLOWING NOTES. YOU CAN PROVIDE ITEM
 NOTES #4 THRU 10 LATER WHEN YOU APPLY FOR FULL BUILDING
 PERMIT.
  
 1. PLEASE PROVIDE A COPY OF NOTICE OF INTENT (NOI).
 PLEASE APPLY AT FDEP, NPDES STORMWATER SECTION FOR
 NOI.
 YOU CAN GET NOI INFO FROM
 WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/
 NOTICE OF INTENT DEP FORM 62-621.300(4)(B),
 EFFECTIVE MAY 1, 2003
  
 2. PLEASE SHOW ON DRAWINGS THE POLLUTION PREVENTION
 DETAILS,CLOTHES USED FOR SILT FENCE ETC., & PLANS
 SHOWING SILT FENCE AROUND THE SITE ,STORM CATCH BASIN
 DRAINS DURING CONSTRUCTION AND ALL DEMOLITION PHASE.
 HEIGHT OF FENCE SHOULD BE HIGH ENOUGH PER FDEP TO STOP
 DUST PARTICLES.
  
 3. PLEASE PROVIDE A COPY OF BOND FOR ORDINANCE NO.
 4060-07:
  
 ALL DEMOLITION AND NEW CONSTRUCTION PERMITS, WITH
 EXCEPTION OF SINGLE FAMILY, DUPLEX AND ACCESSORY
 APARTMENT, SHALL POST BONDS OR DEPOSITS FOR THE
 FOLLOWING:
  
 1. EROSION CONTROL, AND
 2. LAND STABILIZATION
  
 THE AMOUNT OF THE EROSION CONTROL AND LAND
 STABILIZATION BONDS SHALL BE DETERMINED BY THE ENGINEER
 OF RECORD USING THE CURRENT CITY COST SCHEDULE AND
 VERIFIED BY THE CITY'S ENGINEERING SERVICES DEPT.
 PLEASE CONTACT BRIAN MOREE, ENG SERVICES CONSTRUCTION
 SUPERVISOR, AT 561- 494 -1040 FOR MORE INFORMATION.
  
 UPON VERTICAL CONSTRUCTION COMMENCEMENT, PAYMENT IN
 FULL OF ALL APPLICABLE FEES, AND COMPLIANCE WITH ALL
 TERMS AND CONDITIONS OF ANY POSTED BOND, THE PERMITTEE
 MAY REQUEST RELEASE OF THE BONDS OR DEPOSITS.
  
 A COPY OF ORDINANCE NO. 4060-07 MAY BE OBTAINED FROM
 THE CITY CLERK'S OFFICE LOCATED ON THE FIRST FLOOR.
  
 4. PLEASE SHOW ON DRAWING ALL CITY STANDARDS NOTES FOR
 SIDEWALK, DRIVEWAY, APPROACH, PARKINGS, HANDICAP
 PARKINGS, DUMPSTER ENCLOSURE, YOU CAN GET A C D FOR ALL
 CITY STANDARDS NOTES FROM 1000, 45 STREET, ENGINEERING
 SERVICES, PHONE# 494-1040
  
 5. PLEASE SHOW ON DRAWINGSDUMPSTER & ITS ENCLOSURE
 DETAILS PER CITY OF WPB, &LOCATION ON DWG, LOCATION
 MUST BE ACCESSIBLE FOR PICKUP TRUCK.
  
 6. PLEASE SHOW ON STORM WATER QUALITY CALCULATION THAT
 YOU HAVE CONSIDERED FLOOD ZONE AREA, & 5,10, 25, 100
 YEAR FLOOD CRITERIA AND CROWN OF THE ROAD WHEN YOU
 DETERMINE THE FIRST FLOOR ELEVATION. FIRST FLOOR
 ELEVATION SHOULD BE ATLEAST 1 FOOT HIGHER THAN HIGHEST
 CROWN OF THE ROAD. THESE STORM WATER QUALITY CALS MUST
 BE APPROVED FROM 1000 45TH STREET ENGINEERING SERVICES
 BEFORE WE ISSUE A PERMIT
  
 7. PLEASE SHOW ON DRAINAGE DRAWINGTHE SITE AREA,
 GREEN, LAKE,PARKING AREA, IMPERVIOUS,PERVIOUS AREAYOU
 ARE DEVELOPING FOR THIS PROJECT . PLEASEMAKE SURE
 THESE AREAS SHOWN ON DRAINAGE DRAWINGS MUST MATCH WITH
 AND USED IN STORM WATER QUALITY CALCULATIONS. PLEASE
 PROVIDE A COPY OF THESE CALCULATIONS.
  
 8. PLEASE SHOW ALL STORM WATER PIPES AROUND YOUR SITE
 SO, WE CANSEE THE LAYOUT OF STORM WATER PIPES FROM
 ALL OTHER STORM WATER PIPES. PLEASE SHOW DETAIL OF THE
 CONTROL STRUCTURESWITH ELEVATIONS, NOTCHES, BLEEDING
 ELEVATION, ETC ON DRAWINGS, CALCULATION FOR
 EXFILTRATION TRENCHES, PLEASE SHOW DRY DETENTION/WET
 DETENTION AREAS IN STORM WATER CALS IF YOU HAVE ALL
 THESE. PLEASE RESUBMIT GEO-TECH REPORT AND ALL
 ENVRONMENTAL REPORT.
  
 9. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND
 YOUR SITE FOR STORM WATER DRAIN SO YOUR SITE DO NOT GET
 FLOODED AND HAVE ENOUGH DRAINS.
  
 10. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, GEO-TECH
 REPORT&STORM WATER QUALITY CALCULATIONS. STORM
 WATER CALS MUST BE APPROVED FROM 100045TH STREET
 ENGINEERING SERVICES BEFORE WE APPROVED.
  
  
 PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR
 PERMITTING PROCESS
  
 RASIK CHOKSHI805-6723
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved