| Date |
Text |
| 2008-05-01 13:51:58 | GAS PLAN REVIEW: |
| | DENIED: |
| | |
| | PLAN REVIEW UNDER THE 2004 FLORIDA BUILDING CODES WITH |
| | 2007 REVISIONS, CITY OF WEST PALM BEACH AMENDMENTS TO |
| | CHAPTER 1 (W.P.B.), FLORIDA ADMINISTRATIVE CODE |
| | (F.A.C.), AND FLORIDA STATUTES (F.S.). |
| | |
| | THE FOLLOWING CORRECTIONS/INFORMATION ARE REQUIRED FOR |
| | GAS PLAN REVIEW TO MEET CODE COMPLIANCE. |
| | |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS. PER FBC-2004 |
| | FUEL GAS CODE SECTION 401.1 SCOPE. |
| | *NOTE: NOT ALL CORRESPONDING LENGTHS OF CUT SECTIONS |
| | OF PIPE ARE BEING INDICATED. REFERENCE THE RED CIRCLED |
| | YELLOW HIGH LIGHTED AREAS INDICATING THIS. |
| | |
| | 2. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. PER FBC-2004 FUEL |
| | GAS SECTION 401.1 SCOPE. |
| | *NOTE: THE ONLY PIPING MATERIAL BEING INDICATED IS THE |
| | UNDERGROUND PE PIPE. CLEARLY INDICATE WHAT THE ABOVE |
| | GROUND PIPING MATERIAL IS ON THE RESUBMITTED DRAWINGS. |
| | |
| | 3. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2004 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.6.1 AND TABLES 402.4(1) THRU |
| | 402.4(33). |
| | *NOTE: THIS INCLUDES THE EXISTING BTU LOAD AS WELL AS |
| | THE PROPOSED BTU LOAD. |
| | |
| | 4. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4). |
| | *NOTE: THIS INCLUDES THE EXISTING SYSTEM AS WELL AS |
| | THE PROPOSED SYSTEM DISTANCE FROM THE METER. |
| | |
| | 5. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2. |
| | *NOTE: THERE IS NO APPROVED GAS POOL HEATER THAT HAS |
| | BEEN SUBMITTED FOR THIS POOL. PLEASE SUBMIT TWO COPIES |
| | OF MANUFACTURE SHEETS FOR THE POOL HEATER CLEARLY |
| | INDICATING THE MAKE, MODEL NUMBER, BTU LOAD CAPACITY |
| | AND A LISTING FROM A NATIONALLY RECOGNIZED TESING |
| | LABORATORY. THE FOLLOWING IS BEING INDICATED FOR THE MP |
| | REGULATOR "MAXITROL 325-7L-12". PLEASE CLARIFY WHAT THE |
| | 12 IS FOR ON THIS REGULATOR. PLEASE SUBMIT MANUFACTURE |
| | SHEETS WITH THIS MODEL REGULATOR THAT INDICATES WHAT |
| | THE 12 IS FOR. |
| | |
| | 6. THE VALUE ON THE PERMIT MUST BE ADJUSTED TO THE |
| | FAIR MARKET VALUE (REPLACEMENT VALUE) FOR THE POOL |
| | HEATER, WITH ALL MATERIALS AND LABOR. IF THE VALUE IS |
| | NOT ADJUSTED THEN THE CITY WILL NEED TO ADJUST IT USING |
| | THE MARSHALL & SWIFT NATIONAL VALUATION SERVICE, PER |
| | 2004 WPB AMEND. 108.3. |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY: MIKE PERSON |
| | PLUMBING PLANS EXAMINER |
| | (561) 805-6730 |
| | FAX (561) 805-6731 |
| | E-MAIL: [email protected] |