| Plan Review Notes For Permit 08040391 |
| Permit Number |
08040391 |
|
| Review Stop |
E |
| Sequence Number |
5 |
|
| Notes |
| Date |
Text |
| 2009-03-24 11:17:20 | PLANS ROUTED TO BUILDING AS THE THIRD SET DOES NOT | | | CONTAIN ANY BUILDING STAMPS | | 2009-03-24 11:15:18 | ** PLANS REDLINED ** | | | | | | THE ELECTRICAL SYSTEM/RISER NEEDS TO BE VERIFIED. THE | | | ORIGINAL PLANS CALLED FOR A LIFE SAFETY/ EMERGENCY | | | TRANSFER SWITCH HOWEVER PER THE ENGINEER MR. LON CARTER | | | AND PER PLANS THERE ARE NO EMERGENCY/ 700 SYSTEMS ON | | | THE BACK UP GENERATOR. THIS NEEDS TO BE VERIFIED AS | | | THIS WILL AFFECT THE SYSTEMS AS SHOWN. | | | NEC 700.9 REQUIRES SYSTEMS TO BE SEPARATED. | | | IF THERE ARE ANY ITEMS SUCH AS EMERGENCY LIGHTING ON | | | THE LEGALLY REQUIRED TRANSFER SWITCH THIS MAKES THIS A | | | 700 SYSTEM. ADJUSTMENTS MAY BE NEEDED AT A LATER DATE. | | | BASED ON PLANS, THERE ARE ONLY 701 AND 702 SYSTEMS ON | | | THE GENERATOR. IT IS IMPORTANT THESE ITEMS BE VERIFIED | | | FOR CODE COMPLIANCE. | | | |
|