| Date |
Text |
| 2008-04-09 16:56:50 | ** DENIED REVIEW** |
| | |
| | 1) NOTE: PLEASE BE SURE THE FOLLOWING RELEVANT CODES |
| | ARE STATED ON PLANS FOR ELECTRICAL REVIEW AS A |
| | MINIMUM. |
| | 2004 FBC W/2007 REVISIONS. |
| | 2005 NFPA-70 |
| | 2003 NFPA-101 |
| | |
| | PER: FBC 106.1.2, 106.3.5, FS 553.73 |
| | |
| | 2) NOTE: PLEASE SHOW THE LOCATION OF THE NEW SERVICE |
| | WHICH IS NOT GOING TO BE INSTALLED ON THIS NEW |
| | BUILDING. AS THIS IS NOT SHOWN AT THIS TIME. |
| | 110.26, 240.24, 230.70 ETC |
| | FBC 106.1.2, 106.3.5.1.2 |
| | |
| | 3) NOTE: PLEASE CORRELATE SITE PLANS AND ELECTRICAL |
| | PLANS. THE ELECTRICAL SPECIFIED ON SITE PLANS IS NOT |
| | THE SAME AS ON ELECTRICAL PLANS. |
| | ONE EXAMPLE IS: |
| | PLEASE SEE SITE PLANS WHICH SHOW A 125AMP MAIN |
| | DISCONNECT AT NEW BUILDING YET THE ELECTRICAL RISER ON |
| | SHEET 3 SHOWS 200AMP.? |
| | ** THIS IS NOT ALL ITEMS. |
| | |
| | 4) NOTE: PLEASE SUBMIT LIGHTING PERFORMANCE |
| | CALCULATIONS PER 13-415.2. PLEASE BE SURE TO SEE |
| | 13-415.2.ABC.1.1, .1.2 AND .1.3. |
| | PLEASE ALSO SEE AS BUILDING APPEARS TO BE CONDITIONED |
| | SPACE, PLEASE SUBMIT ENERGY CALCULATIONS. SEE POSSIBLE |
| | MECHANICAL REVIEW NOTES. |
| | |
| | 5) NOTE: PLEASE SEE THE ELECTRICAL PLANS DO INDICATE A |
| | NEW CONDENSING UNIT HOWEVER THE PLANS DOES NOT SHOW |
| | LOCATION OF THIS UNIT, LOCATION OF DISCONNECT OR |
| | REQUIRED GFI DEPENDING ON NEW LOCATION. |
| | 110.26, 440.11, 210.8B, 210.63 ETC |
| | |
| | 6) NOTE: PLEASE INDICATE CIRCUITING FOR EMERGENCY |
| | LIGHTS/EXIT LIGHTS PER 700.12F. |
| | |
| | 7) NOTE: PLEASE SEE THE LOAD ON THE CONDENSING UNIT |
| | CIRCUIT EXCEEDS THAT OF THE BRANCH CIRCUIT WHICH IS |
| | PROVIDED. THIS INCLUDES CONDUCTORS AND BREAKER. 240.4, |
| | 310.16, 408.4 ETC. |
| | FBC 106.3.5.1.2 |
| | |
| | 8) NOTE: PLEASE SE THE LOAD ON THE WELDER UNIT CIRCUIT |
| | EXCEEDS THAT OF THE BRANCH CIRCUIT WHICH IS PROVIDED. |
| | THIS INCLUDES CONDUCTORS AND BREAKER. 240.4, 310.16, |
| | 408.4 ETC. |
| | FBC 106.3.5.1.2 |
| | FOR EXAMPLE: PANEL SCHEDULE SHOWS 20.8 AMPS ON EACH |
| | PHASE OF THE PANEL FOR THIS UNIT AS WELL AS THE SAME AS |
| | SHOWN FOR CONDENSING UNIT ABOVE. THIS IS SHOWN PER |
| | PHASE WHICH IS 41.6 AMPS. |
| | |
| | 9) NOTE: PLEASE INDICATE AND SHOW LIGHTING CONTROLS PER |
| | 13-415.1.ABC.1.4 FOR EXTERIOR LIGHTING ON BUILDING. ONE |
| | OF TWO PERMITTED CONTROLS MUST BE USED. |
| | |
| | 10) NOTE: PLEASE SEE MISSING EQUIPMENT GROUNDING |
| | CONDUCTORS AFTER THE FIRST MEANS OF DISCONNECT. |
| | PLEASE SEE FROM NEW MAIN B TO MAIN AT THE DETACHED |
| | BUILDING. |
| | 250.110, 250.24, 250.122, 250.32. |
| | |
| | ** THIS OFFICE EXPRESSES THAT IF THERE ARE ANY |
| | COMMENTS, QUESTIONS OR CLARIFICATION NEEDED TO PLEASE |
| | DO NOT HESITATE IN CONTACTING THIS OFFICE. |
| | PLEASE SEE BELOW FOR CONTACT INFORMATION. |
| | |
| | ** IMPORTANT** |
| | ONCE ALL REVIEWS ARE DONE AND PLANS ARE PICKED UP FOR |
| | CORRECTIONS, PLEASE BE SURE TO COMPLETELY REMOVE ALL |
| | OLD/VOIDED SHEETS AND ONLY INSERT NEW REVISED SHEETS |
| | INTO TWO COMPLETE SETS FOR REVIEW AND STAMPING. DO NOT |
| | LEAVE ANY OLD/VOIDED SHEETS IN SETS. |
| | PLEASE DO NOT ATTACH SUPPORTING DOCUMENTS TO PLANS. ANY |
| | ADDITIONAL DOCUMENTATION SUCH AS PRODUCT APPROVALS, |
| | SPEC/CUT SHEETS, CALCULATIONS ETC SHOULD BE PLACED INTO |
| | TWO SETS/FOLDERS/BINDERS ETC. |
| | PLEASE KNOW ONLY ONE SET OF THE OLD/VOIDED SHEETS |
| | SHOULD BE SUBMITTED FOR REFERENCE. |
| | THIS WILL HELP IN THE REVIEW PROCESS AND AVOID ANY |
| | DELAYS. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW II |
| | CONSTRUCTION SERVICES DEPT. |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |
| | [email protected] |