2008-04-09 16:56:50** DENIED REVIEW**
  
 1) NOTE: PLEASE BE SURE THE FOLLOWING RELEVANT CODES
 ARE STATED ON PLANS FOR ELECTRICAL REVIEW AS A
 MINIMUM.
 2004 FBC W/2007 REVISIONS.
 2005 NFPA-70
 2003 NFPA-101
  
 PER: FBC 106.1.2, 106.3.5, FS 553.73
  
 2) NOTE: PLEASE SHOW THE LOCATION OF THE NEW SERVICE
 WHICH IS NOT GOING TO BE INSTALLED ON THIS NEW
 BUILDING. AS THIS IS NOT SHOWN AT THIS TIME.
 110.26, 240.24, 230.70 ETC
 FBC 106.1.2, 106.3.5.1.2
  
 3) NOTE: PLEASE CORRELATE SITE PLANS AND ELECTRICAL
 PLANS. THE ELECTRICAL SPECIFIED ON SITE PLANS IS NOT
 THE SAME AS ON ELECTRICAL PLANS.
 ONE EXAMPLE IS:
 PLEASE SEE SITE PLANS WHICH SHOW A 125AMP MAIN
 DISCONNECT AT NEW BUILDING YET THE ELECTRICAL RISER ON
 SHEET 3 SHOWS 200AMP.?
 ** THIS IS NOT ALL ITEMS.
  
 4) NOTE: PLEASE SUBMIT LIGHTING PERFORMANCE
 CALCULATIONS PER 13-415.2. PLEASE BE SURE TO SEE
 13-415.2.ABC.1.1, .1.2 AND .1.3.
 PLEASE ALSO SEE AS BUILDING APPEARS TO BE CONDITIONED
 SPACE, PLEASE SUBMIT ENERGY CALCULATIONS. SEE POSSIBLE
 MECHANICAL REVIEW NOTES.
  
 5) NOTE: PLEASE SEE THE ELECTRICAL PLANS DO INDICATE A
 NEW CONDENSING UNIT HOWEVER THE PLANS DOES NOT SHOW
 LOCATION OF THIS UNIT, LOCATION OF DISCONNECT OR
 REQUIRED GFI DEPENDING ON NEW LOCATION.
 110.26, 440.11, 210.8B, 210.63 ETC
  
 6) NOTE: PLEASE INDICATE CIRCUITING FOR EMERGENCY
 LIGHTS/EXIT LIGHTS PER 700.12F.
  
 7) NOTE: PLEASE SEE THE LOAD ON THE CONDENSING UNIT
 CIRCUIT EXCEEDS THAT OF THE BRANCH CIRCUIT WHICH IS
 PROVIDED. THIS INCLUDES CONDUCTORS AND BREAKER. 240.4,
 310.16, 408.4 ETC.
 FBC 106.3.5.1.2
  
 8) NOTE: PLEASE SE THE LOAD ON THE WELDER UNIT CIRCUIT
 EXCEEDS THAT OF THE BRANCH CIRCUIT WHICH IS PROVIDED.
 THIS INCLUDES CONDUCTORS AND BREAKER. 240.4, 310.16,
 408.4 ETC.
 FBC 106.3.5.1.2
 FOR EXAMPLE: PANEL SCHEDULE SHOWS 20.8 AMPS ON EACH
 PHASE OF THE PANEL FOR THIS UNIT AS WELL AS THE SAME AS
 SHOWN FOR CONDENSING UNIT ABOVE. THIS IS SHOWN PER
 PHASE WHICH IS 41.6 AMPS.
  
 9) NOTE: PLEASE INDICATE AND SHOW LIGHTING CONTROLS PER
 13-415.1.ABC.1.4 FOR EXTERIOR LIGHTING ON BUILDING. ONE
 OF TWO PERMITTED CONTROLS MUST BE USED.
  
 10) NOTE: PLEASE SEE MISSING EQUIPMENT GROUNDING
 CONDUCTORS AFTER THE FIRST MEANS OF DISCONNECT.
 PLEASE SEE FROM NEW MAIN B TO MAIN AT THE DETACHED
 BUILDING.
 250.110, 250.24, 250.122, 250.32.
  
 ** THIS OFFICE EXPRESSES THAT IF THERE ARE ANY
 COMMENTS, QUESTIONS OR CLARIFICATION NEEDED TO PLEASE
 DO NOT HESITATE IN CONTACTING THIS OFFICE.
 PLEASE SEE BELOW FOR CONTACT INFORMATION.
  
 ** IMPORTANT**
 ONCE ALL REVIEWS ARE DONE AND PLANS ARE PICKED UP FOR
 CORRECTIONS, PLEASE BE SURE TO COMPLETELY REMOVE ALL
 OLD/VOIDED SHEETS AND ONLY INSERT NEW REVISED SHEETS
 INTO TWO COMPLETE SETS FOR REVIEW AND STAMPING. DO NOT
 LEAVE ANY OLD/VOIDED SHEETS IN SETS.
 PLEASE DO NOT ATTACH SUPPORTING DOCUMENTS TO PLANS. ANY
 ADDITIONAL DOCUMENTATION SUCH AS PRODUCT APPROVALS,
 SPEC/CUT SHEETS, CALCULATIONS ETC SHOULD BE PLACED INTO
 TWO SETS/FOLDERS/BINDERS ETC.
 PLEASE KNOW ONLY ONE SET OF THE OLD/VOIDED SHEETS
 SHOULD BE SUBMITTED FOR REFERENCE.
 THIS WILL HELP IN THE REVIEW PROCESS AND AVOID ANY
 DELAYS.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved