| 2008-06-09 08:09:24 | ***FAILED - RESUB #1 (SCOPE OF WORK INCREASED)*** |
| | |
| | |
| | 1)AS THE SCOPE OF WORK HAS BEEN INCREASED (ADDITION |
| | OF CANOPIES, PARKING, AND LANDSCAPING), THE DECLARED |
| | VALUE SHALL BE INCREASED TO ACCURATELY REFLECT THE |
| | WORK.ANY ADDITIONAL PEMIT FEES SHALL BE PAID |
| | ACCORDINGLY. |
| | |
| | 2)ANY/ALL SIGNAGE SHALL BE PERMITTED SEPARATELY. |
| | COPY TO BE REMOVED FROM PLANS OR LABELED "TO BE |
| | PERMITTED SEPARATELY". |
| | |
| | 3)PURSUANT TO SECTION 94-305(E) OF THE CITY'S ZONING |
| | AND LAND DEVELOPMENT REGULATIONS (ZLDRS):VISIBILITY |
| | AT INTERSECTIONS.AT ANY ROAD INTERSECTIONS, |
| | VISIBILITY SHALL NOT BE OBSCURED BY THE CONSTRUCTION, |
| | PLACEMENT, OR MAINTENANCE OF A STRUCTURE WALL, SIGN, |
| | FENCE, BERM, PLANT MATERIAL, SHRUBS, OR ANY SIMILAR |
| | ITEM BETWEEN 18 INCHES OR EIGHT FEET IN HEIGHT WITHIN A |
| | TRIANGLE BEGINNING AT THE POINT WHERE PROPERTY LINES |
| | MEET AT THE CORNER, THEN 20 FEET ALONG THE FRONT |
| | PROPERTY LINE, THENCE DIAGONALLY TO A POINT ALONG THE |
| | SIDE PROPERTY LINE 20 FEET FROM THE POINT OF BEGINNING, |
| | AND THENCE TO THE POINT OF BEGINNING. IN THE EVENT THE |
| | CORNER OF AN INTERSECTION IS ROUNDED, THE MEASUREMENT |
| | SHALL BEGIN AT THE POINT THE PROPERTY LINES WOULD MEET |
| | WITHOUT ROUNDING. (SEE FIGURE X-1) |
| | |
| | NO PLANT MATERIAL SHALL ENCROACH THE VISIBILITY |
| | TRIANGLE AT THE CORNER OF DIXIE HIGHWAY AND MADDOCK |
| | STREET.REVISE PROPOSED PLANT MATERIAL TO A SIZE LESS |
| | THAN 18" IN HEIGHT AT MATURITY.NOTE: REQUIRED SHADE |
| | TREE AT LANDSCAPE TERMINAL ISLAND SHALL BE SHOWN |
| | OUTSIDE OF THE VISIBILITY TRIANGLE. |
| | |
| | 4)PROPOSED LIGHTING SHALL BE SHOWN OUTSIDE OF THE |
| | VISIBILITY TRIANGLE (SECTION 94-305(E)) AND SHALL NOT |
| | INTERFERE WITH ANY REQUIRED LANDSCAPING MATERIAL. |
| | |
| | 5)NORTH ARROW IS NOT CORRECT ON PLANTING PLAN (SHEET |
| | PL 1.00).REVISE. |
| | |
| | 6)SITE PLAN (SHEET SP-1) AND PLANTING PLAN (SHEET PL |
| | 1.00) DO NOT MATCH WITH RESPECT TO THE REQUIRED 5' |
| | LANDSCAPE BUFFER AT THE NORTH SIDE OF THE PROPERTY. |
| | REVISE SO ALL PLANS AND DIMENSIONS COORELATE.PLEASE |
| | SHOW ALL DIMENSIONS OF REQUIRED ISLANDS/BUFFERS. |
| | |
| | 7)PURSUANT TO SECTION 94-443(B)(4) OF THE THE ZLDRS: |
| | AT LEAST ONE SHADE OR FLOWERING TREE SHALL BE PLANTED |
| | IN A REQUIRED BUFFER STRIP FOR EACH 30 LINEAR FEET OR |
| | PORTION THEREOF. PAVED AREAS USED FOR PEDESTRIAN |
| | CIRCULATION AND VEHICULAR ACCESS SHALL BE INCLUDED WHEN |
| | CALCULATING THE LENGTH OF THE BUFFER STRIP. TREES MAY |
| | BE CLUSTERED OR PLANTED IRREGULARLY AS DEEMED |
| | APPROPRIATE. CLUSTERING OF REQUIRED TREES SHALL BE |
| | SUBJECT TO CITY APPROVAL. |
| | |
| | PROVIDE SHADE TREES EVERY 30' ALONG DIXIE HIGHWAY |
| | FRONTAGE AS REQUIRED BY THIS SECTION. |
| | |
| | 8)ALL REQUIRED LANDSCAPE ISLANDS/TERMINAL ISLANDS |
| | SHALL MEET THE MINIMUM REQUIRED 5' WIDTH, MEASURED FROM |
| | THE INSIDE OF THE CURBING.PLEASE REVISE/RECONFIGURE |
| | NORTHERN MOST INTERIOR ISLAND AND NORTH TERMINAL ISLAND |
| | (DIRECTLY WEST OF FRONT BUILDING FACADE) TO REFLECT THE |
| | MINIMUM WIDTH. |
| | |
| | 9)AS THE WESTERN-MOST ROW OF PARKING ALONG DIXIE |
| | HIGHWAY EXCEEDS THE LENGTH OF 10 CONTIGUOUS PARKING |
| | SPACES, THE REQUIRED 5' INTERIOR ISLAND SHALL BE |
| | PROVIDED, OR THE ROW/TERMINAL ISLANDS SHALL BE |
| | RECONFIGURED SO-AS NOT TO EXCEED THE LENGTH OF 10 |
| | STANDARD PARKING SPACES. |
| | |
| | 10)TWO (2) DIFFERENT SITE PLANS HAVE BEEN SUBMITTED, |
| | ONLY ONE NEED BE SUBMITTED WITH THE PROPOSED SCOPE OF |
| | WORK ON IT. |
| | |
| | |
| | QUESTIONS/COMMENTS, CONTACT CHRIS HOOPS, |