| Date |
Text |
| 2008-04-12 11:24:02 | REVIEW #: 1ST |
| | ACTION: DENIED |
| | |
| | FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS |
| | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | 1. PG M-1: STORAGE ROOM 100 SHOWS AN AIR TRANSFER |
| | OPENING WITH FIRE DAMPER TO REMAIN IN THE WALL AT |
| | CORRIDOR. PG A-1 SHOWS A DOUBLE DOOR BEING DEMOLISHED |
| | AND A NEW RATED WALL BEING BUILT AT THIS LOCATION. IS |
| | THIS FIRE DAMPER TO BE REMOVED AND REINSTALLED, |
| | REPLACED, OR IS IT EXPECTED TO BE UNDISTURBED DURING |
| | THIS WALL RECONFIGURATION? PLEASE CLARIFY. FBCM 607.1 |
| | AND FBCB 106.1.1 |
| | |
| | 2. PG M-1: DUCT SMOKE DETECTOR FOR AHU-1 SHALL BE TIED |
| | INTO THE BUILDING FIRE ALARM SYSTEM IN ACCORDANCE WITH |
| | FBCM 606.4.1. |
| | |
| | 3. PG M-1: KEYNOTE #12 CALLS FOR REFRIGERANT LINES TO |
| | PENETRATE THE FLOOR/CEILING ASSEMBLY TO THE FIRST |
| | FLOOR. PROVIDE A THROUGH-PENETRATION FIRESTOP SYSTEM |
| | ASSEMBLY DETAIL TO SHOW HOW THESE PENETRATIONS ARE TO |
| | BE PROTECTED IN ACCORDANCE WITH FBCB 712.4. |
| | |
| | 4. PG M-1 AND M-2: ALL RECONFIGURED SPACES INTENDED FOR |
| | OCCUPANCY SHALL BE PROVIDED WITH NATURAL OR MECHANICAL |
| | VENTILATION OR EXHAUST IN ACCORDANCE WITH FBCEB 609.1 |
| | AND FBCM 401.2. AS NATURAL VENTILATION IS NOT BEING |
| | PROPOSED, PROVIDE OUTDOOR AIR CALCULATIONS IN |
| | ACCORDANCE WITH FBCM TABLE 403.3 OR SECTION 403.4. |
| | DECLARE ON PLANS WHICH METHOD IS BEING USED FOR THESE |
| | CALCULATIONS. |
| | |
| | 5. PG M-2: FAN SCHEDULE CALLS FOR EF-10 AND EF-12 TO |
| | RUN CONTINUOUSLY, INTERLOCKED WITH AHU-1 FAN. HOWEVER, |
| | PG E-2 SHOWS THESE FANS BEING CONTROLLED BY WALL |
| | SWITCHES. COORDINATE PLANS, SCHEDULES AND NOTES TO SHOW |
| | ACTUAL DESIGN INTENT. FBCM 401.1, FBCB 106.1.1. |
| | |
| | 6. PG M-1: NOTE #17 CALLS FOR EXHAUST DUCT IN PLENUM TO |
| | BE ENCLOSED IN A DUCT. THE EXHAUST DUCT SHALL BE |
| | ISOLATED FROM THE PLENUM BY PLENUM CONSTRUCTION USING |
| | AN APPROVED PLENUM/AIR BARRIER IN ACCORDANCE WITH FBCM |
| | 603.8 TO BE CONSIDERED OUTSIDE THE PLENUM SPACE. ANY |
| | OTHER METHOD OF ISOLATION FROM THE PLENUM SPACE SHALL |
| | BE SUBMITTED TO THE BUILDING OFFICIAL IN WRITING UNDER |
| | THE PROVISIONS OF FBCB 104.11 FOR ALTERNATE MATERIALS |
| | AND METHODS. |
| | |
| | 7. ENERGY CALCULATIONS: MECHANICAL PORTIONS OK. PLEASE |
| | SEE ELECTRICAL COMMENT #2 REGARDING SIGNATURE AND SEAL |
| | ON THE CERTIFICATION PAGE. |
| | |
| | NOTE: PLEASE RESPOND TO EACH REVIEW COMMENT IN WRITING |
| | TO SPEED THE RESUBMITTAL PROCESS. REMOVE ALL OLD/VOIDED |
| | SHEETS FROM RESUBMITTED PLANS AND RETURN ONE OLD SET |
| | FOR REFERENCE. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| | RONALD J. REGUEIRO |
| | 561.805.6719 |
| | [email protected] |