2009-03-10 15:41:56** DENIED REVISIONS **
  
 1) NOTE: NOT ALL CHANGES AND REVISIONS ON SHEETS HAVE
 BEEN IDENTIFIED WITH CLOUDS AND TRIANGLES.
 FOR EXAMPLE: PLEASE SEE E1110 WHICH CONTAINS A
 SUBSTANTIAL AMOUNT OF REVISIONS MOST ARE NOT
 IDENTIFIED.
 FOR EXAMPLE: PLEASE SEE E001 WHERE CLOUDS ARE SHOWN
 HOWEVER NO IDENTIFICATION IS SHOWN.
  
 ** THESE ARE TWO EXAMPLES ONLY. THERE ARE OTHERS.
 PLEASE BE SURE ALL REVISIONS ARE IDENTIFIED ON PLANS.
  
 FBC 106.5, 106.1.1, 106.1.2 FOR CLARITY, ADDITIONAL
 INFORMATION OF RECORD PLANS.
 FBC CHAPTER 13, CHAPTER 10, NEC 2005.
  
 2) NOTE: PLANS NOW HAVE MOST ALL PREVIOUS BATTERY BACK
 UP FIXTURES REMOVED. BASED ON THE REVISED PLANS THIS IS
 NOT PERMITTED AS SHOWN. A STRAIGHT NATURAL GAS
 GENERATOR IS NOT PERMITTED BY THIS AHJ.
 THIS WAS GONE OVER BEFORE PERMIT OF BUILDING WAS ISSUED
 YET PLANS ARE NOW ONCE AGAIN BEING REVISED TO GO BACK
 TO SOMETHING THAT HAD ALREADY BEEN COMMENTED ON.
 PLEASE SEE 700.12.B.3. ONSITE FUEL SHALL BE REQUIRED.
 PLEASE SEE NFPA-101 AS THE BACK UP POWER SOURCE FOR
 EMERGENCY LIGHTING FIXTURES ARE AT THE DETERMINATION OF
 THE AHJ. SECTION 7.8.2.1.
 THE CODE IS SPECIFIC TO THE REQUIREMENT OF ON-SITE FUEL
 REQUIRED. PLEASE SEE FBC CHAPTER 10, 1006.2.3.
  
 3) NOTE: PLEASE PROVIDE COMPLETE STOCK OF MATERIALS AND
 RETAIL GOODS IN AREAS IN WHICH DESIRED USED OF *FINE
 MERCHANDISE* IS PLACED IN THE INPUT DATA REPORT OF THE
 ENERGY CALCULATIONS.
 THE AMOUNT OF FINE MERCHANDISE WOULD BE LIMITED TO
 SQUARE FEET OF DISPLAY AREA ONLY. NOT AREAS OF GENERAL
 LIGHTING. PLEASE ALSO KNOW THAT THIS ALLOWANCE MAY BE
 USED FOR ITEMS SUCH AS JEWELRY AS NOTED IN THE CODE
 HOWEVER BASED ON THE CALCULATIONS ALL DISPLAY AREAS ARE
 NOTED AS FINE MERCHANDISE WHICH DOES NOT POSSIBLE OR
 PERMISSIBLE.
 FBC 13-415.2, 13-415.2.ABC.1.1, .1.2, 13-415.2.B.2 ETC
  
 4) NOTE: ALL EGRESS PATHS SHALL CONTAIN THE BATTERY
 BACK UP FIXTURES SUCH AS STAIRS. SOME STAIR AREAS STILL
 CONTAIN FIXTURES AS NOTED HOWEVER STAIRS SUCH AS THE
 MAIN EGRESS STAIRS AT THE REAR OF THE STORE HAVE NOW
 BEEN REVISED TO REMOVE SUCH FIXTURES.
 THIS WILL NOT BE PERMITTED. THIS WAS GONE OVER
 EXTENSIVELY BEFORE PERMIT ISSUANCE YET THE PLANS HAVE
 NOW BEEN REVISED TO GO BACK TO PREVIOUS COMMENTS.
 NFPA-101 7.8.1.3, 7.9.2.1, 7.9.2.2, FBC 1006, NEC
 700.12B3 ETC
  
 5) NOTE: PLEASE BE SURE ALL ITEMS IN THE INPUT DATA
 REPORT COORDINATES WITH *ALL* LIGHTING ON PLANS. ISSUED
 PERMIT WAS BASED ON SOME ERRORS HOWEVER BASED ON THE
 FBC 13-103.3 STATES WITHOUT GROSS ERRORS.
 AS THERE HAS BEEN NUMEROUS FIXTURES ADDED, TYPES OF
 FIXTURES REVISED, TYPES OF FIXTURES TO BE REVISED AND
 ACTUAL REMOVAL OF SEVERAL OTHER FIXTURES THE PLANS AND
 CALCULATIONS NEED TO COORDINATE COMPLETELY.
 ** ONE EXAMPLE WOULD BE FIXTURES ON PREVIOUS
 CALCULATIONS WHICH WERE 85VA ARE NOW 58 VA WHICH IS OK,
 HOWEVER THIS DOES NOT COORDINATE WITH THE FIXTURE
 LEGEND.
 ** FOR EXAMPLE: FIXTURES IN AREAS AND ROOMS ON PLANS
 NEED TO MATCH THE IDR. ONE LOCATION ALONE WOULD BE ROOM
 105.
  
 6) NOTE: TO DATE OF THIS REVIEW NO LOW VOLTAGE PERMIT
 APPLICATION HAS BEEN SUBMITTED. PLEASE KNOW THAT THE
 LOW VOLTAGE SCOPE OF WORK ON PLANS NEEDS TO BE UNDER A
 SEPARATE PERMIT AS NOTED ON ORIGINAL REVIEWS.
 PERMIT FEE BASED ON THE LOW VOLTAGE VALUATION WOULD BE
 REQUIRED AT THE TIME OF PERMIT APPLICATION.
  
 7) NOTE: PLEASE SEE PREVIOUS PROVISO ISSUANCE OF
 9/29/08. NO SELECTIVE COORDINATION STUDY, TIME CURVES
 ETC HAVE BEEN SUBMITTED TO DATE. PLEASE SEE 700.27,
 701.8, 240.12, NFPA-110 6.5.1 ETC
  
 8) NOTE: PLEASE BE SURE ALL PLANS AS NOTED ABOVE HAVE
 ALL REVISIONS LABELED WITH CLOUDS AND TRIANGLES. THERE
 ARE SEVERAL LOCATIONS WHERE THE PLANS CONTAIN CLOUDS
 YET THERE IS NO IDENTIFICATION OF THE REVISIONS TO
 COORDINATE WITH THE TITLE BLOCKS. SEE SHEET E341 FOR
 EXAMPLE;
 FBC 106.1.1,106.1.2, 106.5.
 NEC 2005, 240, 310, 220 ETC CHAPTERS GIVEN IN GENERAL
 FOR COORDINATION.
  
 9) NOTE: RISER DIAGRAM HAS BEEN COMPLETELY REVISED TO
 NOW INCLUDE A NEW PANEL HPE-1 400AMP YET NO PANEL
 SCHEDULE FOR LOADS ETC WAS SUBMITTED.
 PLEASE SEE 700.9 FOR WIRING OF LIFE SAFETY SYSTEMS WITH
 OTHER SYSTEMS. WHAT TYPE OF PANEL IS HPE?
 WITH THIS REVISION IF YOU LOSE THE 150KW GENERATOR AND
 THE NEW 40KW UNIT HANDLES THE LIFE SAFETY LOADS, WHAT
 TAKES CARE OF THE LEGALLY REQUIRED ITEMS? (701 LOADS).
 THIS COMMENT ALONG WITH SEVERAL OTHERS ABOVE NEED TO BE
 GONE OVER AS SOON AS POSSIBLE AS THE DESIGN CHANGES
 WILL HAVE A MAJOR IMPACT OF THE BUILDING CONSTRUCTION
 TIME FRAME.
  
  
 **** IMPORTANT> ANY SHEETS WHICH DID NOT NEED TO HAVE
 CHANGES MADE NEED TO BE PLACED BACK INTO THE SETS WHEN
 RESUBMITTING THE REVISIONS.
  
  
  
 IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT
 TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO
 CONTACT THIS REVIEWER.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved